Activos agregados recientemente:    GN47D   GN47O   IRCOD   IRCOO   LECGD   LECGO   MGCLO   MSSFD   MSSFO   OTS2D   OTS2O   PECGD   PECGO   PNXCD   PNXCO   S14F5   S15G5   STCED   STCEO   TC25P   TZXO5   TZXO6   TZXY5   YFCGD   YFCGO   YFCID   YFCIO
Bonos de la Repulica Argentina a la Par en Pesos Step Up Vto. 2038
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2023-09-30100.008807.4877.950.0077.95
2024-03-31100.0020635.02182.620.00182.62
2024-09-30100.0031638.84280.000.00280.00
2025-03-31100.0033773.61298.900.00298.90
2025-09-30100.0033773.61298.900.00298.90
2026-03-31100.0033773.61298.900.00298.90
2026-09-30100.0033773.61298.900.00298.90
2027-03-31100.0033773.61298.900.00298.90
2027-09-30100.0033773.61298.900.00298.90
2028-03-31100.0033773.61298.900.00298.90
2028-09-30100.0033773.61298.900.00298.90
2029-03-31100.0033773.61298.900.00298.90
2029-09-3095.0032084.92418.791688.682107.47
2030-03-3190.0030396.24397.851688.682086.53
2030-09-3085.0028707.56376.911688.682065.59
2031-03-3180.0027018.88355.971688.682044.65
2031-09-3075.0025330.20335.031688.682023.71
2032-03-3170.0023641.52314.091688.682002.77
2032-09-3065.0021952.84293.151688.681981.84
2033-03-3160.0020264.16272.221688.681960.90
2033-09-3055.0018575.48251.281688.681939.96
2034-03-3150.0016886.80230.341688.681919.02
2034-09-3045.0015198.12209.401688.681898.08
2035-03-3140.0013509.44188.461688.681877.14
2035-09-3035.0011820.76167.521688.681856.20
2036-03-3130.0010132.08146.581688.681835.26
2036-09-3025.008443.40125.641688.681814.32
2037-03-3120.006754.72104.701688.681793.38
2037-09-3015.005066.0483.761688.681772.44
2038-03-3110.003377.3662.821688.681751.50
2038-09-305.001688.6841.881688.681730.56
2038-12-310.000.0010.471688.681699.15
Datos
SimboloPARPValor Tecnico33858.29Semana TIR4.26%
EmisorArgentinaArgentinaValor Residual100.00%Mes TIR-22.58%
TipoSoberanoParidad60.00%Semestre TIR38.00%
PaísArgentinaTIR8.57%1ero Enero TIR126.12%
MercadoBYMAMacaulay Dur.8.04Año TIR-25.54%
MonedaARSModified Dur.7.40Semana Precio-1.62%
Fecha/Hora2024-11-20 17:00:04Effective Dur.0.63Mes Precio25.25%
Volumen0Convexidad71.20Semestre Precio15.36%
Precio20315.00Int. Corrido84.691ero Enero Precio97.31%
Variación0.00%Cupon298.90Año Precio318.87%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
22346.5010.00%7.30-14.81%
22143.359.00%7.42-13.41%
21940.208.00%7.54-11.99%
21737.057.00%7.67-10.55%
21533.906.00%7.79-9.10%
21330.755.00%7.92-7.64%
21127.604.00%8.04-6.14%
20924.453.00%8.17-4.64%
20721.302.00%8.30-3.11%
20518.151.00%8.44-1.57%
20315.000.00%8.570.00%
20111.85-1.00%8.711.59%
19908.70-2.00%8.843.20%
19705.55-3.00%8.984.82%
19502.40-4.00%9.126.48%
19299.25-5.00%9.278.14%
19096.10-6.00%9.419.85%
18892.95-7.00%9.5611.56%
18689.80-8.00%9.7113.30%
18486.65-9.00%9.8615.08%
18283.50-10.00%10.0216.87%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
9.349.00%19195.93-5.51%
9.268.00%19316.14-4.92%
9.177.00%19437.33-4.32%
9.086.00%19559.51-3.72%
9.005.00%19682.70-3.11%
8.914.00%19806.89-2.50%
8.833.00%19932.11-1.88%
8.742.00%20058.36-1.26%
8.661.00%20185.66-0.64%
8.570.00%20315.000.00%
8.48-1.00%20443.410.63%
8.40-2.00%20573.891.27%
8.31-3.00%20705.451.92%
8.23-4.00%20838.102.57%
8.14-5.00%20971.873.23%
8.06-6.00%21106.743.90%
7.97-7.00%21242.744.57%
7.88-8.00%21379.885.24%
7.80-9.00%21518.175.92%
Desarrollo TIR
Desarrollo TIR 8.57%
FechaFormulaOperacionFactorTipo
2025-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(129/360)]290.22i
2025-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(309/360)]278.53i
2026-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(489/360)]267.31i
2026-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(669/360)]256.54i
2027-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(849/360)]246.21i
2027-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1029/360)]236.29i
2028-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1209/360)]226.77i
2028-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1389/360)]217.64i
2029-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1569/360)]208.87i
2029-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1749/360)]280.87i
2029-09-30[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(1749/360)]1132.55k
2030-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 95.00% x 100.00]/[(1+8.57)^(1929/360)]256.08i
2030-03-31[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(1929/360)]1086.93k
2030-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 90.00% x 100.00]/[(1+8.57)^(2109/360)]232.83i
2030-09-30[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2109/360)]1043.15k
2031-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 85.00% x 100.00]/[(1+8.57)^(2289/360)]211.04i
2031-03-31[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2289/360)]1001.13k
2031-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 80.00% x 100.00]/[(1+8.57)^(2469/360)]190.62i
2031-09-30[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2469/360)]960.81k
2032-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 75.00% x 100.00]/[(1+8.57)^(2649/360)]171.51i
2032-03-31[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2649/360)]922.11k
2032-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 70.00% x 100.00]/[(1+8.57)^(2829/360)]153.63i
2032-09-30[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2829/360)]884.97k
2033-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 65.00% x 100.00]/[(1+8.57)^(3009/360)]136.91i
2033-03-31[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3009/360)]849.32k
2033-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 60.00% x 100.00]/[(1+8.57)^(3189/360)]121.29i
2033-09-30[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3189/360)]815.11k
2034-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 55.00% x 100.00]/[(1+8.57)^(3369/360)]106.70i
2034-03-31[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3369/360)]782.28k
2034-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 50.00% x 100.00]/[(1+8.57)^(3549/360)]93.10i
2034-09-30[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3549/360)]750.77k
2035-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 45.00% x 100.00]/[(1+8.57)^(3729/360)]80.41i
2035-03-31[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3729/360)]720.53k
2035-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 40.00% x 100.00]/[(1+8.57)^(3909/360)]68.60i
2035-09-30[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3909/360)]691.51k
2036-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 35.00% x 100.00]/[(1+8.57)^(4089/360)]57.61i
2036-03-31[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4089/360)]663.66k
2036-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 30.00% x 100.00]/[(1+8.57)^(4269/360)]47.39i
2036-09-30[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4269/360)]636.92k
2037-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 25.00% x 100.00]/[(1+8.57)^(4449/360)]37.90i
2037-03-31[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4449/360)]611.27k
2037-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 20.00% x 100.00]/[(1+8.57)^(4629/360)]29.10i
2037-09-30[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4629/360)]586.65k
2038-03-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 15.00% x 100.00]/[(1+8.57)^(4809/360)]20.94i
2038-03-31[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4809/360)]563.02k
2038-09-30[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (180/360)) x 337.7361 x 10.00% x 100.00]/[(1+8.57)^(4989/360)]13.40i
2038-09-30[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4989/360)]540.34k
2038-12-31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0248 x (90/360)) x 337.7361 x 5.00% x 100.00]/[(1+8.57)^(5079/360)]3.28i
2038-12-31[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(5079/360)]529.35k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2024-11-21(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones)(0.0177 x (180/360)) x 337.74 x 1 x 100.00 x (51/180)84.69
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-03-31(Dias para cupon / Dias Año)(129 / 360)0.36[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(129/360)]290.220.010.01i
2025-09-30(Dias para cupon / Dias Año)(309 / 360)0.86[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(309/360)]278.530.010.01i
2026-03-31(Dias para cupon / Dias Año)(489 / 360)1.36[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(489/360)]267.310.010.02i
2026-09-30(Dias para cupon / Dias Año)(669 / 360)1.86[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(669/360)]256.540.010.02i
2027-03-31(Dias para cupon / Dias Año)(849 / 360)2.36[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(849/360)]246.210.010.03i
2027-09-30(Dias para cupon / Dias Año)(1029 / 360)2.86[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1029/360)]236.290.010.03i
2028-03-31(Dias para cupon / Dias Año)(1209 / 360)3.36[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1209/360)]226.780.010.04i
2028-09-30(Dias para cupon / Dias Año)(1389 / 360)3.86[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1389/360)]217.640.010.04i
2029-03-31(Dias para cupon / Dias Año)(1569 / 360)4.36[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1569/360)]208.880.010.04i
2029-09-30(Dias para cupon / Dias Año)(1749 / 360)4.86[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(1749/360)]+[(0.0248 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1749/360)]1413.440.070.34ki
2030-03-31(Dias para cupon / Dias Año)(1929 / 360)5.36[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(1929/360)]+[(0.0248 x (180/360)) x 337.7361 x 95.00% x 100.00]/[(1+8.57)^(1929/360)]1343.030.070.35ki
2030-09-30(Dias para cupon / Dias Año)(2109 / 360)5.86[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2109/360)]+[(0.0248 x (180/360)) x 337.7361 x 90.00% x 100.00]/[(1+8.57)^(2109/360)]1276.000.060.37ki
2031-03-31(Dias para cupon / Dias Año)(2289 / 360)6.36[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2289/360)]+[(0.0248 x (180/360)) x 337.7361 x 85.00% x 100.00]/[(1+8.57)^(2289/360)]1212.200.060.38ki
2031-09-30(Dias para cupon / Dias Año)(2469 / 360)6.86[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2469/360)]+[(0.0248 x (180/360)) x 337.7361 x 80.00% x 100.00]/[(1+8.57)^(2469/360)]1151.460.060.39ki
2032-03-31(Dias para cupon / Dias Año)(2649 / 360)7.36[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2649/360)]+[(0.0248 x (180/360)) x 337.7361 x 75.00% x 100.00]/[(1+8.57)^(2649/360)]1093.650.050.40ki
2032-09-30(Dias para cupon / Dias Año)(2829 / 360)7.86[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2829/360)]+[(0.0248 x (180/360)) x 337.7361 x 70.00% x 100.00]/[(1+8.57)^(2829/360)]1038.620.050.40ki
2033-03-31(Dias para cupon / Dias Año)(3009 / 360)8.36[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3009/360)]+[(0.0248 x (180/360)) x 337.7361 x 65.00% x 100.00]/[(1+8.57)^(3009/360)]986.260.050.41ki
2033-09-30(Dias para cupon / Dias Año)(3189 / 360)8.86[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3189/360)]+[(0.0248 x (180/360)) x 337.7361 x 60.00% x 100.00]/[(1+8.57)^(3189/360)]936.430.050.41ki
2034-03-31(Dias para cupon / Dias Año)(3369 / 360)9.36[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3369/360)]+[(0.0248 x (180/360)) x 337.7361 x 55.00% x 100.00]/[(1+8.57)^(3369/360)]889.010.040.41ki
2034-09-30(Dias para cupon / Dias Año)(3549 / 360)9.86[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3549/360)]+[(0.0248 x (180/360)) x 337.7361 x 50.00% x 100.00]/[(1+8.57)^(3549/360)]843.890.040.41ki
2035-03-31(Dias para cupon / Dias Año)(3729 / 360)10.36[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3729/360)]+[(0.0248 x (180/360)) x 337.7361 x 45.00% x 100.00]/[(1+8.57)^(3729/360)]800.970.040.41ki
2035-09-30(Dias para cupon / Dias Año)(3909 / 360)10.86[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3909/360)]+[(0.0248 x (180/360)) x 337.7361 x 40.00% x 100.00]/[(1+8.57)^(3909/360)]760.130.040.41ki
2036-03-31(Dias para cupon / Dias Año)(4089 / 360)11.36[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4089/360)]+[(0.0248 x (180/360)) x 337.7361 x 35.00% x 100.00]/[(1+8.57)^(4089/360)]721.290.040.40ki
2036-09-30(Dias para cupon / Dias Año)(4269 / 360)11.86[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4269/360)]+[(0.0248 x (180/360)) x 337.7361 x 30.00% x 100.00]/[(1+8.57)^(4269/360)]684.340.030.40ki
2037-03-31(Dias para cupon / Dias Año)(4449 / 360)12.36[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4449/360)]+[(0.0248 x (180/360)) x 337.7361 x 25.00% x 100.00]/[(1+8.57)^(4449/360)]649.190.030.39ki
2037-09-30(Dias para cupon / Dias Año)(4629 / 360)12.86[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4629/360)]+[(0.0248 x (180/360)) x 337.7361 x 20.00% x 100.00]/[(1+8.57)^(4629/360)]615.770.030.39ki
2038-03-31(Dias para cupon / Dias Año)(4809 / 360)13.36[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4809/360)]+[(0.0248 x (180/360)) x 337.7361 x 15.00% x 100.00]/[(1+8.57)^(4809/360)]583.990.030.38ki
2038-09-30(Dias para cupon / Dias Año)(4989 / 360)13.86[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4989/360)]+[(0.0248 x (180/360)) x 337.7361 x 10.00% x 100.00]/[(1+8.57)^(4989/360)]553.760.030.38ki
2038-12-31(Dias para cupon / Dias Año)(5079 / 360)14.11[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(5079/360)]+[(0.0248 x (90/360)) x 337.7361 x 5.00% x 100.00]/[(1+8.57)^(5079/360)]532.650.030.37ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores8.048.04
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(8.04)/(1 + 8.57/100)7.40
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(20186.13 - 20443.88 )/( 2 x 20315 x 0.01)0.63
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](129 / 360) ^ 2 + (129 / 360)0.49[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(129/360)]290.22141.26i
2025-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](309 / 360) ^ 2 + (309 / 360)1.60[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(309/360)]278.53444.27i
2026-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](489 / 360) ^ 2 + (489 / 360)3.20[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(489/360)]267.31856.30i
2026-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](669 / 360) ^ 2 + (669 / 360)5.31[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(669/360)]256.541362.70i
2027-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](849 / 360) ^ 2 + (849 / 360)7.92[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(849/360)]246.211950.01i
2027-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1029 / 360) ^ 2 + (1029 / 360)11.03[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1029/360)]236.292605.95i
2028-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1209 / 360) ^ 2 + (1209 / 360)14.64[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1209/360)]226.783319.28i
2028-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1389 / 360) ^ 2 + (1389 / 360)18.75[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1389/360)]217.644079.74i
2029-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1569 / 360) ^ 2 + (1569 / 360)23.35[(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.0177 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1569/360)]208.884877.99i
2029-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1749 / 360) ^ 2 + (1749 / 360)28.46[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(1749/360)]+[(0.0248 x (180/360)) x 337.7361 x 100.00% x 100.00]/[(1+8.57)^(1749/360)]1413.4440228.99ki
2030-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1929 / 360) ^ 2 + (1929 / 360)34.07[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(1929/360)]+[(0.0248 x (180/360)) x 337.7361 x 95.00% x 100.00]/[(1+8.57)^(1929/360)]1343.0345757.24ki
2030-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2109 / 360) ^ 2 + (2109 / 360)40.18[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2109/360)]+[(0.0248 x (180/360)) x 337.7361 x 90.00% x 100.00]/[(1+8.57)^(2109/360)]1276.0051267.81ki
2031-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2289 / 360) ^ 2 + (2289 / 360)46.79[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2289/360)]+[(0.0248 x (180/360)) x 337.7361 x 85.00% x 100.00]/[(1+8.57)^(2289/360)]1212.2056714.68ki
2031-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2469 / 360) ^ 2 + (2469 / 360)53.90[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2469/360)]+[(0.0248 x (180/360)) x 337.7361 x 80.00% x 100.00]/[(1+8.57)^(2469/360)]1151.4662057.87ki
2032-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2649 / 360) ^ 2 + (2649 / 360)61.50[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2649/360)]+[(0.0248 x (180/360)) x 337.7361 x 75.00% x 100.00]/[(1+8.57)^(2649/360)]1093.6567262.90ki
2032-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2829 / 360) ^ 2 + (2829 / 360)69.61[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(2829/360)]+[(0.0248 x (180/360)) x 337.7361 x 70.00% x 100.00]/[(1+8.57)^(2829/360)]1038.6272300.28ki
2033-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3009 / 360) ^ 2 + (3009 / 360)78.22[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3009/360)]+[(0.0248 x (180/360)) x 337.7361 x 65.00% x 100.00]/[(1+8.57)^(3009/360)]986.2677145.10ki
2033-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3189 / 360) ^ 2 + (3189 / 360)87.33[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3189/360)]+[(0.0248 x (180/360)) x 337.7361 x 60.00% x 100.00]/[(1+8.57)^(3189/360)]936.4381776.55ki
2034-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3369 / 360) ^ 2 + (3369 / 360)96.94[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3369/360)]+[(0.0248 x (180/360)) x 337.7361 x 55.00% x 100.00]/[(1+8.57)^(3369/360)]889.0186177.56ki
2034-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3549 / 360) ^ 2 + (3549 / 360)107.05[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3549/360)]+[(0.0248 x (180/360)) x 337.7361 x 50.00% x 100.00]/[(1+8.57)^(3549/360)]843.8990334.42ki
2035-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3729 / 360) ^ 2 + (3729 / 360)117.65[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3729/360)]+[(0.0248 x (180/360)) x 337.7361 x 45.00% x 100.00]/[(1+8.57)^(3729/360)]800.9794236.47ki
2035-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](3909 / 360) ^ 2 + (3909 / 360)128.76[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(3909/360)]+[(0.0248 x (180/360)) x 337.7361 x 40.00% x 100.00]/[(1+8.57)^(3909/360)]760.1397875.78ki
2036-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4089 / 360) ^ 2 + (4089 / 360)140.37[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4089/360)]+[(0.0248 x (180/360)) x 337.7361 x 35.00% x 100.00]/[(1+8.57)^(4089/360)]721.29101246.85ki
2036-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4269 / 360) ^ 2 + (4269 / 360)152.48[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4269/360)]+[(0.0248 x (180/360)) x 337.7361 x 30.00% x 100.00]/[(1+8.57)^(4269/360)]684.34104346.39ki
2037-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4449 / 360) ^ 2 + (4449 / 360)165.09[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4449/360)]+[(0.0248 x (180/360)) x 337.7361 x 25.00% x 100.00]/[(1+8.57)^(4449/360)]649.19107173.03ki
2037-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4629 / 360) ^ 2 + (4629 / 360)178.20[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4629/360)]+[(0.0248 x (180/360)) x 337.7361 x 20.00% x 100.00]/[(1+8.57)^(4629/360)]615.77109727.13ki
2038-03-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4809 / 360) ^ 2 + (4809 / 360)191.80[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4809/360)]+[(0.0248 x (180/360)) x 337.7361 x 15.00% x 100.00]/[(1+8.57)^(4809/360)]583.99112010.57ki
2038-09-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](4989 / 360) ^ 2 + (4989 / 360)205.91[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(4989/360)]+[(0.0248 x (180/360)) x 337.7361 x 10.00% x 100.00]/[(1+8.57)^(4989/360)]553.76114026.59ki
2038-12-31[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](5079 / 360) ^ 2 + (5079 / 360)213.15[CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][337.7361 x 0.05 x 100.00]/[(1+8.57)^(5079/360)]+[(0.0248 x (90/360)) x 337.7361 x 5.00% x 100.00]/[(1+8.57)^(5079/360)]532.65113536.46ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [20315 x ((1 + 8.5696874999999) ^ 2)]] x 1704840.16]71.20
CER
Desarrollo CER
FechaCER
2003-12-171.4552
2024-11-07491.4735
   
CER Final/ CER Inicial337.7361
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2003-12-31
F. de Vencimiento2038-12-31
AjusteCER
Dias previos para calculo ajuste o interes10
Capital En 20 cuotas. Las primeras 19 cuotas semestrales se pagaran el 31 de marzo y el 30 de setiembre de cada año, comenzando el 30.09.29 y se pagara la Ultima cuota el 31.12.38. El monto de capital en circulacion sera ajustado por inflacion utilizando el Coeficiente de Estabilizacion y Referencia (CER), correspondiente al 10mo dia inmediatamente anterior a la fecha de pago pertinente.
InteresDevengan por el periodo 31.12.03 al 31.03.09 (exclusive) el 0,63%; por el periodo 31.03.09 al 31.03.19 (exclusive) el 1,18%; por el periodo 31.03.19 al 31.03.29 (exclusive) el 1,77% y por el periodo 31.03.29 al 31.12.38 (exclusive) el 2,48%. Se calculan sobre la base de un año de 360 dias integrado por 12 meses de 30 dias cada uno. Los intereses devengados desde el 31.12.03 al 31.03.05, exclusive, se pagaran en efectivo en la Fecha de Liquidacion (prevista para el 01.04.05). En la primera fecha de pago de intereses siguiente a la Fecha de Liquidacion se pagaran los intereses devengados al 31.03.05, inclusive, hasta pero sin incluir esa fecha de pago.
FrecuenciaLas fechas de pago son el 31 de Marzo y el 30 de Septiembre de cada año y el 31 de diciembre de 2038.
ISINARARGE03E105
¿Ves algun dato que parece incorrecto?