Bono de la Republica Argentina en Dolares Estadounidenses Step Up. Vto. 07-2030
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2021-07-09100.0016700.0018.390.0018.39
2022-01-09100.0020145.0050.360.0050.36
2022-07-09100.0028125.0070.310.0070.31
2023-01-09100.0032605.0081.510.0081.51
2023-07-09100.0048690.00121.720.00121.72
2024-01-09100.00115299.00432.370.00432.37
2024-07-0996.00133374.72521.005557.286078.27
2025-01-0988.0099549.12407.259049.929457.17
2025-07-0980.0090499.20373.319049.929423.23
2026-01-0972.0081449.28339.379049.929389.29
2026-07-0964.0072399.36305.439049.929355.35
2027-01-0956.0063349.44271.509049.929321.42
2027-07-0948.0054299.52237.569049.929287.48
2028-01-0940.0045249.60475.129049.929525.04
2028-07-0932.0036199.68395.939049.929445.85
2029-01-0924.0027149.76316.759049.929366.67
2029-07-0916.0018099.84237.569049.929287.48
2030-01-098.009049.92158.379049.929208.29
2030-07-090.000.0079.199049.929129.11
Datos
SimboloAL30Valor Tecnico108809.45Semana TIR-8.93%
EmisorArgentinaArgentinaValor Residual96.00%Mes TIR-18.92%
TipoSoberanoParidad64.51%Semestre TIR-18.07%
PaísArgentinaTIR18.77%1ero Enero TIR-51.10%
MercadoBYMAMacaulay Dur.2.48Año TIR-54.30%
MonedaARSModified Dur.2.09Semana Precio-0.59%
Fecha/Hora2024-10-10 17:00:10Effective Dur.0.39Mes Precio1.43%
Volumen109430153Convexidad8.10Semestre Precio25.29%
Precio70190.00Int. Corrido210.411ero Enero Precio88.00%
Variación-1.39%Cupon9457.17Año Precio200.36%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
77209.0010.00%14.38-23.36%
76507.109.00%14.79-21.20%
75805.208.00%15.20-19.00%
75103.307.00%15.62-16.77%
74401.406.00%16.05-14.49%
73699.505.00%16.48-12.18%
72997.604.00%16.93-9.83%
72295.703.00%17.38-7.43%
71593.802.00%17.83-4.99%
70891.901.00%18.30-2.51%
70190.000.00%18.770.00%
69488.10-1.00%19.262.60%
68786.20-2.00%19.755.23%
68084.30-3.00%20.257.91%
67382.40-4.00%20.7710.64%
66680.50-5.00%21.2913.42%
65978.60-6.00%21.8216.26%
65276.70-7.00%22.3719.15%
64574.80-8.00%22.9222.12%
63872.90-9.00%23.4925.13%
63171.00-10.00%24.0728.22%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
20.469.00%67800.61-3.40%
20.278.00%68059.12-3.04%
20.087.00%68319.49-2.66%
19.906.00%68581.74-2.29%
19.715.00%68845.87-1.91%
19.524.00%69111.92-1.54%
19.333.00%69379.90-1.15%
19.152.00%69649.82-0.77%
18.961.00%69921.71-0.38%
18.770.00%70190.000.00%
18.58-1.00%70471.450.40%
18.39-2.00%70749.350.80%
18.21-3.00%71029.301.20%
18.02-4.00%71311.301.60%
17.83-5.00%71595.392.00%
17.64-6.00%71881.582.41%
17.46-7.00%72169.902.82%
17.27-8.00%72460.363.23%
17.08-9.00%72752.983.65%
Desarrollo TIR
Desarrollo TIR 18.77%
FechaFormulaOperacionFactorTipo
2025-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360)) x 96.00% x 100.00 x 1131.24]/[(1+18.77)^(87/360)]390.66i
2025-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(87/360)]8681.42k
2025-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360)) x 88.00% x 100.00 x 1131.24]/[(1+18.77)^(267/360)]328.60i
2025-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(267/360)]7965.94k
2026-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360)) x 80.00% x 100.00 x 1131.24]/[(1+18.77)^(447/360)]274.10i
2026-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(447/360)]7309.44k
2026-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360)) x 72.00% x 100.00 x 1131.24]/[(1+18.77)^(627/360)]226.36i
2026-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(627/360)]6707.03k
2027-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360)) x 64.00% x 100.00 x 1131.24]/[(1+18.77)^(807/360)]184.63i
2027-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(807/360)]6154.28k
2027-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360)) x 56.00% x 100.00 x 1131.24]/[(1+18.77)^(987/360)]148.24i
2027-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(987/360)]5647.08k
2028-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360)) x 48.00% x 100.00 x 1131.24]/[(1+18.77)^(1167/360)]272.04i
2028-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1167/360)]5181.68k
2028-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360)) x 40.00% x 100.00 x 1131.24]/[(1+18.77)^(1347/360)]208.02i
2028-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1347/360)]4754.63k
2029-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360)) x 32.00% x 100.00 x 1131.24]/[(1+18.77)^(1527/360)]152.70i
2029-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1527/360)]4362.78k
2029-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360)) x 24.00% x 100.00 x 1131.24]/[(1+18.77)^(1707/360)]105.08i
2029-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1707/360)]4003.23k
2030-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360)) x 16.00% x 100.00 x 1131.24]/[(1+18.77)^(1887/360)]64.28i
2030-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1887/360)]3673.30k
2030-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360)) x 8.00% x 100.00 x 1131.24]/[(1+18.77)^(2067/360)]29.49i
2030-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(2067/360)]3370.57k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2024-10-12(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP x (Dias Corridos / Dias entre Cupones)(0.0075 x (180/360)) x 1.00 x 0.96 x 100.00 x 1131.24 x (93/180)210.41
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-01-09(Dias para cupon / Dias Año)(87 / 360)0.24[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(87/360)]+[(0.0075 x (180/360)) x 96.00% x 100.00 x 1131.24]/[(1+18.77)^(87/360)]9072.010.130.03ki
2025-07-09(Dias para cupon / Dias Año)(267 / 360)0.74[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(267/360)]+[(0.0075 x (180/360)) x 88.00% x 100.00 x 1131.24]/[(1+18.77)^(267/360)]8294.330.120.09ki
2026-01-09(Dias para cupon / Dias Año)(447 / 360)1.24[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(447/360)]+[(0.0075 x (180/360)) x 80.00% x 100.00 x 1131.24]/[(1+18.77)^(447/360)]7583.220.110.13ki
2026-07-09(Dias para cupon / Dias Año)(627 / 360)1.74[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(627/360)]+[(0.0075 x (180/360)) x 72.00% x 100.00 x 1131.24]/[(1+18.77)^(627/360)]6932.990.100.17ki
2027-01-09(Dias para cupon / Dias Año)(807 / 360)2.24[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(807/360)]+[(0.0075 x (180/360)) x 64.00% x 100.00 x 1131.24]/[(1+18.77)^(807/360)]6338.430.090.20ki
2027-07-09(Dias para cupon / Dias Año)(987 / 360)2.74[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(987/360)]+[(0.0075 x (180/360)) x 56.00% x 100.00 x 1131.24]/[(1+18.77)^(987/360)]5794.780.080.23ki
2028-01-09(Dias para cupon / Dias Año)(1167 / 360)3.24[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1167/360)]+[(0.0175 x (180/360)) x 48.00% x 100.00 x 1131.24]/[(1+18.77)^(1167/360)]5453.120.080.25ki
2028-07-09(Dias para cupon / Dias Año)(1347 / 360)3.74[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1347/360)]+[(0.0175 x (180/360)) x 40.00% x 100.00 x 1131.24]/[(1+18.77)^(1347/360)]4962.020.070.26ki
2029-01-09(Dias para cupon / Dias Año)(1527 / 360)4.24[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1527/360)]+[(0.0175 x (180/360)) x 32.00% x 100.00 x 1131.24]/[(1+18.77)^(1527/360)]4514.840.060.27ki
2029-07-09(Dias para cupon / Dias Año)(1707 / 360)4.74[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1707/360)]+[(0.0175 x (180/360)) x 24.00% x 100.00 x 1131.24]/[(1+18.77)^(1707/360)]4107.660.060.28ki
2030-01-09(Dias para cupon / Dias Año)(1887 / 360)5.24[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1887/360)]+[(0.0175 x (180/360)) x 16.00% x 100.00 x 1131.24]/[(1+18.77)^(1887/360)]3736.930.050.28ki
2030-07-09(Dias para cupon / Dias Año)(2067 / 360)5.74[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(2067/360)]+[(0.0175 x (180/360)) x 8.00% x 100.00 x 1131.24]/[(1+18.77)^(2067/360)]3399.410.050.28ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores2.482.48
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(2.48)/(1 + 18.77/100)2.09
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(69915.83 - 70465.61 )/( 2 x 70190 x 0.01)0.39
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](87 / 360) ^ 2 + (87 / 360)0.30[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(87/360)]+[(0.0075 x (180/360)) x 96.00% x 100.00 x 1131.24]/[(1+18.77)^(87/360)]9072.012722.23ki
2025-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](267 / 360) ^ 2 + (267 / 360)1.29[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(267/360)]+[(0.0075 x (180/360)) x 88.00% x 100.00 x 1131.24]/[(1+18.77)^(267/360)]8294.3310714.09ki
2026-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](447 / 360) ^ 2 + (447 / 360)2.78[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(447/360)]+[(0.0075 x (180/360)) x 80.00% x 100.00 x 1131.24]/[(1+18.77)^(447/360)]7583.2221107.16ki
2026-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](627 / 360) ^ 2 + (627 / 360)4.78[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(627/360)]+[(0.0075 x (180/360)) x 72.00% x 100.00 x 1131.24]/[(1+18.77)^(627/360)]6932.9933105.50ki
2027-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](807 / 360) ^ 2 + (807 / 360)7.27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(807/360)]+[(0.0075 x (180/360)) x 64.00% x 100.00 x 1131.24]/[(1+18.77)^(807/360)]6338.4346059.68ki
2027-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](987 / 360) ^ 2 + (987 / 360)10.26[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(987/360)]+[(0.0075 x (180/360)) x 56.00% x 100.00 x 1131.24]/[(1+18.77)^(987/360)]5794.7859445.16ki
2028-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1167 / 360) ^ 2 + (1167 / 360)13.75[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1167/360)]+[(0.0175 x (180/360)) x 48.00% x 100.00 x 1131.24]/[(1+18.77)^(1167/360)]5453.1274980.77ki
2028-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1347 / 360) ^ 2 + (1347 / 360)17.74[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1347/360)]+[(0.0175 x (180/360)) x 40.00% x 100.00 x 1131.24]/[(1+18.77)^(1347/360)]4962.0288034.89ki
2029-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1527 / 360) ^ 2 + (1527 / 360)22.23[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1527/360)]+[(0.0175 x (180/360)) x 32.00% x 100.00 x 1131.24]/[(1+18.77)^(1527/360)]4514.84100380.15ki
2029-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1707 / 360) ^ 2 + (1707 / 360)27.23[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1707/360)]+[(0.0175 x (180/360)) x 24.00% x 100.00 x 1131.24]/[(1+18.77)^(1707/360)]4107.66111831.21ki
2030-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1887 / 360) ^ 2 + (1887 / 360)32.72[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(1887/360)]+[(0.0175 x (180/360)) x 16.00% x 100.00 x 1131.24]/[(1+18.77)^(1887/360)]3736.93122260.04ki
2030-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2067 / 360) ^ 2 + (2067 / 360)38.71[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.08 x 100.00 x 1131.24]/[(1+18.77)^(2067/360)]+[(0.0175 x (180/360)) x 8.00% x 100.00 x 1131.24]/[(1+18.77)^(2067/360)]3399.41131585.57ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [70190 x ((1 + 18.774) ^ 2)]] x 802226.47]8.10
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2020-09-04
F. de Vencimiento2030-07-09
Ajuste
Dias previos para calculo ajuste o interes
CapitalLa amortización se efectuará en TRECE (13) cuotas semestrales, siendo la primera cuota representativa del 4% del capital, y las restantes doce equivalentes al 8% cada una, pagaderas el 9 de enero y 9 de julio de cada año, con la primera cuota el 9 de julio de 2024 y la última cuota el 9 de julio de 2030.
InteresLos Títulos Step Up en USD 2030 devengarán intereses, sobre la base de un año de TRESCIENTOS SESENTA (360) días integrado por DOCE (12) meses de TREINTA (30) días cada uno, de acuerdo con las siguientes tasas anuales: i. Del 4 de septiembre de 2020 (inclusive) al 9 de julio de 2021 (exclusive): CERO COMA CIENTO VEINTICINCO POR CIENTO (0,125%). ii. Del 9 de julio de 2021 (inclusive) al 9 de julio de 2023 (exclusive): CERO COMA CINCUENTA POR CIENTO (0,50%). iii. Del 9 de julio de 2023 (inclusive) al 9 de julio de 2027 (exclusive): CERO COMA SETENTA Y CINCO POR CIENTO (0,75%). iv. Del 9 de julio de 2027 al vencimiento: UNO COMA SETENTA Y CINCO POR CIENTO (1,75%).
FrecuenciaLas fechas de pago de intereses para los Títulos Step Up en USD 2030 son el 9 de enero y el 9 de julio de cada año, comenzando el 9 de julio de 2021.
ISINARARGE3209S6
¿Ves algun dato que parece incorrecto?