Bono de la Republica Argentina en Dolares Estadounidenses Step Up. Vto. 07-2030
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2021-07-09100.0016700.0018.390.0018.39
2022-01-09100.0020145.0050.360.0050.36
2022-07-09100.0028125.0070.310.0070.31
2023-01-09100.0032605.0081.510.0081.51
2023-07-09100.0048690.00121.720.00121.72
2024-01-09100.00115299.00432.370.00432.37
2024-07-0996.00102939.84402.114289.164691.27
2025-01-0988.0094361.52386.028578.328964.34
2025-07-0980.0085783.20353.868578.328932.18
2026-01-0972.0077204.88321.698578.328900.01
2026-07-0964.0068626.56289.528578.328867.84
2027-01-0956.0060048.24257.358578.328835.67
2027-07-0948.0051469.92225.188578.328803.50
2028-01-0940.0042891.60450.368578.329028.68
2028-07-0932.0034313.28375.308578.328953.62
2029-01-0924.0025734.96300.248578.328878.56
2029-07-0916.0017156.64225.188578.328803.50
2030-01-098.008578.32150.128578.328728.44
2030-07-090.000.0075.068578.328653.38
Datos
SimboloAL30Valor Tecnico107517.18Semana TIR0.42%
EmisorArgentinaArgentinaValor Residual100.00%Mes TIR2.03%
TipoSoberanoParidad58.27%Semestre TIR-63.15%
PaísArgentinaTIR21.60%1ero Enero TIR-43.72%
MercadoBYMAMacaulay Dur.2.62Año TIR-60.90%
MonedaARSModified Dur.2.15Semana Precio3.79%
Fecha/Hora2024-05-17 17:00:21Effective Dur.0.46Mes Precio6.11%
Volumen109123744Convexidad8.47Semestre Precio177.83%
Precio62650.00Int. Corrido288.181ero Enero Precio67.81%
Variación-0.24%Cupon4691.27Año Precio508.25%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
68915.0010.00%17.34-19.71%
68288.509.00%17.74-17.89%
67662.008.00%18.14-16.03%
67035.507.00%18.54-14.15%
66409.006.00%18.96-12.23%
65782.505.00%19.38-10.28%
65156.004.00%19.81-8.30%
64529.503.00%20.25-6.27%
63903.002.00%20.69-4.22%
63276.501.00%21.14-2.12%
62650.000.00%21.600.00%
62023.50-1.00%22.072.18%
61397.00-2.00%22.554.39%
60770.50-3.00%23.036.64%
60144.00-4.00%23.538.94%
59517.50-5.00%24.0411.28%
58891.00-6.00%24.5513.67%
58264.50-7.00%25.0816.10%
57638.00-8.00%25.6118.58%
57011.50-9.00%26.1621.12%
56385.00-10.00%26.7223.70%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
23.549.00%60126.93-4.03%
23.338.00%60398.16-3.59%
23.117.00%60671.66-3.16%
22.906.00%60947.45-2.72%
22.685.00%61225.55-2.27%
22.464.00%61506.00-1.83%
22.253.00%61788.81-1.37%
22.032.00%62074.01-0.92%
21.821.00%62361.63-0.46%
21.600.00%62650.000.00%
21.38-1.00%62944.250.47%
21.17-2.00%63239.300.94%
20.95-3.00%63536.881.42%
20.74-4.00%63837.021.89%
20.52-5.00%64139.752.38%
20.30-6.00%64445.102.87%
20.09-7.00%64753.093.36%
19.87-8.00%65063.773.85%
19.66-9.00%65377.154.35%
Desarrollo TIR
Desarrollo TIR 21.60%
FechaFormulaOperacionFactorTipo
2024-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360) x 100.00% x 100.00 x 1072.29]/[(1+21.60)^(51/360)]391.12i
2024-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.04 x 100.00 x 1072.29]/[(1+21.60)^(51/360)]4171.96k
2025-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360) x 96.00% x 100.00 x 1072.29]/[(1+21.60)^(231/360)]340.50i
2025-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(231/360)]7566.64k
2025-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360) x 88.00% x 100.00 x 1072.29]/[(1+21.60)^(411/360)]283.05i
2025-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(411/360)]6861.77k
2026-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360) x 80.00% x 100.00 x 1072.29]/[(1+21.60)^(591/360)]233.35i
2026-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(591/360)]6222.57k
2026-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360) x 72.00% x 100.00 x 1072.29]/[(1+21.60)^(771/360)]190.45i
2026-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(771/360)]5642.91k
2027-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360) x 64.00% x 100.00 x 1072.29]/[(1+21.60)^(951/360)]153.52i
2027-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(951/360)]5117.24k
2027-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0075 x (180/360) x 56.00% x 100.00 x 1072.29]/[(1+21.60)^(1131/360)]121.81i
2027-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1131/360)]4640.55k
2028-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360) x 48.00% x 100.00 x 1072.29]/[(1+21.60)^(1311/360)]220.93i
2028-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1311/360)]4208.26k
2028-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360) x 40.00% x 100.00 x 1072.29]/[(1+21.60)^(1491/360)]166.96i
2028-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1491/360)]3816.24k
2029-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360) x 32.00% x 100.00 x 1072.29]/[(1+21.60)^(1671/360)]121.13i
2029-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1671/360)]3460.74k
2029-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360) x 24.00% x 100.00 x 1072.29]/[(1+21.60)^(1851/360)]82.38i
2029-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1851/360)]3138.36k
2030-01-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360) x 16.00% x 100.00 x 1072.29]/[(1+21.60)^(2031/360)]49.81i
2030-01-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(2031/360)]2846.00k
2030-07-09[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0175 x (180/360) x 8.00% x 100.00 x 1072.29]/[(1+21.60)^(2211/360)]22.58i
2030-07-09[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(2211/360)]2580.88k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2024-05-18(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP x (Dias Corridos / Dias entre Cupones)(0.0075 x (180/360)) x 1.00 x 1 x 100.00 x 1072.29 x (129/180)288.18
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2024-07-09(Dias para cupon / Dias Año)(51 / 360)0.14[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.04 x 100.00 x 1072.29]/[(1+21.60)^(51/360)]+[(0.0075 x (180/360) x 100.00% x 100.00 x 1072.29]/[(1+21.60)^(51/360)]4563.070.070.01ki
2025-01-09(Dias para cupon / Dias Año)(231 / 360)0.64[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(231/360)]+[(0.0075 x (180/360) x 96.00% x 100.00 x 1072.29]/[(1+21.60)^(231/360)]7907.060.130.08ki
2025-07-09(Dias para cupon / Dias Año)(411 / 360)1.14[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(411/360)]+[(0.0075 x (180/360) x 88.00% x 100.00 x 1072.29]/[(1+21.60)^(411/360)]7144.690.110.13ki
2026-01-09(Dias para cupon / Dias Año)(591 / 360)1.64[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(591/360)]+[(0.0075 x (180/360) x 80.00% x 100.00 x 1072.29]/[(1+21.60)^(591/360)]6455.740.100.17ki
2026-07-09(Dias para cupon / Dias Año)(771 / 360)2.14[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(771/360)]+[(0.0075 x (180/360) x 72.00% x 100.00 x 1072.29]/[(1+21.60)^(771/360)]5833.150.090.20ki
2027-01-09(Dias para cupon / Dias Año)(951 / 360)2.64[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(951/360)]+[(0.0075 x (180/360) x 64.00% x 100.00 x 1072.29]/[(1+21.60)^(951/360)]5270.530.080.22ki
2027-07-09(Dias para cupon / Dias Año)(1131 / 360)3.14[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1131/360)]+[(0.0075 x (180/360) x 56.00% x 100.00 x 1072.29]/[(1+21.60)^(1131/360)]4762.120.080.24ki
2028-01-09(Dias para cupon / Dias Año)(1311 / 360)3.64[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1311/360)]+[(0.0175 x (180/360) x 48.00% x 100.00 x 1072.29]/[(1+21.60)^(1311/360)]4428.930.070.26ki
2028-07-09(Dias para cupon / Dias Año)(1491 / 360)4.14[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1491/360)]+[(0.0175 x (180/360) x 40.00% x 100.00 x 1072.29]/[(1+21.60)^(1491/360)]3982.930.060.26ki
2029-01-09(Dias para cupon / Dias Año)(1671 / 360)4.64[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1671/360)]+[(0.0175 x (180/360) x 32.00% x 100.00 x 1072.29]/[(1+21.60)^(1671/360)]3581.590.060.27ki
2029-07-09(Dias para cupon / Dias Año)(1851 / 360)5.14[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1851/360)]+[(0.0175 x (180/360) x 24.00% x 100.00 x 1072.29]/[(1+21.60)^(1851/360)]3220.460.050.26ki
2030-01-09(Dias para cupon / Dias Año)(2031 / 360)5.64[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(2031/360)]+[(0.0175 x (180/360) x 16.00% x 100.00 x 1072.29]/[(1+21.60)^(2031/360)]2895.540.050.26ki
2030-07-09(Dias para cupon / Dias Año)(2211 / 360)6.14[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(2211/360)]+[(0.0175 x (180/360) x 8.00% x 100.00 x 1072.29]/[(1+21.60)^(2211/360)]2603.200.040.26ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores2.622.62
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(2.62)/(1 + 21.60/100)2.15
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(62358.93 - 62941.56 )/( 2 x 62650.00 x 0.01)0.46
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2024-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](51 / 360) ^ 2 + (51 / 360)0.16[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.04 x 100.00 x 1072.29]/[(1+21.60)^(51/360)]+[(0.0075 x (180/360) x 100.00% x 100.00 x 1072.29]/[(1+21.60)^(51/360)]4563.07738.01ki
2025-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](231 / 360) ^ 2 + (231 / 360)1.05[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(231/360)]+[(0.0075 x (180/360) x 96.00% x 100.00 x 1072.29]/[(1+21.60)^(231/360)]7907.068329.32ki
2025-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](411 / 360) ^ 2 + (411 / 360)2.45[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(411/360)]+[(0.0075 x (180/360) x 88.00% x 100.00 x 1072.29]/[(1+21.60)^(411/360)]7144.6917469.26ki
2026-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](591 / 360) ^ 2 + (591 / 360)4.34[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(591/360)]+[(0.0075 x (180/360) x 80.00% x 100.00 x 1072.29]/[(1+21.60)^(591/360)]6455.7427996.84ki
2026-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](771 / 360) ^ 2 + (771 / 360)6.73[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(771/360)]+[(0.0075 x (180/360) x 72.00% x 100.00 x 1072.29]/[(1+21.60)^(771/360)]5833.1539247.78ki
2027-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](951 / 360) ^ 2 + (951 / 360)9.62[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(951/360)]+[(0.0075 x (180/360) x 64.00% x 100.00 x 1072.29]/[(1+21.60)^(951/360)]5270.5350702.88ki
2027-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1131 / 360) ^ 2 + (1131 / 360)13.01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1131/360)]+[(0.0075 x (180/360) x 56.00% x 100.00 x 1072.29]/[(1+21.60)^(1131/360)]4762.1261963.40ki
2028-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1311 / 360) ^ 2 + (1311 / 360)16.90[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1311/360)]+[(0.0175 x (180/360) x 48.00% x 100.00 x 1072.29]/[(1+21.60)^(1311/360)]4428.9374863.94ki
2028-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1491 / 360) ^ 2 + (1491 / 360)21.30[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1491/360)]+[(0.0175 x (180/360) x 40.00% x 100.00 x 1072.29]/[(1+21.60)^(1491/360)]3982.9384816.75ki
2029-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1671 / 360) ^ 2 + (1671 / 360)26.19[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1671/360)]+[(0.0175 x (180/360) x 32.00% x 100.00 x 1072.29]/[(1+21.60)^(1671/360)]3581.5993790.20ki
2029-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1851 / 360) ^ 2 + (1851 / 360)31.58[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(1851/360)]+[(0.0175 x (180/360) x 24.00% x 100.00 x 1072.29]/[(1+21.60)^(1851/360)]3220.46101697.13ki
2030-01-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2031 / 360) ^ 2 + (2031 / 360)37.47[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(2031/360)]+[(0.0175 x (180/360) x 16.00% x 100.00 x 1072.29]/[(1+21.60)^(2031/360)]2895.54108496.05ki
2030-07-09[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2211 / 360) ^ 2 + (2211 / 360)43.86[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x 100.00 x 1072.29]/[(1+21.60)^(2211/360)]+[(0.0175 x (180/360) x 8.00% x 100.00 x 1072.29]/[(1+21.60)^(2211/360)]2603.20114181.05ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [62650.00 x ((1 + 21.602) ^ 2)]] x 784292.62]8.47
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2020-09-04
F. de Vencimiento2030-07-09
Ajuste
Dias previos para calculo ajuste o interes
CapitalLa amortización se efectuará en TRECE (13) cuotas semestrales, siendo la primera cuota representativa del 4% del capital, y las restantes doce equivalentes al 8% cada una, pagaderas el 9 de enero y 9 de julio de cada año, con la primera cuota el 9 de julio de 2024 y la última cuota el 9 de julio de 2030.
InteresLos Títulos Step Up en USD 2030 devengarán intereses, sobre la base de un año de TRESCIENTOS SESENTA (360) días integrado por DOCE (12) meses de TREINTA (30) días cada uno, de acuerdo con las siguientes tasas anuales: i. Del 4 de septiembre de 2020 (inclusive) al 9 de julio de 2021 (exclusive): CERO COMA CIENTO VEINTICINCO POR CIENTO (0,125%). ii. Del 9 de julio de 2021 (inclusive) al 9 de julio de 2023 (exclusive): CERO COMA CINCUENTA POR CIENTO (0,50%). iii. Del 9 de julio de 2023 (inclusive) al 9 de julio de 2027 (exclusive): CERO COMA SETENTA Y CINCO POR CIENTO (0,75%). iv. Del 9 de julio de 2027 al vencimiento: UNO COMA SETENTA Y CINCO POR CIENTO (1,75%).
FrecuenciaLas fechas de pago de intereses para los Títulos Step Up en USD 2030 son el 9 de enero y el 9 de julio de cada año, comenzando el 9 de julio de 2021.
ISINARARGE3209S6
¿Ves algun dato que parece incorrecto?