Mediterranea y Roca. Clase XL. Tasa fija 11.00% USD. Vto. 11-2031.
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2025-05-01100.00118120.006243.950.006243.95
2025-11-01100.00114581.006301.950.006301.95
2026-05-0198.50112862.286301.951718.718020.67
2026-11-0197.00111143.576207.431718.717926.14
2027-05-0194.50108279.046112.902864.528977.42
2027-11-0192.00105414.525955.352864.528819.87
2028-05-0184.5096820.945797.808593.5714391.37
2028-11-0177.0088227.375325.158593.5713918.73
2029-05-0166.0075623.464852.5112603.9117456.42
2029-11-0155.0063019.554159.2912603.9116763.20
2030-05-0144.0050415.643466.0812603.9116069.99
2030-11-0133.0037811.732772.8612603.9115376.77
2031-05-0122.0025207.822079.6512603.9114683.56
2031-11-010.000.001386.4325207.8226594.25
Expresar en moneda de pago MEP
Datos
SimboloMR40OValor Tecnico114896.10Semana TIR-24.19%
EmisorGeneración Mediterranea S.A. Generación Mediterranea S.A. y Central Termica Roca S.A.Valor Residual100.00%Mes TIR-48.78%
TipoCorporativoParidad118.37%Semestre TIRS/D
PaísArgentinaTIR6.52%1ero Enero TIRS/D
MercadoBYMAMacaulay Dur.3.92Año TIRS/D
MonedaARSModified Dur.3.68Semana Precio0.00%
Fecha/Hora2025-04-23 11:22:45Effective Dur.0.24Mes Precio0.00%
Volumen0Convexidad19.82Semestre PrecioS/D
Precio136000.00Int. Corrido315.101ero Enero PrecioS/D
Variación0.00%Cupon6301.95Año PrecioS/D
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
149600.0010.00%3.99-38.85%
148240.009.00%4.23-35.19%
146880.008.00%4.47-31.49%
145520.007.00%4.71-27.74%
144160.006.00%4.96-23.92%
142800.005.00%5.21-20.06%
141440.004.00%5.47-16.16%
140080.003.00%5.73-12.19%
138720.002.00%5.99-8.16%
137360.001.00%6.25-4.07%
136000.000.00%6.520.00%
134640.00-1.00%6.804.27%
133280.00-2.00%7.088.54%
131920.00-3.00%7.3612.87%
130560.00-4.00%7.6517.26%
129200.00-5.00%7.9421.73%
127840.00-6.00%8.2326.26%
126480.00-7.00%8.5330.86%
125120.00-8.00%8.8435.54%
123760.00-9.00%9.1540.30%
122400.00-10.00%9.4645.14%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
7.119.00%133129.29-2.11%
7.048.00%133445.72-1.88%
6.987.00%133763.25-1.64%
6.916.00%134081.90-1.41%
6.855.00%134401.67-1.18%
6.784.00%134722.55-0.94%
6.723.00%135044.57-0.70%
6.652.00%135367.71-0.46%
6.591.00%135691.99-0.23%
6.520.00%136000.000.00%
6.45-1.00%136343.980.25%
6.39-2.00%136671.700.49%
6.32-3.00%137000.570.74%
6.26-4.00%137330.610.98%
6.19-5.00%137661.811.22%
6.13-6.00%137994.181.47%
6.06-7.00%138327.731.71%
6.00-8.00%138662.461.96%
5.93-9.00%138998.382.20%
Desarrollo TIR
Desarrollo TIR 6.52%
FechaFormulaOperacionFactorTipo
2025-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 100.00% x 100.00 x 1145.81]/[(1+6.52)^(171/360)]6115.69i
2026-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 100.00% x 100.00 x 1145.81]/[(1+6.52)^(351/360)]5925.57i
2026-05-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1145.81]/[(1+6.52)^(351/360)]1616.06k
2026-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 98.50% x 100.00 x 1145.81]/[(1+6.52)^(531/360)]5655.23i
2026-11-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1145.81]/[(1+6.52)^(531/360)]1565.82k
2027-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 97.00% x 100.00 x 1145.81]/[(1+6.52)^(711/360)]5395.98i
2027-05-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1145.81]/[(1+6.52)^(711/360)]2528.58k
2027-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 94.50% x 100.00 x 1145.81]/[(1+6.52)^(891/360)]5093.48i
2027-11-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1145.81]/[(1+6.52)^(891/360)]2449.97k
2028-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 92.00% x 100.00 x 1145.81]/[(1+6.52)^(1071/360)]4804.58i
2028-05-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1145.81]/[(1+6.52)^(1071/360)]7121.41k
2028-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 84.50% x 100.00 x 1145.81]/[(1+6.52)^(1251/360)]4275.71i
2028-11-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1145.81]/[(1+6.52)^(1251/360)]6900.02k
2029-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 77.00% x 100.00 x 1145.81]/[(1+6.52)^(1431/360)]3775.09i
2029-05-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1431/360)]9805.43k
2029-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 66.00% x 100.00 x 1145.81]/[(1+6.52)^(1611/360)]3135.20i
2029-11-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1611/360)]9500.60k
2030-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 55.00% x 100.00 x 1145.81]/[(1+6.52)^(1791/360)]2531.44i
2030-05-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1791/360)]9205.24k
2030-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 44.00% x 100.00 x 1145.81]/[(1+6.52)^(1971/360)]1962.20i
2030-11-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1971/360)]8919.07k
2031-05-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 33.00% x 100.00 x 1145.81]/[(1+6.52)^(2151/360)]1425.90i
2031-05-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(2151/360)]8641.80k
2031-11-01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 22.00% x 100.00 x 1145.81]/[(1+6.52)^(2331/360)]921.05i
2031-11-01[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.22 x 100.00 x 1145.81]/[(1+6.52)^(2331/360)]16746.29k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-10(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP x (Dias Corridos / Dias entre Cupones)(0.11 x (180/360)) x 1.00 x 1 x 100.00 x 1145.81 x (9/180)315.10
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-11-01(Dias para cupon / Dias Año)(171 / 360)0.47[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 100.00% x 100.00 x 1145.81]/[(1+6.52)^(171/360)]6115.580.040.02i
2026-05-01(Dias para cupon / Dias Año)(351 / 360)0.97[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1145.81]/[(1+6.52)^(351/360)]+[(0.11 x (180/360)) x 100.00% x 100.00 x 1145.81]/[(1+6.52)^(351/360)]7541.350.060.05ki
2026-11-01(Dias para cupon / Dias Año)(531 / 360)1.48[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1145.81]/[(1+6.52)^(531/360)]+[(0.11 x (180/360)) x 98.50% x 100.00 x 1145.81]/[(1+6.52)^(531/360)]7220.660.050.08ki
2027-05-01(Dias para cupon / Dias Año)(711 / 360)1.98[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1145.81]/[(1+6.52)^(711/360)]+[(0.11 x (180/360)) x 97.00% x 100.00 x 1145.81]/[(1+6.52)^(711/360)]7923.970.060.12ki
2027-11-01(Dias para cupon / Dias Año)(891 / 360)2.48[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1145.81]/[(1+6.52)^(891/360)]+[(0.11 x (180/360)) x 94.50% x 100.00 x 1145.81]/[(1+6.52)^(891/360)]7542.750.060.14ki
2028-05-01(Dias para cupon / Dias Año)(1071 / 360)2.98[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1145.81]/[(1+6.52)^(1071/360)]+[(0.11 x (180/360)) x 92.00% x 100.00 x 1145.81]/[(1+6.52)^(1071/360)]11924.660.090.26ki
2028-11-01(Dias para cupon / Dias Año)(1251 / 360)3.48[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1145.81]/[(1+6.52)^(1251/360)]+[(0.11 x (180/360)) x 84.50% x 100.00 x 1145.81]/[(1+6.52)^(1251/360)]11174.280.080.29ki
2029-05-01(Dias para cupon / Dias Año)(1431 / 360)3.98[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1431/360)]+[(0.11 x (180/360)) x 77.00% x 100.00 x 1145.81]/[(1+6.52)^(1431/360)]13578.490.100.40ki
2029-11-01(Dias para cupon / Dias Año)(1611 / 360)4.47[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1611/360)]+[(0.11 x (180/360)) x 66.00% x 100.00 x 1145.81]/[(1+6.52)^(1611/360)]12633.670.090.42ki
2030-05-01(Dias para cupon / Dias Año)(1791 / 360)4.97[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1791/360)]+[(0.11 x (180/360)) x 55.00% x 100.00 x 1145.81]/[(1+6.52)^(1791/360)]11734.490.090.43ki
2030-11-01(Dias para cupon / Dias Año)(1971 / 360)5.47[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1971/360)]+[(0.11 x (180/360)) x 44.00% x 100.00 x 1145.81]/[(1+6.52)^(1971/360)]10879.030.080.44ki
2031-05-01(Dias para cupon / Dias Año)(2151 / 360)5.97[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(2151/360)]+[(0.11 x (180/360)) x 33.00% x 100.00 x 1145.81]/[(1+6.52)^(2151/360)]10065.440.070.44ki
2031-11-01(Dias para cupon / Dias Año)(2331 / 360)6.47[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.22 x 100.00 x 1145.81]/[(1+6.52)^(2331/360)]+[(0.11 x (180/360)) x 22.00% x 100.00 x 1145.81]/[(1+6.52)^(2331/360)]17663.040.130.84ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores3.923.92
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(3.92)/(1 + 6.52/100)3.68
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(135671.86 - 136324.11 )/( 2 x 136000.00 x 0.01)0.24
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](171 / 360) ^ 2 + (171 / 360)0.70[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.11 x (180/360)) x 100.00% x 100.00 x 1145.81]/[(1+6.52)^(171/360)]6115.584284.73i
2026-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](351 / 360) ^ 2 + (351 / 360)1.93[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1145.81]/[(1+6.52)^(351/360)]+[(0.11 x (180/360)) x 100.00% x 100.00 x 1145.81]/[(1+6.52)^(351/360)]7541.3514521.82ki
2026-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](531 / 360) ^ 2 + (531 / 360)3.65[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.015 x 100.00 x 1145.81]/[(1+6.52)^(531/360)]+[(0.11 x (180/360)) x 98.50% x 100.00 x 1145.81]/[(1+6.52)^(531/360)]7220.6626359.91ki
2027-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](711 / 360) ^ 2 + (711 / 360)5.88[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1145.81]/[(1+6.52)^(711/360)]+[(0.11 x (180/360)) x 97.00% x 100.00 x 1145.81]/[(1+6.52)^(711/360)]7923.9746558.28ki
2027-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](891 / 360) ^ 2 + (891 / 360)8.60[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.025 x 100.00 x 1145.81]/[(1+6.52)^(891/360)]+[(0.11 x (180/360)) x 94.50% x 100.00 x 1145.81]/[(1+6.52)^(891/360)]7542.7564872.38ki
2028-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1071 / 360) ^ 2 + (1071 / 360)11.83[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1145.81]/[(1+6.52)^(1071/360)]+[(0.11 x (180/360)) x 92.00% x 100.00 x 1145.81]/[(1+6.52)^(1071/360)]11924.66141016.57ki
2028-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1251 / 360) ^ 2 + (1251 / 360)15.55[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.075 x 100.00 x 1145.81]/[(1+6.52)^(1251/360)]+[(0.11 x (180/360)) x 84.50% x 100.00 x 1145.81]/[(1+6.52)^(1251/360)]11174.28173767.05ki
2029-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1431 / 360) ^ 2 + (1431 / 360)19.78[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1431/360)]+[(0.11 x (180/360)) x 77.00% x 100.00 x 1145.81]/[(1+6.52)^(1431/360)]13578.49268523.07ki
2029-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1611 / 360) ^ 2 + (1611 / 360)24.50[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1611/360)]+[(0.11 x (180/360)) x 66.00% x 100.00 x 1145.81]/[(1+6.52)^(1611/360)]12633.67309532.81ki
2030-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1791 / 360) ^ 2 + (1791 / 360)29.73[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1791/360)]+[(0.11 x (180/360)) x 55.00% x 100.00 x 1145.81]/[(1+6.52)^(1791/360)]11734.49348815.14ki
2030-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1971 / 360) ^ 2 + (1971 / 360)35.45[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(1971/360)]+[(0.11 x (180/360)) x 44.00% x 100.00 x 1145.81]/[(1+6.52)^(1971/360)]10879.03385668.48ki
2031-05-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2151 / 360) ^ 2 + (2151 / 360)41.68[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.11 x 100.00 x 1145.81]/[(1+6.52)^(2151/360)]+[(0.11 x (180/360)) x 33.00% x 100.00 x 1145.81]/[(1+6.52)^(2151/360)]10065.44419483.35ki
2031-11-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2331 / 360) ^ 2 + (2331 / 360)48.40[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.22 x 100.00 x 1145.81]/[(1+6.52)^(2331/360)]+[(0.11 x (180/360)) x 22.00% x 100.00 x 1145.81]/[(1+6.52)^(2331/360)]17663.04854902.09ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [136000.00 x ((1 + 6.524) ^ 2)]] x 3058305.68]19.82
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2024-11-08
F. de Vencimiento2031-11-01
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl capital de las Obligaciones Negociables Clase XL será amortizado en 12 cuotas consecutivas en cada fecha de amortización especificada en la tabla a continuación y finalizando en la Fecha de Vencimiento de la Clase XL (cada una, una ?Fecha de Amortización de la Clase XL?).1 de mayo de 20261,5%1 de mayo de 202911,0%1 de noviembre de 20261,5%1 de noviembre de 202911,0%1 de mayo de 20272,5%1 de mayo de 203011,0%1 de noviembre de 20272,5%1 de noviembre de 203011,0%1 de mayo de 20287,5%1 de mayo de 203111,0%1 de noviembre de 20287,5%Fecha de Vencimiento de la Clase XL(2)22,0%
InteresTNA 11%
FrecuenciaLos intereses serán pagados semestralmente, en forma vencida, en las siguientes fechas: 1 de mayo de 2025, 1 de noviembre de 2025, 1 de mayo de 2026, 1 de noviembre de 2026, 1 de mayo de 2027, 1 de noviembre de 2027, 1 de mayo de 2028, 1 de noviembre de 2028, 1 de mayo de 2029, 1 de noviembre de 2029, 1 de mayo de 2030, 1 de noviembre de 2030, 1 de mayo de 2031, y en la Fecha de Vencimiento de la Clase XL, es decir, el 1 de noviembre de 2031 (cada una de ellas, una ?Fecha de Pago de Intereses de la Clase XL?).
ISINAR0127461561
¿Ves algun dato que parece incorrecto?