Activos agregados recientemente:    CP36D   CP36O   DHS9O   GYC4D   GYC4O   MR41O   MTC1D   MTC1O   PBY26   PN37D   PN37O   PQCRD   PQCRO   RCCPO   T30J6   TTC8D   TTC8O   YM34D   YM34O
360 Energy Solar. Clase IV. Tasa fija 8.00%. USD. Vto. 10-2027.
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2025-04-30100.00116232.004636.540.004636.54
2025-07-30100.00116232.002318.270.002318.27
2025-10-30100.00116232.002343.750.002343.75
2026-01-30100.00116232.002343.750.002343.75
2026-04-30100.00116232.002292.800.002292.80
2026-07-30100.00116232.002318.270.002318.27
2026-10-30100.00116232.002343.750.002343.75
2027-01-30100.00116232.002343.750.002343.75
2027-04-30100.00116232.002292.800.002292.80
2027-07-30100.00116232.002318.270.002318.27
2027-10-300.000.002343.75116232.00118575.75
Expresar en moneda de pago MEP
Datos
SimboloGYC4OValor Tecnico118575.75Semana TIR-13.95%
Emisor360 Energy Solar S.A.360 Energy Solar S.A.Valor Residual100.00%Mes TIR-19.61%
TipoCorporativoParidad102.04%Semestre TIRS/D
PaísArgentinaTIR7.34%1ero Enero TIR-19.70%
MercadoBYMAMacaulay Dur.2.45Año TIRS/D
MonedaARSModified Dur.2.29Semana Precio2.54%
Fecha/Hora2025-01-30 13:17:57Effective Dur.0.17Mes Precio4.31%
Volumen85Convexidad7.77Semestre PrecioS/D
Precio121000.00Int. Corrido2343.751ero Enero Precio4.31%
Variación0.01%Cupon4636.54Año PrecioS/D
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
133100.0010.00%3.26-55.65%
131890.009.00%3.65-50.47%
130680.008.00%4.03-45.20%
129470.007.00%4.43-39.86%
128260.006.00%4.83-34.44%
127050.005.00%5.23-28.95%
125840.004.00%5.64-23.40%
124630.003.00%6.05-17.75%
123420.002.00%6.48-12.01%
122210.001.00%6.90-6.20%
121000.000.00%7.340.00%
119790.00-1.00%7.785.67%
118580.00-2.00%8.2311.76%
117370.00-3.00%8.6817.93%
116160.00-4.00%9.1424.19%
114950.00-5.00%9.6130.56%
113740.00-6.00%10.0837.02%
112530.00-7.00%10.5743.59%
111320.00-8.00%11.0650.26%
110110.00-9.00%11.5657.05%
108900.00-10.00%12.0763.94%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
8.029.00%119125.31-1.55%
7.958.00%119324.52-1.38%
7.887.00%119524.22-1.22%
7.806.00%119724.43-1.05%
7.735.00%119925.13-0.89%
7.654.00%120126.33-0.72%
7.583.00%120328.04-0.56%
7.512.00%120530.24-0.39%
7.431.00%120732.96-0.22%
7.360.00%121000.000.00%
7.29-1.00%121139.910.12%
7.21-2.00%121344.150.28%
7.14-3.00%121548.900.45%
7.07-4.00%121754.160.62%
6.99-5.00%121959.940.79%
6.92-6.00%122166.240.96%
6.84-7.00%122373.051.13%
6.77-8.00%122580.391.31%
6.70-9.00%122788.241.48%
Desarrollo TIR
Desarrollo TIR 7.34%
FechaFormulaOperacionFactorTipo
2025-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (182/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(90/365)]4556.27i
2025-07-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (91/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(181/365)]2238.26i
2025-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(273/365)]2222.81i
2026-01-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(365/365)]2183.48i
2026-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (90/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(455/365)]2099.03i
2026-07-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (91/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(546/365)]2085.20i
2026-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(638/365)]2070.81i
2027-01-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(730/365)]2034.17i
2027-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (90/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(820/365)]1955.50i
2027-07-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (91/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(911/365)]1942.61i
2027-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(1003/365)]1929.21i
2027-10-30[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00 x 1162.32]/[(1+7.34)^(1003/365)]95674.13k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-01-30(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP x (Dias Corridos / Dias entre Cupones)(0.08 x (182/365)) x 1.00 x 1 x 100.00 x 1162.32 x (92/182)2343.75
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-04-30(Dias para cupon / Dias Año)(90 / 365)0.25[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (182/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(90/365)]4556.290.040.01i
2025-07-30(Dias para cupon / Dias Año)(181 / 365)0.50[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (91/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(181/365)]2238.280.020.01i
2025-10-30(Dias para cupon / Dias Año)(273 / 365)0.75[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(273/365)]2222.850.020.01i
2026-01-30(Dias para cupon / Dias Año)(365 / 365)1.00[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(365/365)]2183.530.020.02i
2026-04-30(Dias para cupon / Dias Año)(455 / 365)1.25[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (90/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(455/365)]2099.090.020.02i
2026-07-30(Dias para cupon / Dias Año)(546 / 365)1.50[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (91/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(546/365)]2085.270.020.03i
2026-10-30(Dias para cupon / Dias Año)(638 / 365)1.75[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(638/365)]2070.890.020.03i
2027-01-30(Dias para cupon / Dias Año)(730 / 365)2.00[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(730/365)]2034.260.020.03i
2027-04-30(Dias para cupon / Dias Año)(820 / 365)2.25[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (90/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(820/365)]1955.590.020.04i
2027-07-30(Dias para cupon / Dias Año)(911 / 365)2.50[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (91/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(911/365)]1942.720.020.04i
2027-10-30(Dias para cupon / Dias Año)(1003 / 365)2.75[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00 x 1162.32]/[(1+7.34)^(1003/365)]+[(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(1003/365)]97609.120.812.22ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores2.452.45
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(2.45)/(1 + 7.34/100)2.29
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(120795.13 - 121201.15 )/( 2 x 121000 x 0.01)0.17
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](90 / 365) ^ 2 + (90 / 365)0.31[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (182/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(90/365)]4556.291400.49i
2025-07-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](181 / 365) ^ 2 + (181 / 365)0.74[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (91/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(181/365)]2238.281660.35i
2025-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](273 / 365) ^ 2 + (273 / 365)1.31[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(273/365)]2222.852906.08i
2026-01-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](365 / 365) ^ 2 + (365 / 365)2.00[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(365/365)]2183.534367.05i
2026-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](455 / 365) ^ 2 + (455 / 365)2.80[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (90/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(455/365)]2099.095878.55i
2026-07-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](546 / 365) ^ 2 + (546 / 365)3.73[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (91/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(546/365)]2085.277785.52i
2026-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](638 / 365) ^ 2 + (638 / 365)4.80[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(638/365)]2070.899947.03i
2027-01-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](730 / 365) ^ 2 + (730 / 365)6.00[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(730/365)]2034.2612205.55i
2027-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](820 / 365) ^ 2 + (820 / 365)7.29[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (90/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(820/365)]1955.5914263.45i
2027-07-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](911 / 365) ^ 2 + (911 / 365)8.73[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.08 x (91/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(911/365)]1942.7216950.92i
2027-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1003 / 365) ^ 2 + (1003 / 365)10.30[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00 x 1162.32]/[(1+7.34)^(1003/365)]+[(0.08 x (92/365)) x 100.00% x 100.00 x 1162.32]/[(1+7.34)^(1003/365)]97609.121005290.81ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [121000 x ((1 + 7.3376875000001) ^ 2)]] x 1082655.80]7.77
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2024-10-30
F. de Vencimiento2027-10-30
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl capital de las Obligaciones Negociables será cancelado en forma íntegra en la Fecha de Vencimiento
InteresTNA 8%
FrecuenciaLos intereses serán pagaderos trimestralmente, en forma vencida en las siguientes fechas: 30 de abril de 2025, 30 de julio de 2025, 30 de octubre de 2025, 30 de enero de 2026, 30 de abril de 2026, 30 de julio de 2026, 30 de octubre de 2026, 30 de enero de 2027, 30 de abril de 2027, 30 de julio de 2027 y en la Fecha de Vencimiento, es decir el 30 de octubre de 2027.
ISINAR0361594168
¿Ves algun dato que parece incorrecto?