Plaza Logistica. Clase XV. Tasa fija 7%. USD. Vto. 06-2028.
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2025-06-04100.00100.003.500.003.50
2025-09-04100.00100.001.750.001.75
2025-12-04100.00100.001.750.001.75
2026-03-04100.00100.001.750.001.75
2026-06-04100.00100.001.750.001.75
2026-09-04100.00100.001.750.001.75
2026-12-04100.00100.001.750.001.75
2027-03-04100.00100.001.750.001.75
2027-06-04100.00100.001.750.001.75
2027-09-04100.00100.001.750.001.75
2027-12-04100.00100.001.750.001.75
2028-03-04100.00100.001.750.001.75
2028-06-040.000.001.75100.00101.75
Datos
SimboloPZCGDValor Tecnico103.03Semana TIR12.10%
EmisorPlaza Logistica S.A.Plaza Logistica S.A.Valor Residual100.00%Mes TIR-3.95%
TipoCorporativoParidad93.85%Semestre TIRS/D
PaísArgentinaTIR9.73%1ero Enero TIR32.35%
MercadoBYMAMacaulay Dur.2.69Año TIRS/D
MonedaUSDModified Dur.2.45Semana Precio-2.32%
Fecha/Hora2025-05-09 16:47:36Effective Dur.0.24Mes Precio1.79%
Volumen1870Convexidad8.83Semestre PrecioS/D
Precio96.70Int. Corrido3.031ero Enero Precio-3.30%
Variación0.73%Cupon3.50Año PrecioS/D
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
106.3710.00%5.93-39.07%
105.409.00%6.29-35.39%
104.448.00%6.65-31.67%
103.477.00%7.02-27.90%
102.506.00%7.39-24.08%
101.535.00%7.76-20.21%
100.574.00%8.15-16.27%
99.603.00%8.53-12.29%
98.632.00%8.93-8.24%
97.671.00%9.33-4.14%
96.700.00%9.730.00%
95.73-1.00%10.144.24%
94.77-2.00%10.568.53%
93.80-3.00%10.9812.89%
92.83-4.00%11.4117.30%
91.87-5.00%11.8521.79%
90.90-6.00%12.2926.35%
89.93-7.00%12.7430.98%
88.96-8.00%13.2035.68%
88.00-9.00%13.6740.46%
87.03-10.00%14.1445.32%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
10.619.00%94.66-2.11%
10.518.00%94.88-1.88%
10.417.00%95.11-1.65%
10.316.00%95.33-1.41%
10.225.00%95.56-1.18%
10.124.00%95.79-0.94%
10.023.00%96.02-0.71%
9.922.00%96.24-0.47%
9.831.00%96.47-0.23%
9.730.00%96.700.00%
9.63-1.00%96.930.24%
9.54-2.00%97.170.48%
9.44-3.00%97.400.72%
9.34-4.00%97.630.96%
9.24-5.00%97.871.21%
9.15-6.00%98.101.45%
9.05-7.00%98.341.69%
8.95-8.00%98.581.94%
8.85-9.00%98.812.19%
Desarrollo TIR
Desarrollo TIR 9.73%
FechaFormulaOperacionFactorTipo
2025-06-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (180/360)) x 100.00% x 100.00]/[(1+9.73)^(24/360)]3.48i
2025-09-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(114/360)]1.70i
2025-12-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(204/360)]1.66i
2026-03-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(294/360)]1.62i
2026-06-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(384/360)]1.58i
2026-09-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(474/360)]1.55i
2026-12-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(564/360)]1.51i
2027-03-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(654/360)]1.48i
2027-06-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(744/360)]1.44i
2027-09-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(834/360)]1.41i
2027-12-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(924/360)]1.38i
2028-03-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(1014/360)]1.35i
2028-06-04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(1104/360)]1.32i
2028-06-04[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00]/[(1+9.73)^(1104/360)]75.22k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-10(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones)(0.07 x (180/360)) x 1.00 x 1 x 100.00 x (156/180)3.03
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-06-04(Dias para cupon / Dias Año)(24 / 360)0.07[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (180/360)) x 100.00% x 100.00]/[(1+9.73)^(24/360)]3.480.040.00i
2025-09-04(Dias para cupon / Dias Año)(114 / 360)0.32[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(114/360)]1.700.020.01i
2025-12-04(Dias para cupon / Dias Año)(204 / 360)0.57[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(204/360)]1.660.020.01i
2026-03-04(Dias para cupon / Dias Año)(294 / 360)0.82[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(294/360)]1.620.020.01i
2026-06-04(Dias para cupon / Dias Año)(384 / 360)1.07[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(384/360)]1.580.020.02i
2026-09-04(Dias para cupon / Dias Año)(474 / 360)1.32[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(474/360)]1.550.020.02i
2026-12-04(Dias para cupon / Dias Año)(564 / 360)1.57[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(564/360)]1.510.020.02i
2027-03-04(Dias para cupon / Dias Año)(654 / 360)1.82[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(654/360)]1.480.020.03i
2027-06-04(Dias para cupon / Dias Año)(744 / 360)2.07[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(744/360)]1.440.010.03i
2027-09-04(Dias para cupon / Dias Año)(834 / 360)2.32[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(834/360)]1.410.010.03i
2027-12-04(Dias para cupon / Dias Año)(924 / 360)2.57[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(924/360)]1.380.010.04i
2028-03-04(Dias para cupon / Dias Año)(1014 / 360)2.82[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(1014/360)]1.350.010.04i
2028-06-04(Dias para cupon / Dias Año)(1104 / 360)3.07[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00]/[(1+9.73)^(1104/360)]+[(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(1104/360)]76.530.792.43ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores2.692.69
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(2.69)/(1 + 9.73/100)2.45
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(96.47 - 96.93 )/( 2 x 96.7 x 0.01)0.24
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-06-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](24 / 360) ^ 2 + (24 / 360)0.07[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (180/360)) x 100.00% x 100.00]/[(1+9.73)^(24/360)]3.480.25i
2025-09-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](114 / 360) ^ 2 + (114 / 360)0.42[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(114/360)]1.700.71i
2025-12-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](204 / 360) ^ 2 + (204 / 360)0.89[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(204/360)]1.661.47i
2026-03-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](294 / 360) ^ 2 + (294 / 360)1.48[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(294/360)]1.622.41i
2026-06-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](384 / 360) ^ 2 + (384 / 360)2.20[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(384/360)]1.583.49i
2026-09-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](474 / 360) ^ 2 + (474 / 360)3.05[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(474/360)]1.554.72i
2026-12-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](564 / 360) ^ 2 + (564 / 360)4.02[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(564/360)]1.516.08i
2027-03-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](654 / 360) ^ 2 + (654 / 360)5.12[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(654/360)]1.487.56i
2027-06-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](744 / 360) ^ 2 + (744 / 360)6.34[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(744/360)]1.449.15i
2027-09-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](834 / 360) ^ 2 + (834 / 360)7.68[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(834/360)]1.4110.84i
2027-12-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](924 / 360) ^ 2 + (924 / 360)9.15[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(924/360)]1.3812.62i
2028-03-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1014 / 360) ^ 2 + (1014 / 360)10.75[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(1014/360)]1.3514.48i
2028-06-04[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1104 / 360) ^ 2 + (1104 / 360)12.47[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00]/[(1+9.73)^(1104/360)]+[(0.07 x (90/360)) x 100.00% x 100.00]/[(1+9.73)^(1104/360)]76.53954.44ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [96.7 x ((1 + 9.732) ^ 2)]] x 1028.25]8.83
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2024-12-04
F. de Vencimiento2028-06-04
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl capital de las Obligaciones Negociables será amortizado en un único pago en la Fecha de Vencimiento.
InteresTNA 7%
FrecuenciaLos intereses serán pagaderos trimestralmente, en forma vencida, a partir del sexto mes contado desde la Fecha de Emisión y Liquidación inclusive, es decir en las siguientes fechas (o día hábil siguiente): (i) 4 de junio 2025; (ii) 4 de septiembre de 2025, (iii) 4 diciembre de 2025, (iv) 4 de marzo de 2026; (v) 4 de junio 2026; (vi) 4 de septiembre de 2026, (vii) 4 diciembre de 2026, (viii) 4 de marzo de 2027; (ix) 4 de junio 2027; (x) 4 de septiembre de 2027, (xi) 4 diciembre de 2027, (xii) 4 de marzo de 2028; (xiii) 4 de junio 2028;
ISINAR0560145721
¿Ves algun dato que parece incorrecto?