Activos agregados recientemente:    GN47D   GN47O   IRCOD   IRCOO   LECGD   LECGO   MGCLO   MSSFD   MSSFO   OTS2D   OTS2O   PECGD   PECGO   PNXCD   PNXCO   S14F5   S15G5   STCED   STCEO   TC25P   TZXO5   TZXO6   TZXY5   YFCGD   YFCGO   YFCID   YFCIO
Pan American Energy. Clase XXXI. Tasa Fija 8.5% USD. Vto. 10-2032.
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2024-10-30100.00101.654.390.004.39
2025-04-30100.00102.894.420.004.42
2025-10-30100.00102.894.450.004.45
2026-04-30100.00102.894.420.004.42
2026-10-30100.00102.894.450.004.45
2027-04-30100.00102.894.420.004.42
2027-10-30100.00102.894.450.004.45
2028-04-30100.00102.894.450.004.45
2028-10-30100.00102.894.450.004.45
2029-04-30100.00102.894.420.004.42
2029-10-30100.00102.894.450.004.45
2030-04-3066.6768.594.4234.3038.72
2030-10-3066.6768.592.960.002.96
2031-04-3033.3334.302.9534.3037.24
2031-10-3033.3334.301.480.001.48
2032-04-300.000.001.4834.3035.78
Expresar en moneda de pago CCL
Datos
SimboloPNXCDValor Tecnico103.42Semana TIR0.20%
EmisorPan American Energy S.L.Pan American Energy S.L.Valor Residual100.00%Mes TIR-1.80%
TipoCorporativoParidad107.86%Semestre TIRS/D
PaísArgentinaTIR7.09%1ero Enero TIRS/D
MercadoBYMAMacaulay Dur.5.17Año TIRS/D
MonedaUSDModified Dur.4.83Semana Precio-0.58%
Fecha/HoraEffective Dur.0.34Mes Precio-2.15%
Volumen211000Convexidad31.71Semestre PrecioS/D
Precio111.55Int. Corrido0.531ero Enero PrecioS/D
Variación0.31%Cupon4.42Año PrecioS/D
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
122.7010.00%5.15-27.40%
121.599.00%5.33-24.83%
120.478.00%5.52-22.21%
119.367.00%5.70-19.56%
118.246.00%5.89-16.88%
117.135.00%6.09-14.17%
116.014.00%6.28-11.41%
114.903.00%6.48-8.62%
113.782.00%6.68-5.80%
112.671.00%6.88-2.93%
111.550.00%7.090.00%
110.43-1.00%7.302.91%
109.32-2.00%7.515.89%
108.20-3.00%7.728.91%
107.09-4.00%7.9411.98%
105.97-5.00%8.1615.09%
104.86-6.00%8.3818.25%
103.74-7.00%8.6121.44%
102.63-8.00%8.8424.69%
101.51-9.00%9.0727.99%
100.39-10.00%9.3131.34%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
7.739.00%108.17-3.03%
7.668.00%108.54-2.70%
7.597.00%108.90-2.37%
7.526.00%109.27-2.04%
7.445.00%109.65-1.71%
7.374.00%110.02-1.37%
7.303.00%110.40-1.03%
7.232.00%110.77-0.70%
7.161.00%111.15-0.36%
7.090.00%111.550.00%
7.02-1.00%111.920.33%
6.95-2.00%112.300.67%
6.88-3.00%112.691.02%
6.81-4.00%113.081.37%
6.74-5.00%113.471.72%
6.66-6.00%113.862.07%
6.59-7.00%114.252.42%
6.52-8.00%114.652.78%
6.45-9.00%115.043.13%
Desarrollo TIR
Desarrollo TIR 7.09%
FechaFormulaOperacionFactorTipo
2025-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(160/360)]4.29i
2025-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(343/360)]4.16i
2026-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(525/360)]4.00i
2026-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(708/360)]3.89i
2027-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(890/360)]3.73i
2027-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1073/360)]3.62i
2028-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1256/360)]3.50i
2028-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1439/360)]3.38i
2029-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1621/360)]3.25i
2029-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1804/360)]3.15i
2030-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1986/360)]3.03i
2030-04-30[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1.03]/[(1+7.09)^(1986/360)]23.50k
2030-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 66.67% x 100.00 x 1.03]/[(1+7.09)^(2169/360)]1.96i
2031-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 66.67% x 100.00 x 1.03]/[(1+7.09)^(2351/360)]1.88i
2031-04-30[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1.03]/[(1+7.09)^(2351/360)]21.93k
2031-10-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 33.33% x 100.00 x 1.03]/[(1+7.09)^(2534/360)]0.91i
2032-04-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 33.33% x 100.00 x 1.03]/[(1+7.09)^(2717/360)]0.88i
2032-04-30[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1.03]/[(1+7.09)^(2717/360)]20.45k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2024-11-21(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL x (Dias Corridos / Dias entre Cupones)(0.085 x (182/360)) x 1.00 x 1 x 100.00 x 1.03 x (22/182)0.53
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-04-30(Dias para cupon / Dias Año)(160 / 360)0.44[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(160/360)]4.290.040.02i
2025-10-30(Dias para cupon / Dias Año)(343 / 360)0.95[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(343/360)]4.160.040.04i
2026-04-30(Dias para cupon / Dias Año)(525 / 360)1.46[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(525/360)]4.000.040.05i
2026-10-30(Dias para cupon / Dias Año)(708 / 360)1.97[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(708/360)]3.890.030.07i
2027-04-30(Dias para cupon / Dias Año)(890 / 360)2.47[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(890/360)]3.730.030.08i
2027-10-30(Dias para cupon / Dias Año)(1073 / 360)2.98[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1073/360)]3.620.030.10i
2028-04-30(Dias para cupon / Dias Año)(1256 / 360)3.49[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1256/360)]3.500.030.11i
2028-10-30(Dias para cupon / Dias Año)(1439 / 360)4.00[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1439/360)]3.380.030.12i
2029-04-30(Dias para cupon / Dias Año)(1621 / 360)4.50[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1621/360)]3.250.030.13i
2029-10-30(Dias para cupon / Dias Año)(1804 / 360)5.01[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1804/360)]3.150.030.14i
2030-04-30(Dias para cupon / Dias Año)(1986 / 360)5.52[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1.03]/[(1+7.09)^(1986/360)]+[(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1986/360)]26.540.241.31ki
2030-10-30(Dias para cupon / Dias Año)(2169 / 360)6.03[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 66.67% x 100.00 x 1.03]/[(1+7.09)^(2169/360)]1.960.020.11i
2031-04-30(Dias para cupon / Dias Año)(2351 / 360)6.53[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1.03]/[(1+7.09)^(2351/360)]+[(0.085 x (182/360)) x 66.67% x 100.00 x 1.03]/[(1+7.09)^(2351/360)]23.810.211.39ki
2031-10-30(Dias para cupon / Dias Año)(2534 / 360)7.04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 33.33% x 100.00 x 1.03]/[(1+7.09)^(2534/360)]0.920.010.06i
2032-04-30(Dias para cupon / Dias Año)(2717 / 360)7.55[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1.03]/[(1+7.09)^(2717/360)]+[(0.085 x (183/360)) x 33.33% x 100.00 x 1.03]/[(1+7.09)^(2717/360)]21.340.191.44ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores5.175.17
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(5.17)/(1 + 7.09/100)4.83
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(111.17 - 111.93 )/( 2 x 111.55 x 0.01)0.34
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](160 / 360) ^ 2 + (160 / 360)0.64[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(160/360)]4.292.75i
2025-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](343 / 360) ^ 2 + (343 / 360)1.86[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(343/360)]4.167.75i
2026-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](525 / 360) ^ 2 + (525 / 360)3.59[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(525/360)]4.0014.34i
2026-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](708 / 360) ^ 2 + (708 / 360)5.83[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(708/360)]3.8922.67i
2027-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](890 / 360) ^ 2 + (890 / 360)8.58[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(890/360)]3.7332.04i
2027-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1073 / 360) ^ 2 + (1073 / 360)11.86[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1073/360)]3.6243.01i
2028-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1256 / 360) ^ 2 + (1256 / 360)15.66[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1256/360)]3.5054.83i
2028-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1439 / 360) ^ 2 + (1439 / 360)19.98[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1439/360)]3.3867.54i
2029-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1621 / 360) ^ 2 + (1621 / 360)24.78[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1621/360)]3.2580.48i
2029-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1804 / 360) ^ 2 + (1804 / 360)30.12[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1804/360)]3.1595.01i
2030-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1986 / 360) ^ 2 + (1986 / 360)35.95[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1.03]/[(1+7.09)^(1986/360)]+[(0.085 x (182/360)) x 100.00% x 100.00 x 1.03]/[(1+7.09)^(1986/360)]26.54953.97ki
2030-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2169 / 360) ^ 2 + (2169 / 360)42.33[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 66.67% x 100.00 x 1.03]/[(1+7.09)^(2169/360)]1.9683.03i
2031-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2351 / 360) ^ 2 + (2351 / 360)49.18[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1.03]/[(1+7.09)^(2351/360)]+[(0.085 x (182/360)) x 66.67% x 100.00 x 1.03]/[(1+7.09)^(2351/360)]23.811171.13ki
2031-10-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2534 / 360) ^ 2 + (2534 / 360)56.58[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (183/360)) x 33.33% x 100.00 x 1.03]/[(1+7.09)^(2534/360)]0.9251.78i
2032-04-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2717 / 360) ^ 2 + (2717 / 360)64.51[Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)][0.333333 x 100.00 x 1.03]/[(1+7.09)^(2717/360)]+[(0.085 x (183/360)) x 33.33% x 100.00 x 1.03]/[(1+7.09)^(2717/360)]21.341376.47ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [111.55 x ((1 + 7.0876875000001) ^ 2)]] x 4056.81]31.71
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2024-04-30
F. de Vencimiento2032-04-30
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl capital de las Obligaciones Negociables será amortizado en tres (3) cuotas anuales, según se detalla a continuación: (i) el 30 de abril de 2030, es decir en la fecha en que se cumplan 6 (seis) años contados desde la Fecha de Emisión y Liquidación, una suma equivalente a US$133.333.000, (ii) el 30 de abril de 2031, es decir en la fecha en que se cumplan 7 (siete) años contados desde la Fecha de Emisión y Liquidación, una suma equivalente a US$133.333.000, y (iii) en la Fecha de Vencimiento, una suma equivalente a US$133.334.000.
InteresTNA 8.5%
FrecuenciaSerán los días 30 de abril y 30 de octubre de cada año, comenzando el 30 de octubre de 2024, y finalizando en la Fecha de Vencimiento.
ISINUSE7S78BAC65
¿Ves algun dato que parece incorrecto?