Fecha | Valor Residual | Cap.Actualizado | Interes | Capital | Cupon |
---|---|---|---|---|---|
2025-03-13 | 100.00 | 100.00 | 4.43 | 0.00 | 4.43 |
2025-06-13 | 100.00 | 100.00 | 1.48 | 0.00 | 1.48 |
2025-09-13 | 100.00 | 100.00 | 1.48 | 0.00 | 1.48 |
2025-12-13 | 100.00 | 100.00 | 1.48 | 0.00 | 1.48 |
2026-03-13 | 100.00 | 100.00 | 1.48 | 0.00 | 1.48 |
2026-06-13 | 100.00 | 100.00 | 1.48 | 0.00 | 1.48 |
2026-09-13 | 100.00 | 100.00 | 1.48 | 0.00 | 1.48 |
2026-12-13 | 100.00 | 100.00 | 1.48 | 0.00 | 1.48 |
2027-03-13 | 50.00 | 50.00 | 1.48 | 50.00 | 51.48 |
2027-06-13 | 0.00 | 0.00 | 0.74 | 50.00 | 50.74 |
Datos | |||||
---|---|---|---|---|---|
Simbolo | YFCID | Valor Tecnico | 102.59 | Semana TIR | 13.09% |
Emisor | YPF Energia Electrica S.A.YPF Energia Electrica S.A. | Valor Residual | 100.00% | Mes TIR | -17.20% |
Tipo | Corporativo | Paridad | 102.15% | Semestre TIR | S/D |
País | Argentina | TIR | 5.01% | 1ero Enero TIR | S/D |
Mercado | BYMA | Macaulay Dur. | 2.24 | Año TIR | S/D |
Moneda | USD | Modified Dur. | 2.13 | Semana Precio | -1.13% |
Fecha/Hora | 2024-11-20 15:45:04 | Effective Dur. | 0.11 | Mes Precio | 2.75% |
Volumen | 18035 | Convexidad | 6.87 | Semestre Precio | S/D |
Precio | 104.80 | Int. Corrido | 2.59 | 1ero Enero Precio | S/D |
Variación | -0.19% | Cupon | 4.42 | Año Precio | S/D |
Sensibilidad Precio | |||
---|---|---|---|
Precio | Variación Precio | TIR | Variación TIR |
115.28 | 10.00% | 0.65 | -87.09% |
114.23 | 9.00% | 1.05 | -78.93% |
113.18 | 8.00% | 1.47 | -70.63% |
112.14 | 7.00% | 1.89 | -62.23% |
111.09 | 6.00% | 2.31 | -53.71% |
110.04 | 5.00% | 2.75 | -45.05% |
108.99 | 4.00% | 3.19 | -36.29% |
107.94 | 3.00% | 3.63 | -27.40% |
106.90 | 2.00% | 4.08 | -18.36% |
105.85 | 1.00% | 4.54 | -9.20% |
104.80 | 0.00% | 5.01 | 0.00% |
103.75 | -1.00% | 5.48 | 9.53% |
102.70 | -2.00% | 5.96 | 19.13% |
101.66 | -3.00% | 6.44 | 28.86% |
100.61 | -4.00% | 6.94 | 38.75% |
99.56 | -5.00% | 7.44 | 48.80% |
98.51 | -6.00% | 7.95 | 59.00% |
97.46 | -7.00% | 8.47 | 69.37% |
96.42 | -8.00% | 9.00 | 79.92% |
95.37 | -9.00% | 9.53 | 90.63% |
94.32 | -10.00% | 10.08 | 101.52% |
Sensibilidad TIR | |||
---|---|---|---|
TIR | Variación TIR | Precio | Variación Precio |
5.45 | 9.00% | 103.81 | -0.94% |
5.40 | 8.00% | 103.92 | -0.84% |
5.35 | 7.00% | 104.03 | -0.73% |
5.30 | 6.00% | 104.14 | -0.63% |
5.25 | 5.00% | 104.25 | -0.52% |
5.20 | 4.00% | 104.36 | -0.42% |
5.15 | 3.00% | 104.48 | -0.31% |
5.10 | 2.00% | 104.59 | -0.20% |
5.05 | 1.00% | 104.70 | -0.10% |
5.00 | 0.00% | 104.80 | 0.00% |
4.95 | -1.00% | 104.92 | 0.12% |
4.90 | -2.00% | 105.03 | 0.22% |
4.85 | -3.00% | 105.15 | 0.33% |
4.80 | -4.00% | 105.26 | 0.44% |
4.75 | -5.00% | 105.37 | 0.55% |
4.70 | -6.00% | 105.48 | 0.65% |
4.65 | -7.00% | 105.60 | 0.76% |
4.60 | -8.00% | 105.71 | 0.87% |
4.55 | -9.00% | 105.82 | 0.98% |
Desarrollo TIR 5.01% | ||||
---|---|---|---|---|
Fecha | Formula | Operacion | Factor | Tipo |
2025-03-13 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (270/360)) x 100.00% x 100.00]/[(1+5.01)^(112/360)] | 4.36 | i |
2025-06-13 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(202/360)] | 1.44 | i |
2025-09-13 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(292/360)] | 1.42 | i |
2025-12-13 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(382/360)] | 1.40 | i |
2026-03-13 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(472/360)] | 1.38 | i |
2026-06-13 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(562/360)] | 1.37 | i |
2026-09-13 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(652/360)] | 1.35 | i |
2026-12-13 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(742/360)] | 1.33 | i |
2027-03-13 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(832/360)] | 1.32 | i |
2027-03-13 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.5 x 100.00]/[(1+5.01)^(832/360)] | 44.66 | k |
2027-06-13 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 50.00% x 100.00]/[(1+5.01)^(922/360)] | 0.65 | i |
2027-06-13 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.5 x 100.00]/[(1+5.01)^(922/360)] | 44.12 | k |
Desarrollo Interes Corrido | Fecha | Formula | Operacion | Interes Corrido |
---|---|---|---|
2024-11-21 | (TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones) | (0.059 x (270/360)) x 1.00 x 1 x 100.00 x (158/270) | 2.59 |
Desarrollo Duracion Macaulay | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Fecha | Per. Ponderados Formula | Per. Pond. Operacion | Periodos Ponderados | Factor Formula | Factor Operacion | Factor | Factor/Precio | Factor/Precio x Num. Periodos | Cap. o Int. | |
2025-03-13 | (Dias para cupon / Dias Año) | (112 / 360) | 0.31 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (270/360)) x 100.00% x 100.00]/[(1+5.01)^(112/360)] | 4.36 | 0.04 | 0.01 | i | |
2025-06-13 | (Dias para cupon / Dias Año) | (202 / 360) | 0.56 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(202/360)] | 1.44 | 0.01 | 0.01 | i | |
2025-09-13 | (Dias para cupon / Dias Año) | (292 / 360) | 0.81 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(292/360)] | 1.42 | 0.01 | 0.01 | i | |
2025-12-13 | (Dias para cupon / Dias Año) | (382 / 360) | 1.06 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(382/360)] | 1.40 | 0.01 | 0.01 | i | |
2026-03-13 | (Dias para cupon / Dias Año) | (472 / 360) | 1.31 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(472/360)] | 1.38 | 0.01 | 0.02 | i | |
2026-06-13 | (Dias para cupon / Dias Año) | (562 / 360) | 1.56 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(562/360)] | 1.37 | 0.01 | 0.02 | i | |
2026-09-13 | (Dias para cupon / Dias Año) | (652 / 360) | 1.81 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(652/360)] | 1.35 | 0.01 | 0.02 | i | |
2026-12-13 | (Dias para cupon / Dias Año) | (742 / 360) | 2.06 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(742/360)] | 1.33 | 0.01 | 0.03 | i | |
2027-03-13 | (Dias para cupon / Dias Año) | (832 / 360) | 2.31 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.5 x 100.00]/[(1+5.01)^(832/360)]+[(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(832/360)] | 45.98 | 0.44 | 1.01 | ki | |
2027-06-13 | (Dias para cupon / Dias Año) | (922 / 360) | 2.56 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.5 x 100.00]/[(1+5.01)^(922/360)]+[(0.059 x (90/360)) x 50.00% x 100.00]/[(1+5.01)^(922/360)] | 44.77 | 0.43 | 1.09 | ki |
Desarrollo Duracion Macaulay Valor Final | |||||||||
---|---|---|---|---|---|---|---|---|---|
Formula | Operacion | Duracion Macaulay | |||||||
Suma Factores | 2.24 | 2.24 |
Desarrollo Duracion Modificada | ||
---|---|---|
Formula | Operacion | Duracion Modificada |
(Macaulay Duration)/(1 + TIR) | (2.24)/(1 + 5.01/100) | 2.13 |
Desarrollo Duracion Efectiva | ||
---|---|---|
Formula | Operacion | Duracion Efectiva |
(P+ - P-)/(2 x Po x ΔTIR) | (104.69 - 104.91 )/( 2 x 104.8 x 0.01) | 0.11 |
Desarrollo Convexidad Suma Factores | ||||||||
---|---|---|---|---|---|---|---|---|
Fecha | Formula n2+n | Operacion n2+n | Factor n2+n | Formula VAN | Operacion VAN | Factor VAN | Formula n2+n X Factor VAN | Cap. o Int. |
2025-03-13 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (112 / 360) ^ 2 + (112 / 360) | 0.41 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (270/360)) x 100.00% x 100.00]/[(1+5.01)^(112/360)] | 4.36 | 1.78 | i |
2025-06-13 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (202 / 360) ^ 2 + (202 / 360) | 0.88 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(202/360)] | 1.44 | 1.26 | i |
2025-09-13 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (292 / 360) ^ 2 + (292 / 360) | 1.47 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(292/360)] | 1.42 | 2.08 | i |
2025-12-13 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (382 / 360) ^ 2 + (382 / 360) | 2.19 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(382/360)] | 1.40 | 3.06 | i |
2026-03-13 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (472 / 360) ^ 2 + (472 / 360) | 3.03 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(472/360)] | 1.38 | 4.19 | i |
2026-06-13 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (562 / 360) ^ 2 + (562 / 360) | 4.00 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(562/360)] | 1.37 | 5.46 | i |
2026-09-13 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (652 / 360) ^ 2 + (652 / 360) | 5.09 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(652/360)] | 1.35 | 6.87 | i |
2026-12-13 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (742 / 360) ^ 2 + (742 / 360) | 6.31 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(742/360)] | 1.33 | 8.42 | i |
2027-03-13 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (832 / 360) ^ 2 + (832 / 360) | 7.65 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.5 x 100.00]/[(1+5.01)^(832/360)]+[(0.059 x (90/360)) x 100.00% x 100.00]/[(1+5.01)^(832/360)] | 45.98 | 351.86 | ki |
2027-06-13 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (922 / 360) ^ 2 + (922 / 360) | 9.12 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.5 x 100.00]/[(1+5.01)^(922/360)]+[(0.059 x (90/360)) x 50.00% x 100.00]/[(1+5.01)^(922/360)] | 44.77 | 408.34 | ki |
Formula Convexidad Valor Final | ||
---|---|---|
Formula | Operacion | Convexidad |
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores] | [1 / [104.8 x ((1 + 5.005) ^ 2)]] x 793.33] | 6.87 |
F. de Emision | 2024-06-13 | ||
F. de Vencimiento | 2027-06-13 | ||
Ajuste | |||
Dias previos para calculo ajuste o interes | |||
Capital | El capital de las Obligaciones Negociables Clase XVII será amortizado en 2 pagos conforme surge a continuación: 13 de marzo de 2027 y en la Fecha de Vencimiento de las Obligaciones Negociables Clase XVII, es decir el 13 de junio de 2027. | ||
Interes | TNA 5.9% | ||
Frecuencia | Los intereses serán pagados trimestralmente, en forma vencida, a partir del noveno mes contado desde la Fecha de Emisión y Liquidación inclusive, en las siguientes fechas: 13 de marzo de 2025, 13 de junio de 2025, 13 de septiembre de 2025, 13 de diciembre de 2025, 13 de marzo de 2026, 13 de junio de 2026, 13 de septiembre de 2026, 13 de diciembre de 2026, 13 de marzo de 2027 y en la Fecha de Vencimiento de las Obligaciones Negociables Clase XVII, el 13 de junio de 2027 | ||
ISIN | AR0947502206 |