Fecha | Valor Residual | Cap.Actualizado | Interes | Capital | Cupon |
---|---|---|---|---|---|
2025-03-11 | 100.00 | 103.06 | 4.28 | 0.00 | 4.28 |
2025-09-11 | 100.00 | 103.06 | 4.51 | 0.00 | 4.51 |
2026-03-11 | 100.00 | 103.06 | 4.51 | 0.00 | 4.51 |
2026-09-11 | 100.00 | 103.06 | 4.51 | 0.00 | 4.51 |
2027-03-11 | 100.00 | 103.06 | 4.51 | 0.00 | 4.51 |
2027-09-11 | 100.00 | 103.06 | 4.51 | 0.00 | 4.51 |
2028-03-11 | 100.00 | 103.06 | 4.51 | 0.00 | 4.51 |
2028-09-11 | 100.00 | 103.06 | 4.51 | 0.00 | 4.51 |
2029-03-11 | 100.00 | 103.06 | 4.51 | 0.00 | 4.51 |
2029-09-11 | 80.00 | 82.45 | 4.51 | 20.61 | 25.12 |
2030-03-11 | 80.00 | 82.45 | 3.61 | 0.00 | 3.61 |
2030-09-11 | 60.00 | 61.84 | 3.61 | 20.61 | 24.22 |
2031-03-11 | 60.00 | 61.84 | 2.71 | 0.00 | 2.71 |
2031-09-11 | 0.00 | 0.00 | 2.71 | 61.84 | 64.54 |
Datos | |||||
---|---|---|---|---|---|
Simbolo | YMCXD | Valor Tecnico | 104.62 | Semana TIR | 5.17% |
Emisor | YPF S.A.YPF S.A. | Valor Residual | 100.00% | Mes TIR | -4.34% |
Tipo | Corporativo | Paridad | 104.57% | Semestre TIR | S/D |
País | Argentina | TIR | 7.94% | 1ero Enero TIR | S/D |
Mercado | BYMA | Macaulay Dur. | 4.87 | Año TIR | S/D |
Moneda | USD | Modified Dur. | 4.51 | Semana Precio | -2.37% |
Fecha/Hora | 2024-11-22 17:00:23 | Effective Dur. | 0.36 | Mes Precio | 2.63% |
Volumen | 933783 | Convexidad | 28.14 | Semestre Precio | S/D |
Precio | 109.40 | Int. Corrido | 1.55 | 1ero Enero Precio | S/D |
Variación | -0.86% | Cupon | 4.28 | Año Precio | S/D |
Sensibilidad Precio | |||
---|---|---|---|
Precio | Variación Precio | TIR | Variación TIR |
120.34 | 10.00% | 5.86 | -26.17% |
119.25 | 9.00% | 6.06 | -23.70% |
118.15 | 8.00% | 6.26 | -21.20% |
117.06 | 7.00% | 6.46 | -18.67% |
115.96 | 6.00% | 6.66 | -16.11% |
114.87 | 5.00% | 6.87 | -13.52% |
113.78 | 4.00% | 7.08 | -10.89% |
112.68 | 3.00% | 7.29 | -8.23% |
111.59 | 2.00% | 7.50 | -5.54% |
110.49 | 1.00% | 7.72 | -2.80% |
109.40 | 0.00% | 7.94 | 0.00% |
108.31 | -1.00% | 8.16 | 2.79% |
107.21 | -2.00% | 8.39 | 5.64% |
106.12 | -3.00% | 8.62 | 8.54% |
105.02 | -4.00% | 8.85 | 11.46% |
103.93 | -5.00% | 9.09 | 14.44% |
102.84 | -6.00% | 9.33 | 17.47% |
101.74 | -7.00% | 9.57 | 20.53% |
100.65 | -8.00% | 9.82 | 23.65% |
99.55 | -9.00% | 10.07 | 26.80% |
98.46 | -10.00% | 10.32 | 30.01% |
Sensibilidad TIR | |||
---|---|---|---|
TIR | Variación TIR | Precio | Variación Precio |
8.65 | 9.00% | 105.94 | -3.16% |
8.58 | 8.00% | 106.32 | -2.82% |
8.50 | 7.00% | 106.69 | -2.47% |
8.42 | 6.00% | 107.07 | -2.13% |
8.34 | 5.00% | 107.45 | -1.78% |
8.26 | 4.00% | 107.84 | -1.43% |
8.18 | 3.00% | 108.22 | -1.08% |
8.10 | 2.00% | 108.61 | -0.72% |
8.02 | 1.00% | 109.00 | -0.37% |
7.94 | 0.00% | 109.40 | 0.00% |
7.86 | -1.00% | 109.78 | 0.35% |
7.78 | -2.00% | 110.18 | 0.71% |
7.70 | -3.00% | 110.57 | 1.07% |
7.62 | -4.00% | 110.97 | 1.44% |
7.54 | -5.00% | 111.37 | 1.80% |
7.46 | -6.00% | 111.77 | 2.17% |
7.38 | -7.00% | 112.18 | 2.54% |
7.30 | -8.00% | 112.59 | 2.91% |
7.23 | -9.00% | 112.99 | 3.29% |
Desarrollo TIR 7.94% | ||||
---|---|---|---|---|
Fecha | Formula | Operacion | Factor | Tipo |
2025-03-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (171/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(109/360)] | 4.19 | i |
2025-09-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(289/360)] | 4.24 | i |
2026-03-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(469/360)] | 4.08 | i |
2026-09-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(649/360)] | 3.93 | i |
2027-03-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(829/360)] | 3.78 | i |
2027-09-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1009/360)] | 3.64 | i |
2028-03-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1189/360)] | 3.50 | i |
2028-09-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1369/360)] | 3.37 | i |
2029-03-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1549/360)] | 3.25 | i |
2029-09-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1729/360)] | 3.12 | i |
2029-09-11 | [Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [0.2 x 100.00 x 1.03]/[(1+7.94)^(1729/360)] | 14.28 | k |
2030-03-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 80.00% x 100.00 x 1.03]/[(1+7.94)^(1909/360)] | 2.41 | i |
2030-09-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 80.00% x 100.00 x 1.03]/[(1+7.94)^(2089/360)] | 2.32 | i |
2030-09-11 | [Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [0.2 x 100.00 x 1.03]/[(1+7.94)^(2089/360)] | 13.23 | k |
2031-03-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 60.00% x 100.00 x 1.03]/[(1+7.94)^(2269/360)] | 1.67 | i |
2031-09-11 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 60.00% x 100.00 x 1.03]/[(1+7.94)^(2449/360)] | 1.61 | i |
2031-09-11 | [Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [0.6 x 100.00 x 1.03]/[(1+7.94)^(2449/360)] | 36.77 | k |
Desarrollo Interes Corrido | Fecha | Formula | Operacion | Interes Corrido |
---|---|---|---|
2024-11-22 | (TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL x (Dias Corridos / Dias entre Cupones) | (0.0875 x (171/360)) x 1.00 x 1 x 100.00 x 1.03 x (62/171) | 1.55 |
Desarrollo Duracion Macaulay | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Fecha | Per. Ponderados Formula | Per. Pond. Operacion | Periodos Ponderados | Factor Formula | Factor Operacion | Factor | Factor/Precio | Factor/Precio x Num. Periodos | Cap. o Int. | |
2025-03-11 | (Dias para cupon / Dias Año) | (109 / 360) | 0.30 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (171/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(109/360)] | 4.19 | 0.04 | 0.01 | i | |
2025-09-11 | (Dias para cupon / Dias Año) | (289 / 360) | 0.80 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(289/360)] | 4.24 | 0.04 | 0.03 | i | |
2026-03-11 | (Dias para cupon / Dias Año) | (469 / 360) | 1.30 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(469/360)] | 4.08 | 0.04 | 0.05 | i | |
2026-09-11 | (Dias para cupon / Dias Año) | (649 / 360) | 1.80 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(649/360)] | 3.93 | 0.04 | 0.06 | i | |
2027-03-11 | (Dias para cupon / Dias Año) | (829 / 360) | 2.30 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(829/360)] | 3.78 | 0.03 | 0.08 | i | |
2027-09-11 | (Dias para cupon / Dias Año) | (1009 / 360) | 2.80 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1009/360)] | 3.64 | 0.03 | 0.09 | i | |
2028-03-11 | (Dias para cupon / Dias Año) | (1189 / 360) | 3.30 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1189/360)] | 3.50 | 0.03 | 0.11 | i | |
2028-09-11 | (Dias para cupon / Dias Año) | (1369 / 360) | 3.80 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1369/360)] | 3.37 | 0.03 | 0.12 | i | |
2029-03-11 | (Dias para cupon / Dias Año) | (1549 / 360) | 4.30 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1549/360)] | 3.25 | 0.03 | 0.13 | i | |
2029-09-11 | (Dias para cupon / Dias Año) | (1729 / 360) | 4.80 | [Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [0.2 x 100.00 x 1.03]/[(1+7.94)^(1729/360)]+[(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1729/360)] | 17.41 | 0.16 | 0.76 | ki | |
2030-03-11 | (Dias para cupon / Dias Año) | (1909 / 360) | 5.30 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 80.00% x 100.00 x 1.03]/[(1+7.94)^(1909/360)] | 2.41 | 0.02 | 0.12 | i | |
2030-09-11 | (Dias para cupon / Dias Año) | (2089 / 360) | 5.80 | [Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [0.2 x 100.00 x 1.03]/[(1+7.94)^(2089/360)]+[(0.0875 x (180/360)) x 80.00% x 100.00 x 1.03]/[(1+7.94)^(2089/360)] | 15.55 | 0.14 | 0.82 | ki | |
2031-03-11 | (Dias para cupon / Dias Año) | (2269 / 360) | 6.30 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 60.00% x 100.00 x 1.03]/[(1+7.94)^(2269/360)] | 1.67 | 0.02 | 0.10 | i | |
2031-09-11 | (Dias para cupon / Dias Año) | (2449 / 360) | 6.80 | [Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] | [0.6 x 100.00 x 1.03]/[(1+7.94)^(2449/360)]+[(0.0875 x (180/360)) x 60.00% x 100.00 x 1.03]/[(1+7.94)^(2449/360)] | 38.38 | 0.35 | 2.39 | ki |
Desarrollo Duracion Macaulay Valor Final | |||||||||
---|---|---|---|---|---|---|---|---|---|
Formula | Operacion | Duracion Macaulay | |||||||
Suma Factores | 4.87 | 4.87 |
Desarrollo Duracion Modificada | ||
---|---|---|
Formula | Operacion | Duracion Modificada |
(Macaulay Duration)/(1 + TIR) | (4.87)/(1 + 7.94/100) | 4.51 |
Desarrollo Duracion Efectiva | ||
---|---|---|
Formula | Operacion | Duracion Efectiva |
(P+ - P-)/(2 x Po x ΔTIR) | (109.00 - 109.79 )/( 2 x 109.4 x 0.01) | 0.36 |
Desarrollo Convexidad Suma Factores | ||||||||
---|---|---|---|---|---|---|---|---|
Fecha | Formula n2+n | Operacion n2+n | Factor n2+n | Formula VAN | Operacion VAN | Factor VAN | Formula n2+n X Factor VAN | Cap. o Int. |
2025-03-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (109 / 360) ^ 2 + (109 / 360) | 0.39 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (171/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(109/360)] | 4.19 | 1.65 | i |
2025-09-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (289 / 360) ^ 2 + (289 / 360) | 1.45 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(289/360)] | 4.24 | 6.14 | i |
2026-03-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (469 / 360) ^ 2 + (469 / 360) | 3.00 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(469/360)] | 4.08 | 12.25 | i |
2026-09-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (649 / 360) ^ 2 + (649 / 360) | 5.05 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(649/360)] | 3.93 | 19.85 | i |
2027-03-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (829 / 360) ^ 2 + (829 / 360) | 7.61 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(829/360)] | 3.78 | 28.76 | i |
2027-09-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (1009 / 360) ^ 2 + (1009 / 360) | 10.66 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1009/360)] | 3.64 | 38.80 | i |
2028-03-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (1189 / 360) ^ 2 + (1189 / 360) | 14.21 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1189/360)] | 3.50 | 49.79 | i |
2028-09-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (1369 / 360) ^ 2 + (1369 / 360) | 18.26 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1369/360)] | 3.37 | 61.59 | i |
2029-03-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (1549 / 360) ^ 2 + (1549 / 360) | 22.82 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1549/360)] | 3.25 | 74.06 | i |
2029-09-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (1729 / 360) ^ 2 + (1729 / 360) | 27.87 | [Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [0.2 x 100.00 x 1.03]/[(1+7.94)^(1729/360)]+[(0.0875 x (180/360)) x 100.00% x 100.00 x 1.03]/[(1+7.94)^(1729/360)] | 17.41 | 485.10 | ki |
2030-03-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (1909 / 360) ^ 2 + (1909 / 360) | 33.42 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 80.00% x 100.00 x 1.03]/[(1+7.94)^(1909/360)] | 2.41 | 80.40 | i |
2030-09-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (2089 / 360) ^ 2 + (2089 / 360) | 39.48 | [Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [0.2 x 100.00 x 1.03]/[(1+7.94)^(2089/360)]+[(0.0875 x (180/360)) x 80.00% x 100.00 x 1.03]/[(1+7.94)^(2089/360)] | 15.55 | 613.72 | ki |
2031-03-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (2269 / 360) ^ 2 + (2269 / 360) | 46.03 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0875 x (180/360)) x 60.00% x 100.00 x 1.03]/[(1+7.94)^(2269/360)] | 1.67 | 76.94 | i |
2031-09-11 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (2449 / 360) ^ 2 + (2449 / 360) | 53.08 | [Amortizacion % x Valor Nominal x Conversion MEP/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion MEP/ARS]/[(1+TIR)^(Dias restantes/Dias año)] | [0.6 x 100.00 x 1.03]/[(1+7.94)^(2449/360)]+[(0.0875 x (180/360)) x 60.00% x 100.00 x 1.03]/[(1+7.94)^(2449/360)] | 38.38 | 2037.46 | ki |
Formula Convexidad Valor Final | ||
---|---|---|
Formula | Operacion | Convexidad |
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores] | [1 / [109.4 x ((1 + 7.9386875000001) ^ 2)]] x 3586.51] | 28.14 |
F. de Emision | 2024-09-20 | ||
F. de Vencimiento | 2031-09-11 | ||
Ajuste | |||
Dias previos para calculo ajuste o interes | |||
Capital | El capital de las Obligaciones Negociables se amortizará en 3 (tres) cuotas anualesy consecutivas, comenzando en septiembre de 2029 y finalizando en la Fecha de Vencimiento, deconformidad con el siguiente cronograma:11 de septiembre 2029 20%11 de septiembre de 2030 20%11 de septiembre de 2031 60% | ||
Interes | tasa fija nominal anual de 8,750% | ||
Frecuencia | Los intereses sobre las Obligaciones Negociables Clase XXXI Adicionalesse pagarán semestralmente en efectivo, por períodos vencidos, en las fechas que se indican a continuación:11 de marzo de 2025, 11 de septiembre de 2025, 11 de marzo de 2026, 11 de septiembre de 2026, 11 demarzo de 2027, 11 de septiembre de 2027, 11 de marzo de 2028, 11 de septiembre de 2028, 11 de marzode 2029, 11 de septiembre de 2029, 11 de marzo de 2030, 11 de septiembre de 2030, 11 de marzo de 2031,y en la Fecha de Vencimiento, es decir, el 11 de septiembre de 2031. | ||
ISIN | USP989MJBV29 |