Transp. Gas del Sur. Clase III. Tasa Fija. 8.50%. USD. Vto. 07-2031.
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2025-01-24100.00118679.005043.860.005043.86
2025-07-24100.00118679.005043.860.005043.86
2026-01-24100.00118679.005043.860.005043.86
2026-07-24100.00118679.005043.860.005043.86
2027-01-24100.00118679.005043.860.005043.86
2027-07-24100.00118679.005043.860.005043.86
2028-01-24100.00118679.005043.860.005043.86
2028-07-24100.00118679.005043.860.005043.86
2029-01-24100.00118679.005043.860.005043.86
2029-07-24100.00118679.005043.860.005043.86
2030-01-24100.00118679.005043.860.005043.86
2030-07-24100.00118679.005043.860.005043.86
2031-01-24100.00118679.005043.860.005043.86
2031-07-240.000.005043.86118679.00123722.86
Datos
SimboloTSC3OValor Tecnico121004.78Semana TIR2.14%
EmisorTransportadora de Gas del Sur Transportadora de Gas del Sur S.A.Valor Residual100.00%Mes TIR-0.08%
TipoCorporativoParidad105.21%Semestre TIRS/D
PaísArgentinaTIR7.62%1ero Enero TIRS/D
MercadoBYMAMacaulay Dur.5.23Año TIRS/D
MonedaARSModified Dur.4.86Semana Precio0.71%
Fecha/Hora2024-10-17 16:06:43Effective Dur.0.37Mes Precio-3.77%
Volumen420000Convexidad32.33Semestre PrecioS/D
Precio127310.00Int. Corrido2325.781ero Enero PrecioS/D
Variación1.06%Cupon5043.86Año PrecioS/D
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
140041.0010.00%5.70-25.25%
138767.909.00%5.88-22.87%
137494.808.00%6.06-20.46%
136221.707.00%6.25-18.01%
134948.606.00%6.44-15.53%
133675.505.00%6.63-13.02%
132402.404.00%6.82-10.48%
131129.303.00%7.02-7.91%
129856.202.00%7.22-5.29%
128583.101.00%7.42-2.65%
127310.000.00%7.620.00%
126036.90-1.00%7.832.75%
124763.80-2.00%8.045.51%
123490.70-3.00%8.258.29%
122217.60-4.00%8.4711.13%
120944.50-5.00%8.6914.00%
119671.40-6.00%8.9116.91%
118398.30-7.00%9.1419.88%
117125.20-8.00%9.3622.88%
115852.10-9.00%9.6025.93%
114579.00-10.00%9.8329.03%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
8.319.00%123169.28-3.25%
8.238.00%123621.27-2.90%
8.157.00%124075.53-2.54%
8.086.00%124532.09-2.18%
8.005.00%124990.96-1.82%
7.924.00%125452.14-1.46%
7.853.00%125915.66-1.10%
7.772.00%126381.53-0.73%
7.701.00%126849.76-0.36%
7.620.00%127310.000.00%
7.54-1.00%127793.360.38%
7.47-2.00%128268.770.75%
7.39-3.00%128746.591.13%
7.32-4.00%129226.841.51%
7.24-5.00%129709.541.88%
7.16-6.00%130194.712.27%
7.09-7.00%130682.352.65%
7.01-8.00%131172.483.03%
6.93-9.00%131665.123.42%
Desarrollo TIR
Desarrollo TIR 7.62%
FechaFormulaOperacionFactorTipo
2025-01-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(97/360)]4945.04i
2025-07-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(277/360)]4766.76i
2026-01-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(457/360)]4594.90i
2026-07-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(637/360)]4429.25i
2027-01-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(817/360)]4269.56i
2027-07-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(997/360)]4115.64i
2028-01-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1177/360)]3967.26i
2028-07-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1357/360)]3824.23i
2029-01-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1537/360)]3686.36i
2029-07-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1717/360)]3553.46i
2030-01-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1897/360)]3425.35i
2030-07-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(2077/360)]3301.85i
2031-01-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(2257/360)]3182.82i
2031-07-24[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(2437/360)]3068.07i
2031-07-24[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00 x 1186.79]/[(1+7.62)^(2437/360)]72189.84k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2024-10-17(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL x (Dias Corridos / Dias entre Cupones)(0.085 x (180/360)) x 1.00 x 1 x 100.00 x 1186.79 x (83/180)2325.78
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-01-24(Dias para cupon / Dias Año)(97 / 360)0.27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(97/360)]4945.010.040.01i
2025-07-24(Dias para cupon / Dias Año)(277 / 360)0.77[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(277/360)]4766.690.040.03i
2026-01-24(Dias para cupon / Dias Año)(457 / 360)1.27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(457/360)]4594.800.040.05i
2026-07-24(Dias para cupon / Dias Año)(637 / 360)1.77[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(637/360)]4429.100.030.06i
2027-01-24(Dias para cupon / Dias Año)(817 / 360)2.27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(817/360)]4269.380.030.08i
2027-07-24(Dias para cupon / Dias Año)(997 / 360)2.77[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(997/360)]4115.420.030.09i
2028-01-24(Dias para cupon / Dias Año)(1177 / 360)3.27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1177/360)]3967.020.030.10i
2028-07-24(Dias para cupon / Dias Año)(1357 / 360)3.77[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1357/360)]3823.960.030.11i
2029-01-24(Dias para cupon / Dias Año)(1537 / 360)4.27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1537/360)]3686.070.030.12i
2029-07-24(Dias para cupon / Dias Año)(1717 / 360)4.77[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1717/360)]3553.140.030.13i
2030-01-24(Dias para cupon / Dias Año)(1897 / 360)5.27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1897/360)]3425.010.030.14i
2030-07-24(Dias para cupon / Dias Año)(2077 / 360)5.77[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(2077/360)]3301.500.030.15i
2031-01-24(Dias para cupon / Dias Año)(2257 / 360)6.27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(2257/360)]3182.440.020.16i
2031-07-24(Dias para cupon / Dias Año)(2437 / 360)6.77[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00 x 1186.79]/[(1+7.62)^(2437/360)]+[(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(2437/360)]75248.440.594.00ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores5.235.23
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(5.23)/(1 + 7.62/100)4.86
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(126837.32 - 127781.04 )/( 2 x 127310 x 0.01)0.37
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-01-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](97 / 360) ^ 2 + (97 / 360)0.34[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(97/360)]4945.011691.42i
2025-07-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](277 / 360) ^ 2 + (277 / 360)1.36[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(277/360)]4766.696489.79i
2026-01-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](457 / 360) ^ 2 + (457 / 360)2.88[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(457/360)]4594.8013237.30i
2026-07-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](637 / 360) ^ 2 + (637 / 360)4.90[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(637/360)]4429.1021704.27i
2027-01-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](817 / 360) ^ 2 + (817 / 360)7.42[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(817/360)]4269.3831678.07i
2027-07-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](997 / 360) ^ 2 + (997 / 360)10.44[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(997/360)]4115.4242962.01i
2028-01-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1177 / 360) ^ 2 + (1177 / 360)13.96[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1177/360)]3967.0255374.45i
2028-07-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1357 / 360) ^ 2 + (1357 / 360)17.98[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1357/360)]3823.9668747.78i
2029-01-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1537 / 360) ^ 2 + (1537 / 360)22.50[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1537/360)]3686.0782927.62i
2029-07-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1717 / 360) ^ 2 + (1717 / 360)27.52[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1717/360)]3553.1497771.95i
2030-01-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1897 / 360) ^ 2 + (1897 / 360)33.04[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(1897/360)]3425.01113150.33i
2030-07-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2077 / 360) ^ 2 + (2077 / 360)39.06[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(2077/360)]3301.50128943.20i
2031-01-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2257 / 360) ^ 2 + (2257 / 360)45.58[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(2257/360)]3182.44145041.13i
2031-07-24[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](2437 / 360) ^ 2 + (2437 / 360)52.59[Amortizacion % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/CCL]/[(1+TIR)^(Dias restantes/Dias año)][1 x 100.00 x 1186.79]/[(1+7.62)^(2437/360)]+[(0.085 x (180/360)) x 100.00% x 100.00 x 1186.79]/[(1+7.62)^(2437/360)]75248.443957678.33ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [127310 x ((1 + 7.622) ^ 2)]] x 4767397.65]32.33
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2024-07-24
F. de Vencimiento2031-07-24
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl capital de las Obligaciones Negociables será amortizado en un único pago en la Fecha de Vencimiento.
InteresTasa de Interés: 8,500% nominal anual.
FrecuenciaEl día 24 de los meses de enero y julio de cada año hasta la Fecha de Vencimiento, comenzando el 24 de enero de 2025.
ISINUSP9308RBA07
¿Ves algun dato que parece incorrecto?