Entre Rios. Reestructurado. Step-Up. USD. Vto. 08-2028.
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2024-02-0881.0096530.134424.3010725.5715149.87
2024-08-0872.0094158.004369.5211769.7516139.27
2025-02-0863.0075091.593540.0310727.3714267.40
2025-08-0854.0061873.742977.6710312.2913289.96
2026-02-0845.0051561.452552.2910312.2912864.58
2026-08-0836.0041249.162126.9110312.2912439.20
2027-02-0827.0030936.871701.5310312.2912013.82
2027-08-0818.0020624.581276.1510312.2911588.44
2028-02-089.0010312.29850.7610312.2911163.05
2028-08-080.000.00425.3810312.2910737.67
Expresar en moneda de pago MEP
Datos
SimboloERF25Valor Tecnico73707.95Semana TIR-40.20%
EmisorEntre RiosEntre RiosValor Residual63.00%Mes TIR-66.12%
TipoProvincialParidad103.65%Semestre TIR-53.02%
PaísArgentinaTIR6.01%1ero Enero TIR-28.00%
MercadoBYMAMacaulay Dur.1.62Año TIR-69.94%
MonedaARSModified Dur.1.52Semana Precio3.24%
Fecha/Hora2025-05-09 16:50:15Effective Dur.0.09Mes Precio0.53%
Volumen338Convexidad4.64Semestre Precio-1.42%
Precio76400.00Int. Corrido1521.921ero Enero Precio-12.18%
Variación2.55%Cupon13289.96Año Precio8.37%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
84040.0010.00%0.04-99.33%
83276.009.00%0.59-90.19%
82512.008.00%1.15-80.91%
81748.007.00%1.72-71.44%
80984.006.00%2.30-61.81%
80220.005.00%2.89-51.99%
79456.004.00%3.49-41.99%
78692.003.00%4.10-31.80%
77928.002.00%4.72-21.39%
77164.001.00%5.36-10.81%
76400.000.00%6.010.00%
75636.00-1.00%6.6711.03%
74872.00-2.00%7.3522.28%
74108.00-3.00%8.0433.77%
73344.00-4.00%8.7445.50%
72580.00-5.00%9.4657.47%
71816.00-6.00%10.2069.71%
71052.00-7.00%10.9582.21%
70288.00-8.00%11.7294.98%
69524.00-9.00%12.50108.05%
68760.00-10.00%13.31121.40%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
6.559.00%75775.12-0.82%
6.498.00%75844.02-0.73%
6.437.00%75913.05-0.64%
6.376.00%75982.21-0.55%
6.315.00%76051.49-0.46%
6.254.00%76120.91-0.37%
6.193.00%76190.44-0.27%
6.132.00%76260.11-0.18%
6.071.00%76329.90-0.09%
6.010.00%76400.000.00%
5.95-1.00%76469.860.09%
5.89-2.00%76540.040.18%
5.83-3.00%76610.340.28%
5.77-4.00%76680.780.37%
5.71-5.00%76751.340.46%
5.65-6.00%76822.030.55%
5.59-7.00%76892.850.65%
5.53-8.00%76963.810.74%
5.47-9.00%77034.890.83%
Desarrollo TIR
Desarrollo TIR 6.01%
FechaFormulaOperacionFactorTipo
2025-08-08[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0825 x (180/360)) x 63.00% x 100.00 x 1145.81]/[(1+6.01)^(88/360)]2935.49i
2025-08-08[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(88/360)]10166.21k
2026-02-08[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0825 x (180/360)) x 54.00% x 100.00 x 1145.81]/[(1+6.01)^(268/360)]2443.77i
2026-02-08[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(268/360)]9873.83k
2026-08-08[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0825 x (180/360)) x 45.00% x 100.00 x 1145.81]/[(1+6.01)^(448/360)]1977.91i
2026-08-08[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(448/360)]9589.86k
2027-02-08[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0825 x (180/360)) x 36.00% x 100.00 x 1145.81]/[(1+6.01)^(628/360)]1536.82i
2027-02-08[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(628/360)]9314.06k
2027-08-08[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0825 x (180/360)) x 27.00% x 100.00 x 1145.81]/[(1+6.01)^(808/360)]1119.47i
2027-08-08[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(808/360)]9046.19k
2028-02-08[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0825 x (180/360)) x 18.00% x 100.00 x 1145.81]/[(1+6.01)^(988/360)]724.85i
2028-02-08[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(988/360)]8786.02k
2028-08-08[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.0825 x (180/360)) x 9.00% x 100.00 x 1145.81]/[(1+6.01)^(1168/360)]352.00i
2028-08-08[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(1168/360)]8533.33k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-10(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP x (Dias Corridos / Dias entre Cupones)(0.0825 x (180/360)) x 1.00 x 0.63 x 100.00 x 1145.81 x (92/180)1521.92
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-08-08(Dias para cupon / Dias Año)(88 / 360)0.24[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(88/360)]+[(0.0825 x (180/360)) x 63.00% x 100.00 x 1145.81]/[(1+6.01)^(88/360)]13101.690.170.04ki
2026-02-08(Dias para cupon / Dias Año)(268 / 360)0.74[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(268/360)]+[(0.0825 x (180/360)) x 54.00% x 100.00 x 1145.81]/[(1+6.01)^(268/360)]12317.550.160.12ki
2026-08-08(Dias para cupon / Dias Año)(448 / 360)1.24[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(448/360)]+[(0.0825 x (180/360)) x 45.00% x 100.00 x 1145.81]/[(1+6.01)^(448/360)]11567.680.150.19ki
2027-02-08(Dias para cupon / Dias Año)(628 / 360)1.74[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(628/360)]+[(0.0825 x (180/360)) x 36.00% x 100.00 x 1145.81]/[(1+6.01)^(628/360)]10850.760.140.25ki
2027-08-08(Dias para cupon / Dias Año)(808 / 360)2.24[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(808/360)]+[(0.0825 x (180/360)) x 27.00% x 100.00 x 1145.81]/[(1+6.01)^(808/360)]10165.500.130.30ki
2028-02-08(Dias para cupon / Dias Año)(988 / 360)2.74[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(988/360)]+[(0.0825 x (180/360)) x 18.00% x 100.00 x 1145.81]/[(1+6.01)^(988/360)]9510.700.120.34ki
2028-08-08(Dias para cupon / Dias Año)(1168 / 360)3.24[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(1168/360)]+[(0.0825 x (180/360)) x 9.00% x 100.00 x 1145.81]/[(1+6.01)^(1168/360)]8885.150.120.38ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores1.621.62
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(1.62)/(1 + 6.01/100)1.52
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(76329.09 - 76469.07 )/( 2 x 76400 x 0.01)0.09
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-08-08[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](88 / 360) ^ 2 + (88 / 360)0.30[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(88/360)]+[(0.0825 x (180/360)) x 63.00% x 100.00 x 1145.81]/[(1+6.01)^(88/360)]13101.693985.50ki
2026-02-08[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](268 / 360) ^ 2 + (268 / 360)1.30[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(268/360)]+[(0.0825 x (180/360)) x 54.00% x 100.00 x 1145.81]/[(1+6.01)^(268/360)]12317.5515996.08ki
2026-08-08[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](448 / 360) ^ 2 + (448 / 360)2.79[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(448/360)]+[(0.0825 x (180/360)) x 45.00% x 100.00 x 1145.81]/[(1+6.01)^(448/360)]11567.6832309.53ki
2027-02-08[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](628 / 360) ^ 2 + (628 / 360)4.79[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(628/360)]+[(0.0825 x (180/360)) x 36.00% x 100.00 x 1145.81]/[(1+6.01)^(628/360)]10850.7651948.33ki
2027-08-08[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](808 / 360) ^ 2 + (808 / 360)7.28[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(808/360)]+[(0.0825 x (180/360)) x 27.00% x 100.00 x 1145.81]/[(1+6.01)^(808/360)]10165.5074024.95ki
2028-02-08[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](988 / 360) ^ 2 + (988 / 360)10.28[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(988/360)]+[(0.0825 x (180/360)) x 18.00% x 100.00 x 1145.81]/[(1+6.01)^(988/360)]9510.7097735.91ki
2028-08-08[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1168 / 360) ^ 2 + (1168 / 360)13.77[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.09 x 100.00 x 1145.81]/[(1+6.01)^(1168/360)]+[(0.0825 x (180/360)) x 9.00% x 100.00 x 1145.81]/[(1+6.01)^(1168/360)]8885.15122356.15ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [76400 x ((1 + 6.0106875000001) ^ 2)]] x 398356.45]4.64
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2021-02-08
F. de Vencimiento2028-08-08
Ajuste
Dias previos para calculo ajuste o interes
Capital8 de febrero de 2023: 5%, 8 de agosto de 2023: 5%, 8 de febrero de 2024: 9%, 8 de agosto de 2024: 9%, 8 de febrero de 2025: 9%, 8 de agosto de 2025: 9%, 8 de febrero de 2026: 9%, 8 de agosto de 2026: 9%, 8 de febrero de 2027: 9%, 8 de agosto de 2027: 9%, 8 de febrero de 2028: 9%, 8 de agosto de 2028: 9%.
InteresPara el período desde, e incluyendo, el 8 de febrero de 2021 hasta, pero excluyendo, el 8 de agosto de 2022, la tasa de interés de los Bonos será del 5,00% anual, para el período desde, e incluyendo, el 8 de agosto de 2022 hasta, pero excluyendo, el 8 de febrero de 2023, la tasa de interés de los Bonos será del 5,75% anual, para el período desde, e incluyendo, el 8 de febrero de 2023 hasta, pero excluyendo, el 8 de agosto de 2023, la tasa de interés de los Bonos será del 8,10% anual, para el período desde, e incluyendo, el 8 de agosto de 2023 hasta, pero excluyendo, el 8 de agosto de 2028, la tasa de interés de los Bonos será del 8,25% anual.
FrecuenciaPara el período desde, e incluyendo, el 8 de febrero de 2021 hasta, pero excluyendo, el 8 de agosto de 2022, la tasa de interés de los Bonos será del 5,00% anual, para el período desde, e incluyendo, el 8 de agosto de 2022 hasta, pero excluyendo, el 8 de febrero de 2023, la tasa de interés de los Bonos será del 5,75% anual, para el período desde, e incluyendo, el 8 de febrero de 2023 hasta, pero excluyendo, el 8 de agosto de 2023, la tasa de interés de los Bonos será del 8,10% anual, para el período desde, e incluyendo, el 8 de agosto de 2023 hasta, pero excluyendo, el 8 de agosto de 2028, la tasa de interés de los Bonos será del 8,25% anual.
ISINUSP37341AA50