BOPREAL Serie 2. Tasa 0% USD. Vto. 06-2025
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2024-07-3191.6791.670.008.338.33
2024-08-3183.3483.340.008.338.33
2024-10-0175.0175.010.008.338.33
2024-11-0166.6866.680.008.338.33
2024-12-0158.3558.350.008.338.33
2025-01-0150.0250.020.008.338.33
2025-02-0141.6941.690.008.338.33
2025-03-0133.3633.360.008.338.33
2025-04-0125.0325.030.008.338.33
2025-05-0116.7016.700.008.338.33
2025-06-018.378.370.008.338.33
2025-06-300.000.000.008.378.37
Datos
SimboloBPJ5DValor Tecnico16.70Semana TIR-153.89%
EmisorBCRABCRAValor Residual16.70%Mes TIR-87.32%
TipoBanco centralParidad111.86%Semestre TIR-1902.33%
PaísArgentinaTIR-67.56%1ero Enero TIR-196.12%
MercadoBYMAMacaulay Dur.0.10Año TIR-1884.03%
MonedaUSDModified Dur.0.31Semana Precio9.05%
Fecha/Hora2025-05-09 16:32:41Effective Dur.-0.21Mes Precio-29.96%
Volumen35900Convexidad1.07Semestre Precio-72.33%
Precio18.68Int. Corrido0.001ero Enero Precio-63.52%
Variación2.49%Cupon8.33Año Precio-80.84%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
20.5510.00%-87.3329.26%
20.369.00%-86.1427.50%
20.178.00%-84.8325.56%
19.997.00%-83.3723.41%
19.806.00%-81.7621.02%
19.615.00%-79.9718.37%
19.434.00%-77.9915.44%
19.243.00%-75.7812.17%
19.052.00%-73.328.53%
18.871.00%-70.584.47%
18.680.00%-67.530.00%
18.49-1.00%-64.11-5.11%
18.31-2.00%-60.28-10.77%
18.12-3.00%-56.00-17.11%
17.93-4.00%-51.19-24.22%
17.75-5.00%-45.79-32.22%
17.56-6.00%-39.72-41.21%
17.37-7.00%-32.87-51.34%
17.19-8.00%-25.15-62.77%
17.00-9.00%-16.42-75.69%
16.81-10.00%-6.54-90.32%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
-61.48-9.00%18.36-1.70%
-62.16-8.00%18.40-1.52%
-62.83-7.00%18.43-1.35%
-63.51-6.00%18.46-1.17%
-64.18-5.00%18.50-0.98%
-64.86-4.00%18.53-0.79%
-65.53-3.00%18.57-0.60%
-66.21-2.00%18.61-0.40%
-66.88-1.00%18.64-0.20%
-67.560.00%18.680.00%
-68.241.00%18.720.22%
-68.912.00%18.760.44%
-69.593.00%18.800.66%
-70.264.00%18.850.89%
-70.945.00%18.891.12%
-71.616.00%18.931.36%
-72.297.00%18.981.61%
-72.968.00%19.031.86%
-73.649.00%19.082.12%
Desarrollo TIR
Desarrollo TIR -67.56%
FechaFormulaOperacionFactorTipo
2025-06-01[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.0833 x 100.00]/[(1+-67.56)^(21/360)]8.90k
2025-06-30[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0 x (494/360)) x 8.37% x 100.00]/[(1+-67.56)^(50/360)]0.00i
2025-06-30[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.0837 x 100.00]/[(1+-67.56)^(50/360)]9.79k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-10(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones)(0 x (494/360)) x 1.00 x 1 x 100.00 x (444/494)0.00
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-06-01(Dias para cupon / Dias Año)(21 / 360)0.06[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.0833 x 100.00]/[(1+-67.56)^(21/360)]8.900.480.03k
2025-06-30(Dias para cupon / Dias Año)(50 / 360)0.14[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.0837 x 100.00]/[(1+-67.56)^(50/360)]+[(0 x (494/360)) x 8.37% x 100.00]/[(1+-67.56)^(50/360)]9.790.520.07ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores0.100.10
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(0.10)/(1 + -67.56/100)0.31
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(18.72 - 18.64 )/( 2 x 18.682 x 0.01)-0.21
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-06-01[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](21 / 360) ^ 2 + (21 / 360)0.06[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.0833 x 100.00]/[(1+-67.56)^(21/360)]8.900.55k
2025-06-30[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](50 / 360) ^ 2 + (50 / 360)0.16[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.0837 x 100.00]/[(1+-67.56)^(50/360)]+[(0 x (494/360)) x 8.37% x 100.00]/[(1+-67.56)^(50/360)]9.791.55ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [18.682 x ((1 + -67.5596875) ^ 2)]] x 2.10]1.07
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2024-02-16
F. de Vencimiento2025-06-30
Ajuste
Dias previos para calculo ajuste o interes
CapitalDoce (12) cuotas mensuales consecutivas, el último día calendario de cada mes, la primera de ellas se abonará el 31 de julio de 2024. Las primeras once cuotas de 8.33% del valor nominal original y la última de 8.37% del valor nominal original, pagaderas en dólares estadounidenses. Si la fecha de pago fuere un día no hábil, el pago se realizará el día hábil inmediato posterior.
Interesno devengarán intereses.
Frecuenciano devengarán intereses.
ISINAR0495070226
¿Ves algun dato que parece incorrecto?