Fecha | Valor Residual | Cap.Actualizado | Interes | Capital | Cupon |
---|---|---|---|---|---|
2024-03-08 | 100.00 | 100.00 | 2.49 | 0.00 | 2.49 |
2024-09-08 | 100.00 | 100.00 | 2.52 | 0.00 | 2.52 |
2025-03-08 | 100.00 | 100.00 | 2.48 | 0.00 | 2.48 |
2025-09-08 | 0.00 | 0.00 | 2.52 | 100.00 | 102.52 |
Datos | |||||
---|---|---|---|---|---|
Simbolo | MGCJD | Valor Tecnico | 100.86 | Semana TIR | -27.37% |
Emisor | Pampa Energia S.A.Pampa Energia S.A. | Valor Residual | 100.00% | Mes TIR | 8.95% |
Tipo | Corporativo | Paridad | 100.28% | Semestre TIR | 15.32% |
País | Argentina | TIR | 4.14% | 1ero Enero TIR | -27.24% |
Mercado | BYMA | Macaulay Dur. | 0.33 | Año TIR | -16.36% |
Moneda | USD | Modified Dur. | 0.32 | Semana Precio | 0.65% |
Fecha/Hora | 2025-05-06 17:00:28 | Effective Dur. | 0.01 | Mes Precio | 0.20% |
Volumen | 420502 | Convexidad | 0.41 | Semestre Precio | -0.83% |
Precio | 101.15 | Int. Corrido | 0.86 | 1ero Enero Precio | 0.00% |
Variación | -0.25% | Cupon | 102.52 | Año Precio | 0.15% |
Sensibilidad Precio | |||
---|---|---|---|
Precio | Variación Precio | TIR | Variación TIR |
111.27 | 10.00% | -21.88 | -628.46% |
110.25 | 9.00% | -19.70 | -575.74% |
109.24 | 8.00% | -17.43 | -521.06% |
108.23 | 7.00% | -15.08 | -464.32% |
107.22 | 6.00% | -12.64 | -405.38% |
106.21 | 5.00% | -10.11 | -344.17% |
105.20 | 4.00% | -7.48 | -280.59% |
104.18 | 3.00% | -4.74 | -214.49% |
103.17 | 2.00% | -1.90 | -145.77% |
102.16 | 1.00% | 1.06 | -74.30% |
101.15 | 0.00% | 4.14 | 0.00% |
100.14 | -1.00% | 7.35 | 77.54% |
99.13 | -2.00% | 10.69 | 158.17% |
98.12 | -3.00% | 14.17 | 242.16% |
97.10 | -4.00% | 17.79 | 329.74% |
96.09 | -5.00% | 21.57 | 421.04% |
95.08 | -6.00% | 25.51 | 516.29% |
94.07 | -7.00% | 29.63 | 615.70% |
93.06 | -8.00% | 33.93 | 719.51% |
92.05 | -9.00% | 38.42 | 827.93% |
91.04 | -10.00% | 43.11 | 941.23% |
Sensibilidad TIR | |||
---|---|---|---|
TIR | Variación TIR | Precio | Variación Precio |
4.51 | 9.00% | 101.03 | -0.12% |
4.47 | 8.00% | 101.04 | -0.10% |
4.43 | 7.00% | 101.06 | -0.09% |
4.39 | 6.00% | 101.07 | -0.08% |
4.35 | 5.00% | 101.08 | -0.06% |
4.31 | 4.00% | 101.10 | -0.05% |
4.26 | 3.00% | 101.11 | -0.04% |
4.22 | 2.00% | 101.12 | -0.03% |
4.18 | 1.00% | 101.14 | -0.01% |
4.14 | 0.00% | 101.15 | 0.00% |
4.10 | -1.00% | 101.16 | 0.01% |
4.06 | -2.00% | 101.18 | 0.03% |
4.02 | -3.00% | 101.19 | 0.04% |
3.97 | -4.00% | 101.20 | 0.05% |
3.93 | -5.00% | 101.22 | 0.07% |
3.89 | -6.00% | 101.23 | 0.08% |
3.85 | -7.00% | 101.24 | 0.09% |
3.81 | -8.00% | 101.26 | 0.11% |
3.77 | -9.00% | 101.27 | 0.12% |
Desarrollo TIR 4.14% | ||||
---|---|---|---|---|
Fecha | Formula | Operacion | Factor | Tipo |
2025-09-08 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.05 x (184/365)) x 100.00% x 100.00]/[(1+4.14)^(121/365)] | 2.49 | i |
2025-09-08 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [1 x 100.00]/[(1+4.14)^(121/365)] | 98.66 | k |
Desarrollo Interes Corrido | Fecha | Formula | Operacion | Interes Corrido |
---|---|---|---|
2025-05-10 | (TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones) | (0.05 x (184/365)) x 1.00 x 1 x 100.00 x (63/184) | 0.86 |
Desarrollo Duracion Macaulay | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Fecha | Per. Ponderados Formula | Per. Pond. Operacion | Periodos Ponderados | Factor Formula | Factor Operacion | Factor | Factor/Precio | Factor/Precio x Num. Periodos | Cap. o Int. | |
2025-09-08 | (Dias para cupon / Dias Año) | (121 / 365) | 0.33 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [1 x 100.00]/[(1+4.14)^(121/365)]+[(0.05 x (184/365)) x 100.00% x 100.00]/[(1+4.14)^(121/365)] | 101.15 | 1.00 | 0.33 | ki |
Desarrollo Duracion Macaulay Valor Final | |||||||||
---|---|---|---|---|---|---|---|---|---|
Formula | Operacion | Duracion Macaulay | |||||||
Suma Factores | 0.33 | 0.33 |
Desarrollo Duracion Modificada | ||
---|---|---|
Formula | Operacion | Duracion Modificada |
(Macaulay Duration)/(1 + TIR) | (0.33)/(1 + 4.14/100) | 0.32 |
Desarrollo Duracion Efectiva | ||
---|---|---|
Formula | Operacion | Duracion Efectiva |
(P+ - P-)/(2 x Po x ΔTIR) | (101.14 - 101.16 )/( 2 x 101.15 x 0.01) | 0.01 |
Desarrollo Convexidad Suma Factores | ||||||||
---|---|---|---|---|---|---|---|---|
Fecha | Formula n2+n | Operacion n2+n | Factor n2+n | Formula VAN | Operacion VAN | Factor VAN | Formula n2+n X Factor VAN | Cap. o Int. |
2025-09-08 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (121 / 365) ^ 2 + (121 / 365) | 0.44 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [1 x 100.00]/[(1+4.14)^(121/365)]+[(0.05 x (184/365)) x 100.00% x 100.00]/[(1+4.14)^(121/365)] | 101.15 | 44.65 | ki |
Formula Convexidad Valor Final | ||
---|---|---|
Formula | Operacion | Convexidad |
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores] | [1 / [101.15 x ((1 + 4.144) ^ 2)]] x 44.65] | 0.41 |
F. de Emision | 2023-09-08 | ||
F. de Vencimiento | 2025-09-08 | ||
Ajuste | |||
Dias previos para calculo ajuste o interes | |||
Capital | El capital de las Obligaciones Negociables Clase 18 será amortizado en un único pago en la Fecha de Vencimiento. | ||
Interes | Tasa Aplicable: 5%. | ||
Frecuencia | Los intereses se pagarán en forma vencida, semestralmente a partir de la Fecha de Emisión y Liquidación en las siguientes fechas: 8 de marzo de 2024, 8 de septiembre de 2024, 8 de marzo de 2025 y en la Fecha de Vencimiento, es decir, el 8 de septiembre de 2025. | ||
ISIN | ARPAMP5600K9 |