Fecha | Valor Residual | Cap.Actualizado | Interes | Capital | Cupon |
---|---|---|---|---|---|
2021-05-09 | 100.00 | 130.90 | 1.78 | 0.00 | 1.78 |
2021-11-09 | 100.00 | 159.92 | 1.60 | 0.00 | 1.60 |
2022-05-09 | 100.00 | 200.15 | 2.00 | 0.00 | 2.00 |
2022-11-09 | 100.00 | 287.83 | 2.88 | 0.00 | 2.88 |
2023-05-09 | 100.00 | 406.16 | 4.06 | 0.00 | 4.06 |
2023-11-09 | 100.00 | 658.96 | 6.59 | 0.00 | 6.59 |
2024-05-09 | 100.00 | 1542.55 | 15.43 | 0.00 | 15.43 |
2024-11-09 | 80.00 | 1724.80 | 21.56 | 431.20 | 452.76 |
2025-05-09 | 60.00 | 1509.83 | 20.13 | 503.28 | 523.41 |
2025-11-09 | 40.00 | 1010.22 | 15.15 | 505.11 | 520.26 |
2026-05-09 | 20.00 | 505.11 | 10.10 | 505.11 | 515.21 |
2026-11-09 | 0.00 | 0.00 | 5.05 | 505.11 | 510.16 |
Datos | |||||
---|---|---|---|---|---|
Simbolo | TX26 | Valor Tecnico | 1515.41 | Semana TIR | -18.53% |
Emisor | ArgentinaArgentina | Valor Residual | 60.00% | Mes TIR | -13.01% |
Tipo | Soberano | Paridad | 94.56% | Semestre TIR | -82.40% |
País | Argentina | TIR | 7.96% | 1ero Enero TIR | -17.60% |
Mercado | BYMA | Macaulay Dur. | 0.98 | Año TIR | 265.15% |
Moneda | ARS | Modified Dur. | 0.91 | Semana Precio | -24.68% |
Fecha/Hora | 2025-05-09 17:00:25 | Effective Dur. | 0.07 | Mes Precio | -23.43% |
Volumen | 1047081941 | Convexidad | 1.81 | Semestre Precio | -9.39% |
Precio | 1433.00 | Int. Corrido | 0.08 | 1ero Enero Precio | -14.60% |
Variación | 0.46% | Cupon | 520.26 | Año Precio | -16.54% |
Sensibilidad Precio | |||
---|---|---|---|
Precio | Variación Precio | TIR | Variación TIR |
1576.30 | 10.00% | -1.95 | -124.54% |
1561.97 | 9.00% | -1.05 | -113.20% |
1547.64 | 8.00% | -0.13 | -101.64% |
1533.31 | 7.00% | 0.81 | -89.83% |
1518.98 | 6.00% | 1.77 | -77.78% |
1504.65 | 5.00% | 2.75 | -65.49% |
1490.32 | 4.00% | 3.75 | -52.93% |
1475.99 | 3.00% | 4.77 | -40.11% |
1461.66 | 2.00% | 5.81 | -27.02% |
1447.33 | 1.00% | 6.87 | -13.64% |
1433.00 | 0.00% | 7.96 | 0.00% |
1418.67 | -1.00% | 9.08 | 14.01% |
1404.34 | -2.00% | 10.21 | 28.31% |
1390.01 | -3.00% | 11.38 | 42.91% |
1375.68 | -4.00% | 12.57 | 57.86% |
1361.35 | -5.00% | 13.78 | 73.16% |
1347.02 | -6.00% | 15.03 | 88.81% |
1332.69 | -7.00% | 16.31 | 104.84% |
1318.36 | -8.00% | 17.61 | 121.26% |
1304.03 | -9.00% | 18.95 | 138.06% |
1289.70 | -10.00% | 20.32 | 155.29% |
Sensibilidad TIR | |||
---|---|---|---|
TIR | Variación TIR | Precio | Variación Precio |
8.68 | 9.00% | 1423.77 | -0.64% |
8.60 | 8.00% | 1424.79 | -0.57% |
8.52 | 7.00% | 1425.81 | -0.50% |
8.44 | 6.00% | 1426.84 | -0.43% |
8.36 | 5.00% | 1427.87 | -0.36% |
8.28 | 4.00% | 1428.90 | -0.29% |
8.20 | 3.00% | 1429.93 | -0.21% |
8.12 | 2.00% | 1430.96 | -0.14% |
8.04 | 1.00% | 1432.00 | -0.07% |
7.96 | 0.00% | 1433.00 | 0.00% |
7.88 | -1.00% | 1434.07 | 0.07% |
7.80 | -2.00% | 1435.11 | 0.15% |
7.72 | -3.00% | 1436.15 | 0.22% |
7.64 | -4.00% | 1437.19 | 0.29% |
7.56 | -5.00% | 1438.24 | 0.37% |
7.48 | -6.00% | 1439.28 | 0.44% |
7.40 | -7.00% | 1440.33 | 0.51% |
7.32 | -8.00% | 1441.38 | 0.58% |
7.24 | -9.00% | 1442.43 | 0.66% |
Desarrollo TIR 7.96% | ||||
---|---|---|---|---|
Fecha | Formula | Operacion | Factor | Tipo |
2025-11-09 | [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.02 x (180/360)) x 25.2554 x 60.00% x 100.00]/[(1+7.96)^(179/360)] | 14.59 | i |
2025-11-09 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.2554 x 0.2 x 100.00]/[(1+7.96)^(179/360)] | 486.23 | k |
2026-05-09 | [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.02 x (180/360)) x 25.2554 x 40.00% x 100.00]/[(1+7.96)^(359/360)] | 9.36 | i |
2026-05-09 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.2554 x 0.2 x 100.00]/[(1+7.96)^(359/360)] | 467.97 | k |
2026-11-09 | [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.02 x (180/360)) x 25.2554 x 20.00% x 100.00]/[(1+7.96)^(539/360)] | 4.50 | i |
2026-11-09 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.2554 x 0.2 x 100.00]/[(1+7.96)^(539/360)] | 450.38 | k |
Desarrollo Interes Corrido | Fecha | Formula | Operacion | Interes Corrido |
---|---|---|---|
2025-05-10 | (TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones) | (0.02 x (180/360)) x 25.26 x 0.6 x 100.00 x (1/180) | 0.08 |
Desarrollo Duracion Macaulay | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Fecha | Per. Ponderados Formula | Per. Pond. Operacion | Periodos Ponderados | Factor Formula | Factor Operacion | Factor | Factor/Precio | Factor/Precio x Num. Periodos | Cap. o Int. | |
2025-11-09 | (Dias para cupon / Dias Año) | (179 / 360) | 0.50 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.2554 x 0.2 x 100.00]/[(1+7.96)^(179/360)]+[(0.02 x (180/360)) x 25.2554 x 60.00% x 100.00]/[(1+7.96)^(179/360)] | 500.81 | 0.35 | 0.17 | ki | |
2026-05-09 | (Dias para cupon / Dias Año) | (359 / 360) | 1.00 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.2554 x 0.2 x 100.00]/[(1+7.96)^(359/360)]+[(0.02 x (180/360)) x 25.2554 x 40.00% x 100.00]/[(1+7.96)^(359/360)] | 477.31 | 0.33 | 0.33 | ki | |
2026-11-09 | (Dias para cupon / Dias Año) | (539 / 360) | 1.50 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.2554 x 0.2 x 100.00]/[(1+7.96)^(539/360)]+[(0.02 x (180/360)) x 25.2554 x 20.00% x 100.00]/[(1+7.96)^(539/360)] | 454.87 | 0.32 | 0.48 | ki |
Desarrollo Duracion Macaulay Valor Final | |||||||||
---|---|---|---|---|---|---|---|---|---|
Formula | Operacion | Duracion Macaulay | |||||||
Suma Factores | 0.98 | 0.98 |
Desarrollo Duracion Modificada | ||
---|---|---|
Formula | Operacion | Duracion Modificada |
(Macaulay Duration)/(1 + TIR) | (0.98)/(1 + 7.96/100) | 0.91 |
Desarrollo Duracion Efectiva | ||
---|---|---|
Formula | Operacion | Duracion Efectiva |
(P+ - P-)/(2 x Po x ΔTIR) | (1431.96 - 1434.03 )/( 2 x 1433 x 0.01) | 0.07 |
Desarrollo Convexidad Suma Factores | ||||||||
---|---|---|---|---|---|---|---|---|
Fecha | Formula n2+n | Operacion n2+n | Factor n2+n | Formula VAN | Operacion VAN | Factor VAN | Formula n2+n X Factor VAN | Cap. o Int. |
2025-11-09 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (179 / 360) ^ 2 + (179 / 360) | 0.74 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.2554 x 0.2 x 100.00]/[(1+7.96)^(179/360)]+[(0.02 x (180/360)) x 25.2554 x 60.00% x 100.00]/[(1+7.96)^(179/360)] | 500.81 | 372.83 | ki |
2026-05-09 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (359 / 360) ^ 2 + (359 / 360) | 1.99 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.2554 x 0.2 x 100.00]/[(1+7.96)^(359/360)]+[(0.02 x (180/360)) x 25.2554 x 40.00% x 100.00]/[(1+7.96)^(359/360)] | 477.31 | 950.65 | ki |
2026-11-09 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (539 / 360) ^ 2 + (539 / 360) | 3.74 | [CER x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x CER x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [25.2554 x 0.2 x 100.00]/[(1+7.96)^(539/360)]+[(0.02 x (180/360)) x 25.2554 x 20.00% x 100.00]/[(1+7.96)^(539/360)] | 454.87 | 1700.70 | ki |
Formula Convexidad Valor Final | ||
---|---|---|
Formula | Operacion | Convexidad |
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores] | [1 / [1433 x ((1 + 7.963) ^ 2)]] x 3024.18] | 1.81 |
Desarrollo CER | |||
---|---|---|---|
Fecha | CER | ||
2020-08-21 | 22.5440 | ||
2025-04-28 | 569.3573 | ||
    | |||
CER Final/ CER Inicial | 25.2554 |
F. de Emision | 2020-09-04 | ||
F. de Vencimiento | 2026-11-09 | ||
Ajuste | CER | ||
Dias previos para calculo ajuste o interes | 10 | ||
Capital | La amortización se efectuará en CINCO (5) cuotas semestrales iguales el 9 de mayo y el 9 de noviembre de cada año, con la primera cuota el 9 de noviembre de 2024 y la última cuota el 9 de noviembre de 2026 | ||
Interes | Los BONOS DEL TESORO NACIONAL EN PESOS CON AJUSTE POR CER 2,00% VTO. 2026 (BONCER 2026 2,00%) devengarán intereses, a partir del 4 de septiembre de 2020, sobre la base de un año de TRESCIENTOS SESENTA (360) días integrado por DOCE (12) meses de TREINTA (30) días cada uno, a una tasa de DOS POR CIENTO (2,00%). | ||
Frecuencia | Las fechas de pago de intereses para los BONOS DEL TESORO NACIONAL EN PESOS CON AJUSTE POR CER 2,00% VTO. 2026 (BONCER 2026 2,00%) son el 9 de mayo y el 9 de noviembre de cada año, comenzando el 9 de mayo de 2021. | ||
ISIN | ARARGE3209W8 |