Telecom Clase XIV. Dolar Linked 1.00% Vto. 02-2028
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2023-08-10100.0028619.0072.140.0072.14
2023-11-10100.0035000.0088.220.0088.22
2024-02-10100.0083125.00209.520.00209.52
2024-05-10100.0088275.00217.660.00217.66
2024-08-10100.0093967.00236.850.00236.85
2024-11-10100.0095717.00241.260.00241.26
2025-02-10100.0095717.00241.260.00241.26
2025-05-10100.0095717.00233.390.00233.39
2025-08-10100.0095717.00241.260.00241.26
2025-11-10100.0095717.00241.260.00241.26
2026-02-10100.0095717.00241.260.00241.26
2026-05-10100.0095717.00233.390.00233.39
2026-08-10100.0095717.00241.260.00241.26
2026-11-10100.0095717.00241.260.00241.26
2027-02-10100.0095717.00241.260.00241.26
2027-05-10100.0095717.00233.390.00233.39
2027-08-10100.0095717.00241.260.00241.26
2027-11-10100.0095717.00241.260.00241.26
2028-02-100.000.00241.2695717.0095958.26
Datos
SimboloTLCFOValor Tecnico95790.43Semana TIR4.24%
EmisorTelecom Argentina S.ATelecom Argentina S.AValor Residual100.00%Mes TIR6.91%
TipoCorporativoParidad90.09%Semestre TIR-21.87%
PaísArgentinaTIR4.18%1ero Enero TIR-64.40%
MercadoBYMAMacaulay Dur.3.37Año TIR136.43%
MonedaARSModified Dur.3.23Semana Precio0.00%
Fecha/Hora2024-08-09 13:39:50Effective Dur.0.14Mes Precio1.29%
Volumen0Convexidad13.67Semestre Precio19.86%
Precio86300.00Int. Corrido73.431ero Enero Precio60.08%
Variación0.00%Cupon241.26Año Precio154.57%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
94930.0010.00%1.27-69.50%
94067.009.00%1.55-62.93%
93204.008.00%1.83-56.27%
92341.007.00%2.11-49.53%
91478.006.00%2.39-42.72%
90615.005.00%2.68-35.82%
89752.004.00%2.97-28.84%
88889.003.00%3.27-21.77%
88026.002.00%3.57-14.60%
87163.001.00%3.87-7.34%
86300.000.00%4.180.00%
85437.00-1.00%4.497.47%
84574.00-2.00%4.8115.01%
83711.00-3.00%5.1322.68%
82848.00-4.00%5.4530.44%
81985.00-5.00%5.7838.29%
81122.00-6.00%6.1146.26%
80259.00-7.00%6.4554.36%
79396.00-8.00%6.7962.55%
78533.00-9.00%7.1470.86%
77670.00-10.00%7.4979.29%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
4.569.00%85260.35-1.20%
4.518.00%85375.20-1.07%
4.477.00%85490.26-0.94%
4.436.00%85605.52-0.80%
4.395.00%85720.99-0.67%
4.354.00%85836.66-0.54%
4.313.00%85952.53-0.40%
4.262.00%86068.61-0.27%
4.221.00%86184.89-0.13%
4.180.00%86300.000.00%
4.14-1.00%86418.070.14%
4.10-2.00%86534.970.27%
4.05-3.00%86652.080.41%
4.01-4.00%86769.400.54%
3.97-5.00%86886.920.68%
3.93-6.00%87004.650.82%
3.89-7.00%87122.590.95%
3.85-8.00%87240.741.09%
3.80-9.00%87359.101.23%
Desarrollo TIR
Desarrollo TIR 4.18%
FechaFormulaOperacionFactorTipo
2024-11-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(64/365)]239.53i
2025-02-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(156/365)]237.07i
2025-05-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (89/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(245/365)]227.06i
2025-08-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(337/365)]232.31i
2025-11-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(429/365)]229.92i
2026-02-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(521/365)]227.56i
2026-05-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (89/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(610/365)]217.95i
2026-08-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(702/365)]222.99i
2026-11-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(794/365)]220.70i
2027-02-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(886/365)]218.43i
2027-05-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (89/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(975/365)]209.21i
2027-08-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(1067/365)]214.04i
2027-11-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(1159/365)]211.84i
2028-02-10[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(1251/365)]209.67i
2028-02-10[Dolar x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][957.1700 x 1 x 100.00]/[(1+4.18)^(1251/365)]83183.09k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2024-09-07(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones)(0.01 x (92/365)) x 957.17 x 1 x 100.00 x (28/92)73.43
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2024-11-10(Dias para cupon / Dias Año)(64 / 365)0.18[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(64/365)]239.530.000.00i
2025-02-10(Dias para cupon / Dias Año)(156 / 365)0.43[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(156/365)]237.070.000.00i
2025-05-10(Dias para cupon / Dias Año)(245 / 365)0.67[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (89/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(245/365)]227.060.000.00i
2025-08-10(Dias para cupon / Dias Año)(337 / 365)0.92[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(337/365)]232.310.000.00i
2025-11-10(Dias para cupon / Dias Año)(429 / 365)1.18[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(429/365)]229.920.000.00i
2026-02-10(Dias para cupon / Dias Año)(521 / 365)1.43[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(521/365)]227.560.000.00i
2026-05-10(Dias para cupon / Dias Año)(610 / 365)1.67[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (89/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(610/365)]217.950.000.00i
2026-08-10(Dias para cupon / Dias Año)(702 / 365)1.92[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(702/365)]222.980.000.00i
2026-11-10(Dias para cupon / Dias Año)(794 / 365)2.18[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(794/365)]220.690.000.01i
2027-02-10(Dias para cupon / Dias Año)(886 / 365)2.43[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(886/365)]218.430.000.01i
2027-05-10(Dias para cupon / Dias Año)(975 / 365)2.67[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (89/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(975/365)]209.200.000.01i
2027-08-10(Dias para cupon / Dias Año)(1067 / 365)2.92[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(1067/365)]214.030.000.01i
2027-11-10(Dias para cupon / Dias Año)(1159 / 365)3.18[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(1159/365)]211.840.000.01i
2028-02-10(Dias para cupon / Dias Año)(1251 / 365)3.43[Dolar x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][957.1700 x 1 x 100.00]/[(1+4.18)^(1251/365)]+[(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(1251/365)]83390.010.973.31ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores3.373.37
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(3.37)/(1 + 4.18/100)3.23
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(86182.08 - 86415.31 )/( 2 x 86300.00 x 0.01)0.14
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2024-11-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](64 / 365) ^ 2 + (64 / 365)0.21[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(64/365)]239.5349.36i
2025-02-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](156 / 365) ^ 2 + (156 / 365)0.61[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(156/365)]237.07144.63i
2025-05-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](245 / 365) ^ 2 + (245 / 365)1.12[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (89/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(245/365)]227.06254.72i
2025-08-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](337 / 365) ^ 2 + (337 / 365)1.78[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(337/365)]232.31412.52i
2025-11-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](429 / 365) ^ 2 + (429 / 365)2.56[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(429/365)]229.92587.85i
2026-02-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](521 / 365) ^ 2 + (521 / 365)3.46[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(521/365)]227.56788.46i
2026-05-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](610 / 365) ^ 2 + (610 / 365)4.46[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (89/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(610/365)]217.95972.99i
2026-08-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](702 / 365) ^ 2 + (702 / 365)5.62[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(702/365)]222.981253.68i
2026-11-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](794 / 365) ^ 2 + (794 / 365)6.91[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(794/365)]220.691524.43i
2027-02-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](886 / 365) ^ 2 + (886 / 365)8.32[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(886/365)]218.431817.23i
2027-05-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](975 / 365) ^ 2 + (975 / 365)9.81[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (89/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(975/365)]209.202051.60i
2027-08-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1067 / 365) ^ 2 + (1067 / 365)11.47[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(1067/365)]214.032454.74i
2027-11-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1159 / 365) ^ 2 + (1159 / 365)13.26[(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(1159/365)]211.842808.55i
2028-02-10[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1251 / 365) ^ 2 + (1251 / 365)15.17[Dolar x Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Dolar x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][957.1700 x 1 x 100.00]/[(1+4.18)^(1251/365)]+[(0.01 x (92/365)) x 957.1700 x 100.00% x 100.00]/[(1+4.18)^(1251/365)]83390.011265397.49ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [86300.00 x ((1 + 4.181) ^ 2)]] x 1280518.23]13.67
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2023-02-10
F. de Vencimiento2028-02-10
AjusteDolar Linked
Dias previos para calculo ajuste o interes3
CapitalEl capital de las Obligaciones Negociables se pagará integramente al vencimiento
InteresTasa Aplicable: 1.00%
Frecuencia10 de mayo de 2023, 10 de agosto de 2023, 10 de noviembre de 2023, 10 de febrero de 2024, 10 de mayo de 2024, 10 de agosto de 2024, 10 de noviembre de 2024, 10 de febrero de 2025, 10 de mayo de 2025, 10 de agosto de 2025, 10 de noviembre de 2025, 10 de febrero de 2026, 10 de mayo de 2026, 10 de agosto de 2026, 10 de noviembre de 2026, 10 de febrero de 2027, 10 de mayo de 2027, 10 de agosto de 2027, 10 de noviembre de 2027 y 10 de febrero de 2028
ISINARTECO5600G5
¿Ves algun dato que parece incorrecto?