Fecha | Valor Residual | Cap.Actualizado | Interes | Capital | Cupon |
---|---|---|---|---|---|
2021-03-19 | 100.00 | 100.00 | 1.25 | 0.00 | 1.25 |
2021-09-19 | 100.00 | 100.00 | 1.38 | 0.00 | 1.38 |
2022-03-19 | 100.00 | 100.00 | 2.12 | 0.00 | 2.12 |
2022-09-19 | 100.00 | 100.00 | 2.12 | 0.00 | 2.12 |
2023-03-19 | 92.31 | 92.31 | 2.12 | 7.69 | 9.82 |
2023-09-19 | 84.62 | 84.62 | 2.65 | 7.69 | 10.35 |
2024-03-19 | 76.92 | 76.92 | 2.43 | 7.69 | 10.12 |
2024-09-19 | 69.23 | 69.23 | 2.21 | 7.69 | 9.90 |
2025-03-19 | 61.54 | 61.54 | 1.99 | 7.69 | 9.68 |
2025-09-19 | 53.85 | 53.85 | 1.77 | 7.69 | 9.46 |
2026-03-19 | 46.15 | 46.15 | 1.55 | 7.69 | 9.24 |
2026-09-19 | 38.46 | 38.46 | 1.33 | 7.69 | 9.02 |
2027-03-19 | 30.77 | 30.77 | 1.11 | 7.69 | 8.80 |
2027-09-19 | 23.08 | 23.08 | 0.88 | 7.69 | 8.58 |
2028-03-19 | 15.38 | 15.38 | 0.66 | 7.69 | 8.36 |
2028-09-19 | 7.69 | 7.69 | 0.44 | 7.69 | 8.13 |
2029-03-19 | 0.00 | 0.00 | 0.22 | 7.69 | 7.91 |
Datos | |||||
---|---|---|---|---|---|
Simbolo | PM29D | Valor Tecnico | 62.04 | Semana TIR | 0.44% |
Emisor | Pcia. MendozaPcia. Mendoza | Valor Residual | 61.54% | Mes TIR | 2.92% |
Tipo | Provincial | Paridad | 94.13% | Semestre TIR | 1.78% |
País | Argentina | TIR | 9.17% | 1ero Enero TIR | 10.62% |
Mercado | BYMA | Macaulay Dur. | 1.93 | Año TIR | -23.33% |
Moneda | USD | Modified Dur. | 1.77 | Semana Precio | 0.17% |
Fecha/Hora | 2025-05-09 16:17:41 | Effective Dur. | 0.16 | Mes Precio | 0.26% |
Volumen | 55000 | Convexidad | 5.82 | Semestre Precio | -10.77% |
Precio | 58.40 | Int. Corrido | 0.50 | 1ero Enero Precio | -13.03% |
Variación | -0.51% | Cupon | 9.46 | Año Precio | -14.12% |
Sensibilidad Precio | |||
---|---|---|---|
Precio | Variación Precio | TIR | Variación TIR |
64.24 | 10.00% | 3.98 | -56.58% |
63.66 | 9.00% | 4.46 | -51.36% |
63.07 | 8.00% | 4.95 | -46.05% |
62.49 | 7.00% | 5.44 | -40.64% |
61.90 | 6.00% | 5.95 | -35.15% |
61.32 | 5.00% | 6.46 | -29.56% |
60.74 | 4.00% | 6.98 | -23.87% |
60.15 | 3.00% | 7.51 | -18.07% |
59.57 | 2.00% | 8.05 | -12.17% |
58.98 | 1.00% | 8.60 | -6.16% |
58.40 | 0.00% | 9.17 | 0.00% |
57.82 | -1.00% | 9.74 | 6.19% |
57.23 | -2.00% | 10.32 | 12.54% |
56.65 | -3.00% | 10.91 | 19.02% |
56.06 | -4.00% | 11.52 | 25.62% |
55.48 | -5.00% | 12.14 | 32.36% |
54.90 | -6.00% | 12.77 | 39.23% |
54.31 | -7.00% | 13.41 | 46.23% |
53.73 | -8.00% | 14.06 | 53.38% |
53.14 | -9.00% | 14.73 | 60.68% |
52.56 | -10.00% | 15.42 | 68.13% |
Sensibilidad TIR | |||
---|---|---|---|
TIR | Variación TIR | Precio | Variación Precio |
10.00 | 9.00% | 57.56 | -1.45% |
9.90 | 8.00% | 57.65 | -1.29% |
9.81 | 7.00% | 57.74 | -1.13% |
9.72 | 6.00% | 57.83 | -0.97% |
9.63 | 5.00% | 57.93 | -0.81% |
9.54 | 4.00% | 58.02 | -0.65% |
9.45 | 3.00% | 58.11 | -0.49% |
9.35 | 2.00% | 58.21 | -0.33% |
9.26 | 1.00% | 58.30 | -0.17% |
9.17 | 0.00% | 58.40 | 0.00% |
9.08 | -1.00% | 58.49 | 0.15% |
8.99 | -2.00% | 58.58 | 0.32% |
8.89 | -3.00% | 58.68 | 0.48% |
8.80 | -4.00% | 58.78 | 0.64% |
8.71 | -5.00% | 58.87 | 0.81% |
8.62 | -6.00% | 58.97 | 0.97% |
8.53 | -7.00% | 59.06 | 1.14% |
8.44 | -8.00% | 59.16 | 1.30% |
8.34 | -9.00% | 59.26 | 1.47% |
Desarrollo TIR 9.17% | ||||
---|---|---|---|---|
Fecha | Formula | Operacion | Factor | Tipo |
2025-09-19 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0575 x (180/360)) x 61.54% x 100.00]/[(1+9.17)^(129/360)] | 1.71 | i |
2025-09-19 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(129/360)] | 7.45 | k |
2026-03-19 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0575 x (180/360)) x 53.85% x 100.00]/[(1+9.17)^(309/360)] | 1.44 | i |
2026-03-19 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(309/360)] | 7.13 | k |
2026-09-19 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0575 x (180/360)) x 46.15% x 100.00]/[(1+9.17)^(489/360)] | 1.18 | i |
2026-09-19 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(489/360)] | 6.83 | k |
2027-03-19 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0575 x (180/360)) x 38.46% x 100.00]/[(1+9.17)^(669/360)] | 0.94 | i |
2027-03-19 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(669/360)] | 6.54 | k |
2027-09-19 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0575 x (180/360)) x 30.77% x 100.00]/[(1+9.17)^(849/360)] | 0.72 | i |
2027-09-19 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(849/360)] | 6.25 | k |
2028-03-19 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0575 x (180/360)) x 23.08% x 100.00]/[(1+9.17)^(1029/360)] | 0.52 | i |
2028-03-19 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(1029/360)] | 5.99 | k |
2028-09-19 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0575 x (180/360)) x 15.38% x 100.00]/[(1+9.17)^(1209/360)] | 0.33 | i |
2028-09-19 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(1209/360)] | 5.73 | k |
2029-03-19 | [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [(0.0575 x (180/360)) x 7.69% x 100.00]/[(1+9.17)^(1389/360)] | 0.16 | i |
2029-03-19 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(1389/360)] | 5.48 | k |
Desarrollo Interes Corrido | Fecha | Formula | Operacion | Interes Corrido |
---|---|---|---|
2025-05-10 | (TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones) | (0.0575 x (180/360)) x 1.00 x 0.615385 x 100.00 x (51/180) | 0.50 |
Desarrollo Duracion Macaulay | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Fecha | Per. Ponderados Formula | Per. Pond. Operacion | Periodos Ponderados | Factor Formula | Factor Operacion | Factor | Factor/Precio | Factor/Precio x Num. Periodos | Cap. o Int. | |
2025-09-19 | (Dias para cupon / Dias Año) | (129 / 360) | 0.36 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(129/360)]+[(0.0575 x (180/360)) x 61.54% x 100.00]/[(1+9.17)^(129/360)] | 9.17 | 0.16 | 0.06 | ki | |
2026-03-19 | (Dias para cupon / Dias Año) | (309 / 360) | 0.86 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(309/360)]+[(0.0575 x (180/360)) x 53.85% x 100.00]/[(1+9.17)^(309/360)] | 8.57 | 0.15 | 0.13 | ki | |
2026-09-19 | (Dias para cupon / Dias Año) | (489 / 360) | 1.36 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(489/360)]+[(0.0575 x (180/360)) x 46.15% x 100.00]/[(1+9.17)^(489/360)] | 8.01 | 0.14 | 0.19 | ki | |
2027-03-19 | (Dias para cupon / Dias Año) | (669 / 360) | 1.86 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(669/360)]+[(0.0575 x (180/360)) x 38.46% x 100.00]/[(1+9.17)^(669/360)] | 7.47 | 0.13 | 0.24 | ki | |
2027-09-19 | (Dias para cupon / Dias Año) | (849 / 360) | 2.36 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(849/360)]+[(0.0575 x (180/360)) x 30.77% x 100.00]/[(1+9.17)^(849/360)] | 6.97 | 0.12 | 0.28 | ki | |
2028-03-19 | (Dias para cupon / Dias Año) | (1029 / 360) | 2.86 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(1029/360)]+[(0.0575 x (180/360)) x 23.08% x 100.00]/[(1+9.17)^(1029/360)] | 6.50 | 0.11 | 0.32 | ki | |
2028-09-19 | (Dias para cupon / Dias Año) | (1209 / 360) | 3.36 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(1209/360)]+[(0.0575 x (180/360)) x 15.38% x 100.00]/[(1+9.17)^(1209/360)] | 6.06 | 0.10 | 0.35 | ki | |
2029-03-19 | (Dias para cupon / Dias Año) | (1389 / 360) | 3.86 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(1389/360)]+[(0.0575 x (180/360)) x 7.69% x 100.00]/[(1+9.17)^(1389/360)] | 5.64 | 0.10 | 0.37 | ki |
Desarrollo Duracion Macaulay Valor Final | |||||||||
---|---|---|---|---|---|---|---|---|---|
Formula | Operacion | Duracion Macaulay | |||||||
Suma Factores | 1.93 | 1.93 |
Desarrollo Duracion Modificada | ||
---|---|---|
Formula | Operacion | Duracion Modificada |
(Macaulay Duration)/(1 + TIR) | (1.93)/(1 + 9.17/100) | 1.77 |
Desarrollo Duracion Efectiva | ||
---|---|---|
Formula | Operacion | Duracion Efectiva |
(P+ - P-)/(2 x Po x ΔTIR) | (58.31 - 58.49 )/( 2 x 58.4 x 0.01) | 0.16 |
Desarrollo Convexidad Suma Factores | ||||||||
---|---|---|---|---|---|---|---|---|
Fecha | Formula n2+n | Operacion n2+n | Factor n2+n | Formula VAN | Operacion VAN | Factor VAN | Formula n2+n X Factor VAN | Cap. o Int. |
2025-09-19 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (129 / 360) ^ 2 + (129 / 360) | 0.49 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(129/360)]+[(0.0575 x (180/360)) x 61.54% x 100.00]/[(1+9.17)^(129/360)] | 9.17 | 4.46 | ki |
2026-03-19 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (309 / 360) ^ 2 + (309 / 360) | 1.60 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(309/360)]+[(0.0575 x (180/360)) x 53.85% x 100.00]/[(1+9.17)^(309/360)] | 8.57 | 13.67 | ki |
2026-09-19 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (489 / 360) ^ 2 + (489 / 360) | 3.20 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(489/360)]+[(0.0575 x (180/360)) x 46.15% x 100.00]/[(1+9.17)^(489/360)] | 8.01 | 25.65 | ki |
2027-03-19 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (669 / 360) ^ 2 + (669 / 360) | 5.31 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(669/360)]+[(0.0575 x (180/360)) x 38.46% x 100.00]/[(1+9.17)^(669/360)] | 7.47 | 39.71 | ki |
2027-09-19 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (849 / 360) ^ 2 + (849 / 360) | 7.92 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(849/360)]+[(0.0575 x (180/360)) x 30.77% x 100.00]/[(1+9.17)^(849/360)] | 6.97 | 55.24 | ki |
2028-03-19 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (1029 / 360) ^ 2 + (1029 / 360) | 11.03 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(1029/360)]+[(0.0575 x (180/360)) x 23.08% x 100.00]/[(1+9.17)^(1029/360)] | 6.50 | 71.72 | ki |
2028-09-19 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (1209 / 360) ^ 2 + (1209 / 360) | 14.64 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(1209/360)]+[(0.0575 x (180/360)) x 15.38% x 100.00]/[(1+9.17)^(1209/360)] | 6.06 | 88.69 | ki |
2029-03-19 | [(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)] | (1389 / 360) ^ 2 + (1389 / 360) | 18.75 | [Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] | [0.076923 x 100.00]/[(1+9.17)^(1389/360)]+[(0.0575 x (180/360)) x 7.69% x 100.00]/[(1+9.17)^(1389/360)] | 5.64 | 105.76 | ki |
Formula Convexidad Valor Final | ||
---|---|---|
Formula | Operacion | Convexidad |
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores] | [1 / [58.4 x ((1 + 9.1656874999999) ^ 2)]] x 404.89] | 5.82 |
F. de Emision | 2020-10-05 | ||
F. de Vencimiento | 2029-03-19 | ||
Ajuste | |||
Dias previos para calculo ajuste o interes | |||
Capital | El monto total de capital se amortizara en trece cuotas semestrales iguales y consecutivas a vencer los dias 19 de marzo y 19 de septiembre, iniciando el primer pago el 19 de marzo de 2023. | ||
Interes | Devengaran intereses sobre la base de un año de 360 dias integrado por 12 meses de 30 dias cada uno, de la siguiente manera: Desde el 19.05.20 (inclusive) hasta el 19.09.21 (exclusive), 2,75% Desde el 19.09.21 (inclusive) hasta el 19.03.23 (exclusive), 4,25% Desde el 19.03.23 (inclusive) hasta el 19.03.29 (exclusive), 5,75% Seran pagaderos semestralmente el 19 de marzo y el 19 de septiembre de cada año, a partir del 19 de septiembre de 2021. | ||
Frecuencia | Los dias 19 de marzo y el 19 de septiembre de cada año. | ||
ISIN | USP6480JAH07 |