Titulos de Deuda del Neuquen. Vto. 2030
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2023-10-27100.0084765.002807.840.002807.84
2024-04-2792.3195507.083491.987958.9211450.89
2024-10-2784.6296932.863568.898812.0712380.96
2025-04-2776.9291127.723445.779112.7612558.53
2025-10-2769.2379325.343029.798813.9111843.70
2026-04-2761.5470511.432726.818813.9111540.72
2026-10-2753.8561697.512423.838813.9111237.74
2027-04-2746.1552883.602120.858813.9110934.77
2027-10-2738.4644069.691817.878813.9110631.79
2028-04-2730.7735255.771514.908813.9110328.81
2028-10-2723.0826441.861211.928813.9110025.83
2029-04-2715.3817627.94908.948813.919722.85
2029-10-277.698814.03605.968813.919419.87
2030-04-270.000.11302.988813.919116.90
Expresar en moneda de pago MEP
Datos
SimboloNDT25Valor Tecnico88358.08Semana TIR6.08%
EmisorPcia. NeuquenPcia. NeuquenValor Residual76.92%Mes TIR-5.23%
TipoProvincialParidad95.07%Semestre TIR10.00%
PaísArgentinaTIR9.24%1ero Enero TIR14.93%
MercadoBYMAMacaulay Dur.2.42Año TIR-19.79%
MonedaARSModified Dur.2.21Semana Precio-3.89%
Fecha/Hora2025-05-09 16:39:25Effective Dur.0.20Mes Precio-25.20%
Volumen53303Convexidad8.59Semestre Precio-9.39%
Precio84000.00Int. Corrido218.821ero Enero Precio-14.01%
Variación-0.57%Cupon11843.70Año Precio-1.54%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
92400.0010.00%5.08-45.07%
91560.009.00%5.46-40.88%
90720.008.00%5.85-36.64%
89880.007.00%6.25-32.33%
89040.006.00%6.66-27.94%
88200.005.00%7.07-23.48%
87360.004.00%7.49-18.95%
86520.003.00%7.91-14.34%
85680.002.00%8.35-9.66%
84840.001.00%8.79-4.89%
84000.000.00%9.240.00%
83160.00-1.00%9.694.90%
82320.00-2.00%10.169.93%
81480.00-3.00%10.6315.04%
80640.00-4.00%11.1120.25%
79800.00-5.00%11.6025.56%
78960.00-6.00%12.1030.97%
78120.00-7.00%12.6136.49%
77280.00-8.00%13.1342.10%
76440.00-9.00%13.6647.83%
75600.00-10.00%14.2053.67%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
10.079.00%82472.75-1.82%
9.988.00%82639.21-1.62%
9.897.00%82806.27-1.42%
9.796.00%82973.92-1.22%
9.705.00%83142.18-1.02%
9.614.00%83311.03-0.82%
9.523.00%83480.49-0.62%
9.422.00%83650.56-0.42%
9.331.00%83821.24-0.21%
9.240.00%84000.000.00%
9.15-1.00%84164.430.20%
9.06-2.00%84336.960.40%
8.96-3.00%84510.100.61%
8.87-4.00%84683.880.81%
8.78-5.00%84858.281.02%
8.69-6.00%85033.311.23%
8.59-7.00%85208.971.44%
8.50-8.00%85385.271.65%
8.41-9.00%85562.221.86%
Desarrollo TIR
Desarrollo TIR 9.24%
FechaFormulaOperacionFactorTipo
2025-10-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 76.92% x 100.00 x 1145.81]/[(1+9.24)^(167/360)]2908.09i
2025-10-27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(167/360)]8459.88k
2026-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 69.23% x 100.00 x 1145.81]/[(1+9.24)^(347/360)]2504.14i
2026-04-27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(347/360)]8094.19k
2026-10-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 61.54% x 100.00 x 1145.81]/[(1+9.24)^(527/360)]2129.69i
2026-10-27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(527/360)]7744.30k
2027-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 53.85% x 100.00 x 1145.81]/[(1+9.24)^(707/360)]1782.92i
2027-04-27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(707/360)]7409.54k
2027-10-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 46.15% x 100.00 x 1145.81]/[(1+9.24)^(887/360)]1462.16i
2027-10-27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(887/360)]7089.26k
2028-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 38.46% x 100.00 x 1145.81]/[(1+9.24)^(1067/360)]1165.80i
2028-04-27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1067/360)]6782.81k
2028-10-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 30.77% x 100.00 x 1145.81]/[(1+9.24)^(1247/360)]892.32i
2028-10-27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1247/360)]6489.61k
2029-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 23.08% x 100.00 x 1145.81]/[(1+9.24)^(1427/360)]640.32i
2029-04-27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1427/360)]6209.09k
2029-10-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 15.38% x 100.00 x 1145.81]/[(1+9.24)^(1607/360)]408.43i
2029-10-27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1607/360)]5940.69k
2030-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 7.69% x 100.00 x 1145.81]/[(1+9.24)^(1787/360)]195.39i
2030-04-27[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1787/360)]5683.90k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2025-05-10(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP x (Dias Corridos / Dias entre Cupones)(0.06875 x (180/360)) x 1.00 x 0.769231 x 100.00 x 1145.81 x (13/180)218.82
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-10-27(Dias para cupon / Dias Año)(167 / 360)0.46[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(167/360)]+[(0.06875 x (180/360)) x 76.92% x 100.00 x 1145.81]/[(1+9.24)^(167/360)]11368.120.140.06ki
2026-04-27(Dias para cupon / Dias Año)(347 / 360)0.96[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(347/360)]+[(0.06875 x (180/360)) x 69.23% x 100.00 x 1145.81]/[(1+9.24)^(347/360)]10598.640.130.12ki
2026-10-27(Dias para cupon / Dias Año)(527 / 360)1.46[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(527/360)]+[(0.06875 x (180/360)) x 61.54% x 100.00 x 1145.81]/[(1+9.24)^(527/360)]9874.430.120.17ki
2027-04-27(Dias para cupon / Dias Año)(707 / 360)1.96[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(707/360)]+[(0.06875 x (180/360)) x 53.85% x 100.00 x 1145.81]/[(1+9.24)^(707/360)]9193.020.110.21ki
2027-10-27(Dias para cupon / Dias Año)(887 / 360)2.46[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(887/360)]+[(0.06875 x (180/360)) x 46.15% x 100.00 x 1145.81]/[(1+9.24)^(887/360)]8552.060.100.25ki
2028-04-27(Dias para cupon / Dias Año)(1067 / 360)2.96[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1067/360)]+[(0.06875 x (180/360)) x 38.46% x 100.00 x 1145.81]/[(1+9.24)^(1067/360)]7949.320.090.28ki
2028-10-27(Dias para cupon / Dias Año)(1247 / 360)3.46[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1247/360)]+[(0.06875 x (180/360)) x 30.77% x 100.00 x 1145.81]/[(1+9.24)^(1247/360)]7382.710.090.30ki
2029-04-27(Dias para cupon / Dias Año)(1427 / 360)3.96[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1427/360)]+[(0.06875 x (180/360)) x 23.08% x 100.00 x 1145.81]/[(1+9.24)^(1427/360)]6850.230.080.32ki
2029-10-27(Dias para cupon / Dias Año)(1607 / 360)4.46[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1607/360)]+[(0.06875 x (180/360)) x 15.38% x 100.00 x 1145.81]/[(1+9.24)^(1607/360)]6349.980.080.34ki
2030-04-27(Dias para cupon / Dias Año)(1787 / 360)4.96[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1787/360)]+[(0.06875 x (180/360)) x 7.69% x 100.00 x 1145.81]/[(1+9.24)^(1787/360)]5880.170.070.35ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores2.422.42
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(2.42)/(1 + 9.24/100)2.21
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(83827.43 - 84170.54 )/( 2 x 84000 x 0.01)0.20
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-10-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](167 / 360) ^ 2 + (167 / 360)0.68[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(167/360)]+[(0.06875 x (180/360)) x 76.92% x 100.00 x 1145.81]/[(1+9.24)^(167/360)]11368.127719.88ki
2026-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](347 / 360) ^ 2 + (347 / 360)1.89[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(347/360)]+[(0.06875 x (180/360)) x 69.23% x 100.00 x 1145.81]/[(1+9.24)^(347/360)]10598.6420062.91ki
2026-10-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](527 / 360) ^ 2 + (527 / 360)3.61[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(527/360)]+[(0.06875 x (180/360)) x 61.54% x 100.00 x 1145.81]/[(1+9.24)^(527/360)]9874.4335615.67ki
2027-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](707 / 360) ^ 2 + (707 / 360)5.82[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(707/360)]+[(0.06875 x (180/360)) x 53.85% x 100.00 x 1145.81]/[(1+9.24)^(707/360)]9193.0253510.23ki
2027-10-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](887 / 360) ^ 2 + (887 / 360)8.53[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(887/360)]+[(0.06875 x (180/360)) x 46.15% x 100.00 x 1145.81]/[(1+9.24)^(887/360)]8552.0672988.70ki
2028-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1067 / 360) ^ 2 + (1067 / 360)11.75[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1067/360)]+[(0.06875 x (180/360)) x 38.46% x 100.00 x 1145.81]/[(1+9.24)^(1067/360)]7949.3293392.85ki
2028-10-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1247 / 360) ^ 2 + (1247 / 360)15.46[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1247/360)]+[(0.06875 x (180/360)) x 30.77% x 100.00 x 1145.81]/[(1+9.24)^(1247/360)]7382.71114154.60ki
2029-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1427 / 360) ^ 2 + (1427 / 360)19.68[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1427/360)]+[(0.06875 x (180/360)) x 23.08% x 100.00 x 1145.81]/[(1+9.24)^(1427/360)]6850.23134787.21ki
2029-10-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1607 / 360) ^ 2 + (1607 / 360)24.39[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1607/360)]+[(0.06875 x (180/360)) x 15.38% x 100.00 x 1145.81]/[(1+9.24)^(1607/360)]6349.98154877.22ki
2030-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1787 / 360) ^ 2 + (1787 / 360)29.60[Amortizacion % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x Conversion ARS/MEP]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00 x 1145.81]/[(1+9.24)^(1787/360)]+[(0.06875 x (180/360)) x 7.69% x 100.00 x 1145.81]/[(1+9.24)^(1787/360)]5880.17174077.06ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [84000 x ((1 + 9.2366874999999) ^ 2)]] x 861186.34]8.59
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2017-04-27
F. de Vencimiento2030-04-27
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl capital sera amortizado en 13 cuotas iguales y semestrales a partir del 27-04-2024.
Interes15.12.2020 Transferencia por cambio en las condiciones, de conformidad con lo dispuesto por el Ministerio de Economi­a e Infraestructura Provincial, mediante Resoluciones Nro. 238/20 y Nro.240/20. Devengaran intereses semestralmente de la siguiente manera: a) desde el 27.11.2020 (inclusive) hasta el 27.10.2021 exclusive): 2,50% nominal anual; b) desde el 27.10.2021 (inclusive) hasta el 27.10.2022 (exclusive):4,625% nominal anual; c) desde el 27.10.2022 (inclusive) hasta el 27.10.2023 (exclusive): 6,625% nominal anual; d) desde el 27.10.2023 (inclusive) hasta el 27.10.2024 (exclusive): 6,75% nominal anual; e) desde el 27.10.2024 (inclusive) hasta el 27.04.2030 (exclusive): 6,875% nominal anual.
FrecuenciaPaga los dias 27 de Abril y 27 de Octubre
ISINUSP7169GAA78
¿Ves algun dato que parece incorrecto?