Activos agregados recientemente:    GN47D   GN47O   IRCOD   IRCOO   LECGD   LECGO   MGCLO   MSSFD   MSSFO   OTS2D   OTS2O   PECGD   PECGO   PNXCD   PNXCO   S14F5   S15G5   STCED   STCEO   TC25P   TZXO5   TZXO6   TZXY5   YFCGD   YFCGO   YFCID   YFCIO
Titulos de Deuda del Neuquen. Vto. 2030
Cambiar
FechaValor ResidualCap.ActualizadoInteresCapitalCupon
2020-11-27100.00100.000.000.000.00
2021-04-27100.00100.001.040.001.04
2021-10-27100.00100.001.250.001.25
2022-04-27100.00100.002.310.002.31
2022-10-27100.00100.002.310.002.31
2023-04-27100.00100.003.310.003.31
2023-10-27100.00100.003.310.003.31
2024-04-2792.3192.313.387.6911.07
2024-10-2784.6284.623.127.6910.81
2025-04-2776.9276.922.917.6910.60
2025-10-2769.2369.232.647.6910.34
2026-04-2761.5461.542.387.6910.07
2026-10-2753.8553.852.127.699.81
2027-04-2746.1546.151.857.699.54
2027-10-2738.4638.461.597.699.28
2028-04-2730.7730.771.327.699.01
2028-10-2723.0823.081.067.698.75
2029-04-2715.3815.380.797.698.49
2029-10-277.697.690.537.698.22
2030-04-270.000.000.267.697.96
Datos
SimboloNDT5DValor Tecnico85.00Semana TIR3.87%
EmisorPcia. NeuquenPcia. NeuquenValor Residual84.62%Mes TIR-11.12%
TipoProvincialParidad98.75%Semestre TIR-31.73%
PaísArgentinaTIR7.51%1ero Enero TIR-33.24%
MercadoBYMAMacaulay Dur.2.61Año TIR-45.50%
MonedaUSDModified Dur.2.43Semana Precio-0.55%
Fecha/Hora2024-11-20 16:51:31Effective Dur.0.18Mes Precio-9.05%
Volumen0Convexidad10.27Semestre Precio0.29%
Precio83.94Int. Corrido0.391ero Enero Precio-7.21%
Variación0.00%Cupon10.60Año Precio0.05%
Resetear a fecha actual
Resetear a precio actual
Graficos
Sensibilidad
Desarrollo
Simulador
Emision
Sensibilidad Precio
PrecioVariación PrecioTIRVariación TIR
92.3310.00%3.72-50.50%
91.499.00%4.07-45.80%
90.668.00%4.43-41.04%
89.827.00%4.79-36.21%
88.986.00%5.16-31.30%
88.145.00%5.53-26.30%
87.304.00%5.92-21.24%
86.463.00%6.30-16.07%
85.622.00%6.70-10.81%
84.781.00%7.10-5.48%
83.940.00%7.510.00%
83.10-1.00%7.925.48%
82.26-2.00%8.3411.11%
81.42-3.00%8.7716.83%
80.58-4.00%9.2122.66%
79.74-5.00%9.6628.59%
78.90-6.00%10.1134.64%
78.06-7.00%10.5740.80%
77.22-8.00%11.0547.08%
76.39-9.00%11.5353.48%
75.55-10.00%12.0260.02%
Sensibilidad TIR
TIRVariación TIRPrecioVariación Precio
8.199.00%82.57-1.63%
8.118.00%82.72-1.45%
8.047.00%82.87-1.27%
7.966.00%83.02-1.09%
7.895.00%83.17-0.92%
7.814.00%83.32-0.74%
7.743.00%83.47-0.55%
7.662.00%83.63-0.37%
7.591.00%83.78-0.19%
7.510.00%83.940.00%
7.43-1.00%84.090.17%
7.36-2.00%84.240.36%
7.28-3.00%84.390.54%
7.21-4.00%84.550.72%
7.13-5.00%84.700.91%
7.06-6.00%84.861.10%
6.98-7.00%85.021.28%
6.91-8.00%85.171.47%
6.83-9.00%85.331.66%
Desarrollo TIR
Desarrollo TIR 7.51%
FechaFormulaOperacionFactorTipo
2025-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 84.62% x 100.00]/[(1+7.51)^(156/360)]2.82i
2025-04-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(156/360)]7.45k
2025-10-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 76.92% x 100.00]/[(1+7.51)^(336/360)]2.47i
2025-10-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(336/360)]7.19k
2026-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 69.23% x 100.00]/[(1+7.51)^(516/360)]2.15i
2026-04-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(516/360)]6.93k
2026-10-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 61.54% x 100.00]/[(1+7.51)^(696/360)]1.84i
2026-10-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(696/360)]6.69k
2027-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 53.85% x 100.00]/[(1+7.51)^(876/360)]1.55i
2027-04-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(876/360)]6.45k
2027-10-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 46.15% x 100.00]/[(1+7.51)^(1056/360)]1.28i
2027-10-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1056/360)]6.22k
2028-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 38.46% x 100.00]/[(1+7.51)^(1236/360)]1.03i
2028-04-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1236/360)]6.00k
2028-10-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 30.77% x 100.00]/[(1+7.51)^(1416/360)]0.80i
2028-10-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1416/360)]5.79k
2029-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 23.08% x 100.00]/[(1+7.51)^(1596/360)]0.58i
2029-04-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1596/360)]5.58k
2029-10-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 15.38% x 100.00]/[(1+7.51)^(1776/360)]0.37i
2029-10-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1776/360)]5.38k
2030-04-27[(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][(0.06875 x (180/360)) x 7.69% x 100.00]/[(1+7.51)^(1956/360)]0.18i
2030-04-27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1956/360)]5.19k
Desarrollo Interes Corrido
Desarrollo Interes Corrido
FechaFormulaOperacionInteres Corrido
2024-11-21(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal x (Dias Corridos / Dias entre Cupones)(0.06875 x (180/360)) x 1.00 x 0.846154 x 100.00 x (24/180)0.39
Desarrollo Duracion Macaulay
Desarrollo Duracion Macaulay
FechaPer. Ponderados FormulaPer. Pond. OperacionPeriodos PonderadosFactor FormulaFactor OperacionFactorFactor/PrecioFactor/Precio x Num. PeriodosCap. o Int.
2025-04-27(Dias para cupon / Dias Año)(156 / 360)0.43[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(156/360)]+[(0.06875 x (180/360)) x 84.62% x 100.00]/[(1+7.51)^(156/360)]10.270.120.05ki
2025-10-27(Dias para cupon / Dias Año)(336 / 360)0.93[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(336/360)]+[(0.06875 x (180/360)) x 76.92% x 100.00]/[(1+7.51)^(336/360)]9.660.120.11ki
2026-04-27(Dias para cupon / Dias Año)(516 / 360)1.43[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(516/360)]+[(0.06875 x (180/360)) x 69.23% x 100.00]/[(1+7.51)^(516/360)]9.080.110.16ki
2026-10-27(Dias para cupon / Dias Año)(696 / 360)1.93[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(696/360)]+[(0.06875 x (180/360)) x 61.54% x 100.00]/[(1+7.51)^(696/360)]8.530.100.20ki
2027-04-27(Dias para cupon / Dias Año)(876 / 360)2.43[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(876/360)]+[(0.06875 x (180/360)) x 53.85% x 100.00]/[(1+7.51)^(876/360)]8.000.100.23ki
2027-10-27(Dias para cupon / Dias Año)(1056 / 360)2.93[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1056/360)]+[(0.06875 x (180/360)) x 46.15% x 100.00]/[(1+7.51)^(1056/360)]7.500.090.26ki
2028-04-27(Dias para cupon / Dias Año)(1236 / 360)3.43[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1236/360)]+[(0.06875 x (180/360)) x 38.46% x 100.00]/[(1+7.51)^(1236/360)]7.030.080.29ki
2028-10-27(Dias para cupon / Dias Año)(1416 / 360)3.93[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1416/360)]+[(0.06875 x (180/360)) x 30.77% x 100.00]/[(1+7.51)^(1416/360)]6.580.080.31ki
2029-04-27(Dias para cupon / Dias Año)(1596 / 360)4.43[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1596/360)]+[(0.06875 x (180/360)) x 23.08% x 100.00]/[(1+7.51)^(1596/360)]6.160.070.33ki
2029-10-27(Dias para cupon / Dias Año)(1776 / 360)4.93[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1776/360)]+[(0.06875 x (180/360)) x 15.38% x 100.00]/[(1+7.51)^(1776/360)]5.750.070.34ki
2030-04-27(Dias para cupon / Dias Año)(1956 / 360)5.43[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1956/360)]+[(0.06875 x (180/360)) x 7.69% x 100.00]/[(1+7.51)^(1956/360)]5.370.060.35ki
Desarrollo Duracion Macaulay Valor Final
FormulaOperacionDuracion Macaulay
Suma Factores2.612.61
Desarrollo Duracion Modificada
Desarrollo Duracion Modificada
FormulaOperacionDuracion Modificada
(Macaulay Duration)/(1 + TIR)(2.61)/(1 + 7.51/100)2.43
Desarrollo Duracion Efectiva
Desarrollo Duracion Efectiva
FormulaOperacionDuracion Efectiva
(P+ - P-)/(2 x Po x ΔTIR)(83.79 - 84.09 )/( 2 x 83.94 x 0.01)0.18
Desarrollo Convexidad
Desarrollo Convexidad Suma Factores
FechaFormula n2+nOperacion n2+nFactor n2+nFormula VANOperacion VANFactor VANFormula n2+n X Factor VANCap. o Int.
2025-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](156 / 360) ^ 2 + (156 / 360)0.62[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(156/360)]+[(0.06875 x (180/360)) x 84.62% x 100.00]/[(1+7.51)^(156/360)]10.276.38ki
2025-10-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](336 / 360) ^ 2 + (336 / 360)1.80[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(336/360)]+[(0.06875 x (180/360)) x 76.92% x 100.00]/[(1+7.51)^(336/360)]9.6617.43ki
2026-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](516 / 360) ^ 2 + (516 / 360)3.49[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(516/360)]+[(0.06875 x (180/360)) x 69.23% x 100.00]/[(1+7.51)^(516/360)]9.0831.67ki
2026-10-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](696 / 360) ^ 2 + (696 / 360)5.67[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(696/360)]+[(0.06875 x (180/360)) x 61.54% x 100.00]/[(1+7.51)^(696/360)]8.5348.36ki
2027-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](876 / 360) ^ 2 + (876 / 360)8.35[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(876/360)]+[(0.06875 x (180/360)) x 53.85% x 100.00]/[(1+7.51)^(876/360)]8.0066.85ki
2027-10-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1056 / 360) ^ 2 + (1056 / 360)11.54[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1056/360)]+[(0.06875 x (180/360)) x 46.15% x 100.00]/[(1+7.51)^(1056/360)]7.5086.58ki
2028-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1236 / 360) ^ 2 + (1236 / 360)15.22[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1236/360)]+[(0.06875 x (180/360)) x 38.46% x 100.00]/[(1+7.51)^(1236/360)]7.03107.02ki
2028-10-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1416 / 360) ^ 2 + (1416 / 360)19.40[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1416/360)]+[(0.06875 x (180/360)) x 30.77% x 100.00]/[(1+7.51)^(1416/360)]6.58127.72ki
2029-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1596 / 360) ^ 2 + (1596 / 360)24.09[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1596/360)]+[(0.06875 x (180/360)) x 23.08% x 100.00]/[(1+7.51)^(1596/360)]6.16148.29ki
2029-10-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1776 / 360) ^ 2 + (1776 / 360)29.27[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1776/360)]+[(0.06875 x (180/360)) x 15.38% x 100.00]/[(1+7.51)^(1776/360)]5.75168.38ki
2030-04-27[(Dias para cupon / Año)] ^ 2 + [(Dias para cupon / Año)](1956 / 360) ^ 2 + (1956 / 360)34.95[Amortizacion % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)] + [(TNA x (Dias entre Cupones/Año)) x Valor Residual % x Valor Nominal]/[(1+TIR)^(Dias restantes/Dias año)][0.076923 x 100.00]/[(1+7.51)^(1956/360)]+[(0.06875 x (180/360)) x 7.69% x 100.00]/[(1+7.51)^(1956/360)]5.37187.69ki
Formula Convexidad Valor Final
FormulaOperacionConvexidad
[[1 / [Precio x ((1 + TIR) ^ 2)] x Suma Factores][1 / [83.94 x ((1 + 7.5066875000001) ^ 2)]] x 996.37]10.27
Recalcula todos las metricas y desarrollos al cierre de la fecha ingresada
Calcula una serie de metricas a la fecha actual sobre el precio ingresado
F. de Emision2017-04-27
F. de Vencimiento2030-04-27
Ajuste
Dias previos para calculo ajuste o interes
CapitalEl capital sera amortizado en 13 cuotas iguales y semestrales a partir del 27-04-2024.
Interes15.12.2020 Transferencia por cambio en las condiciones, de conformidad con lo dispuesto por el Ministerio de Economi­a e Infraestructura Provincial, mediante Resoluciones Nro. 238/20 y Nro.240/20. Devengaran intereses semestralmente de la siguiente manera: a) desde el 27.11.2020 (inclusive) hasta el 27.10.2021 exclusive): 2,50% nominal anual; b) desde el 27.10.2021 (inclusive) hasta el 27.10.2022 (exclusive):4,625% nominal anual; c) desde el 27.10.2022 (inclusive) hasta el 27.10.2023 (exclusive): 6,625% nominal anual; d) desde el 27.10.2023 (inclusive) hasta el 27.10.2024 (exclusive): 6,75% nominal anual; e) desde el 27.10.2024 (inclusive) hasta el 27.04.2030 (exclusive): 6,875% nominal anual.
FrecuenciaPaga los dias 27 de Abril y 27 de Octubre
ISINUSP7169GAA78
¿Ves algun dato que parece incorrecto?